
Cabral’s pre-production infill drilling validates high-grade oxide resources ahead of the Q4 2026 heap-leach ramp-up at its project.
Cabral Gold Drills 25m @ 7.5 g/t Gold Including 10m @ 17.1 g/t Gold as Part of Pre-Production Infill Drilling, MG Gold Deposit, Cuiu Cuiu Gold District, Brazil