Northwire Canada EditionTuesday, August 11, 2026
Northwire
CUEX 0.090 +5.9% RAK 0.170 −2.9% TGOL 0.135 +8.0% DEC 0.085 +0.0% NWST 0.290 +1.8% CDA 0.900 +5.9% AVL 5.07 +0.4% FSY 0.570 +0.0% GTC 0.800 +12.7% FCI 0.460 +4.5% IDEX 0.365 +5.8% MERG 0.920 +10.8% CNL 19.87 +0.5% ALGR 0.630 −3.1% MEK 0.055 +10.0% LEGY 0.990 +0.0% CUEX 0.090 +5.9% RAK 0.170 −2.9% TGOL 0.135 +8.0% DEC 0.085 +0.0% NWST 0.290 +1.8% CDA 0.900 +5.9% AVL 5.07 +0.4% FSY 0.570 +0.0% GTC 0.800 +12.7% FCI 0.460 +4.5% IDEX 0.365 +5.8% MERG 0.920 +10.8% CNL 19.87 +0.5% ALGR 0.630 −3.1% MEK 0.055 +10.0% LEGY 0.990 +0.0%

← Back to our analysis

Original News Release Routine +

Thunder Gold Intersects 661.5 Metres of Continuous Gold Mineralization Averaging 0.554 g/t Au

Thunder Bay, Ontario--(Newsfile Corp. - August 11, 2026) - Thunder Gold Corp. (TSXV: TGOL) (FSE: Z25) (OTCQB: TGOLF) ("Thunder Gold" or the "Company") is pleased to announce exploration diamond drill results from the Bench Target, at the Company's flagship Tower Mountain Property, 40 kilometres west of Thunder Bay, Ontario. Highlights: Longest continuously mineralized interval reported to date: 661.5 metres averaging 0.554 g/t Au; Longest continuous interval greater than 1.0 g/t Au: 24.0 metres averaging 1.815 g/t Au; Strong resource expansion relevance: 516.0 metres averaging 0.503 g/t Au inside 2026 Mineral Resource Estimate ("MRE") pit shell; Mineralization extends below the current pit shell: 145.5 metres averaging 0.731 g/t Au immediately below MRE pit shell; Hole TM26-210 ended in mineralization: Supports the interpreted sub-vertical continuity of the Bench target and indicates the alteration system remains open down-dip. TM26-210 targeted the interpreted continuation of the 300+ metre wide, sub-vertical zone of brecciated and altered volcanic-intrusive rocks of the Bench Target. The hole followed the eastern edge of the current optimized pit constraining the 2026 MRE, along the 100-metre interpolation limit utilized to estimate inferred resources. The hole lies 100 metres below holes TM21-120 (399.0 metres averaging 0.458 g/t Au) and TM22-134 (318.0 metres averaging 0.452 g/t Au), both of which terminated prematurely in mineralization (Reference Figure 1.0). Elevated gold values were intersected 50 metres earlier than anticipated and continued 75 metres past the interpreted lower limit. The hole ended in mineralization suggesting potential to further increase the inferred resource at depth. Wes Hanson, President and CEO, states, "TM26-210 was an across-the-board success, currently the best hole ever reported at Tower Mountain. The hole clearly demonstrates potential to increase resources immediately adjacent to the currently defined optimized pit constraining the 2026 MRE with the deepest portion of the hole returning broad, consistent mineralization greater than 1.0 g/t Au on a sustained basis with an absence of outlier values. It clearly supports the 100-metre search radius used for the 2026 MRE and demonstrates that there are immediate opportunities with, and immediately adjacent to the optimized pit to increase and reclassify the 2026 MRE. This hole clearly supports our assertion that drilling to date has failed to adequately define the limits of the alteration halo hosting mineralization. The results certainly support the sub-vertical continuity of the zone and demonstrate potential for additional discovery at depth." Mineralization occurs entirely within a sub-vertical, variably brecciated and altered sequence of intermediate volcanics and alkalic intrusives parallel to the central Tower Mountain Intrusive Complex ("TMIC") The brecciated sequence is cut by millimetre scale quartz-carbonate-tourmaline stockworks. Pyrite, ranging from trace to 5% (locally) is persistent throughout all observed lithologies except for late intermediate to mafic dikes, the only barren rocks observed to date. Table 1.0 (below) shows the collar location data for hole TM26-210. Table 1.0 – TM26-210 – Collar Location, Bearing and Dip Easting Northing Elevation Bearing Dip Total Depth 300937 5377793 481 220 -55 750   Table 2.0 (below) summarizes the entirety of TM26-210 from the bedrock-overburden contact to the end of the hole which terminated in mineralization. Three (3) barren dikes were intersected within the mineralized zone at 129.0 metres (27.0 metres), 189.0 metres (7.5 metres) and 733.5 metres (12.0 metres), collectively representing 7% of the total interval length observed. Four (4) intervals returned average grades less than the 0.19 g/t cut-off grade used to define the 2026 MRE. The bottom of the hole, under the current optimized pit limit used to report the 2026 MRE returned the longest, continuous interval greater than 1.0 g/t Au ever observed at Tower Mountain, clearly demonstrating opportunity to not only increase mineral resource but suggesting that the system may be strengthening with depth. Approximately 516 metres of the reported 661.5 metre interval is within the current optimized pit shell defining the 2026 MRE. Table 2.0 – Summary of Significant Results – TM26-210 To view an enhanced version of this graphic, please visit: https://images.newsfilecorp.com/files/5364/309121_1f991a68d4d93af3_001full.jpg Table 3.0 (below) presents the individual sample results for the entirety of TM26-210. Table 3.0 – TM26-210 Interval Results From To Au g/t From To Au g/t From To Au g/t 6 7.5 0.034 69 70.5 0.095 132 133.5 0.092 7.5 9 0.044 70.5 72 0.087 133.5 135 0.071 9 10.5 0.021 72 73.5 0.079 135 136.5 0.044 10.5 12 0.042 73.5 75 0.124 136.5 138 0.003 12 13.5 0.051 75 76.5 0.033 138 139.5 0.055 13.5 15 0.032 76.5 78 0.021 139.5 141 0.065 15 16.5 0.016 78 79.5 0.028 141 142.5 0.065 16.5 18 0.014 79.5 81 0.050 142.5 144 0.150 18 19.5 0.026 81 82.5 0.089 144 145.5 0.054 19.5 21 0.030 82.5 84 0.076 145.5 147 0.097 21 22.5 0.086 84 85.5 0.052 147 148.5 0.042 22.5 24 0.067 85.5 87 0.090 148.5 150 0.134 24 25.5 0.143 87 88.5 0.072 150 151.5 0.063 25.5 27 0.565 88.5 90 0.155 151.5 153 0.073 27 28.5 0.262 90 91.5 0.219 153 154.5 0.056 28.5 30 0.124 91.5 93 0.199 154.5 156 0.085 30 31.5 0.094 93 94.5 0.101 156 157.5 0.394 31.5 33 0.049 94.5 96 0.200 157.5 159 0.151 33 34.5 0.070 96 97.5 0.207 159 160.5 0.121 34.5 36 0.024 97.5 99 0.094 160.5 162 0.181 36 37.5 0.071 99 100.5 0.111 162 163.5 0.138 37.5 39 0.041 100.5 102 0.104 163.5 165 0.201 39 40.5 0.036 102 103.5 0.082 165 166.5 0.267 40.5 42 0.029 103.5 105 0.066 166.5 168 0.137 42 43.5 0.050 105 106.5 0.077 168 169.5 0.119 43.5 45 0.065 106.5 108 0.167 169.5 171 0.106 45 46.5 0.041 108 109.5 0.115 171 172.5 13.200 46.5 48 0.045 109.5 111 6.740 172.5 174 0.255 48 49.5 0.038 111 112.5 0.048 174 175.5 0.181 49.5 51 0.066 112.5 114 0.189 175.5 177 0.000 51 52.5 0.054 114 115.5 0.057 177 178.5 0.100 52.5 54 0.053 115.5 117 0.122 178.5 180 0.122 54 55.5 0.022 117 118.5 0.040 180 181.5 0.465 55.5 57 0.026 118.5 120 0.139 181.5 183 0.846 57 58.5 0.030 120 121.5 0.146 183 184.5 0.282 58.5 60 0.037 121.5 123 0.130 184.5 186 0.132 60 61.5 0.099 123 124.5 0.184 186 187.5 0.150 61.5 63 0.158 124.5 126 0.140 187.5 189 0.186 63 64.5 0.037 126 127.5 0.523 189 190.5 0.090 64.5 66 0.029 127.5 129 0.441 190.5 192 0.038 66 67.5 0.021 129 130.5 0.080 192 193.5 0.058 67.5 69 0.075 130.5 132 0.043 193.5 195 0.067 From To Au g/t From To Au g/t From To Au g/t 195 196.5 0.058 258 259.5 0.007 321 322.5 0.135 196.5 198 0.625 259.5 261 0.008 322.5 324 0.458 198 199.5 0.254 261 262.5 0.061 324 325.5 0.250 199.5 201 0.258 262.5 264 0.047 325.5 327 0.385 201 202.5 1.580 264 265.5 0.049 327 328.5 0.290 202.5 204 1.760 265.5 267 0.045 328.5 330 0.208 204 205.5 7.090 267 268.5 0.034 330 331.5 0.222 205.5 207 2.110 268.5 270 0.084 331.5 333 0.203 207 208.5 1.920 270 271.5 0.167 333 334.5 1.490 208.5 210 1.690 271.5 273 0.043 334.5 336 0.511 210 211.5 1.130 273 274.5 0.085 336 337.5 2.110 211.5 213 0.155 274.5 276 0.079 337.5 339 0.234 213 214.5 0.149 276 277.5 0.048 339 340.5 0.347 214.5 216 0.135 277.5 279 0.076 340.5 342 0.189 216 217.5 0.160 279 280.5 0.140 342 343.5 0.851 217.5 219 0.132 280.5 282 0.077 343.5 345 0.526 219 220.5 0.225 282 283.5 0.159 345 346.5 0.638 220.5 222 0.195 283.5 285 0.124 346.5 348 0.461 222 223.5 0.127 285 286.5 0.053 348 349.5 0.555 223.5 225 0.148 286.5 288 0.085 349.5 351 0.185 225 226.5 0.141 288 289.5 0.207 351 352.5 0.228 226.5 228 0.101 289.5 291 0.168 352.5 354 0.331 228 229.5 0.133 291 292.5 0.177 354 355.5 0.224 229.5 231 0.183 292.5 294 0.225 355.5 357 0.389 231 232.5 0.072 294 295.5 0.142 357 358.5 0.525 232.5 234 0.072 295.5 297 0.052 358.5 360 0.486 234 235.5 0.070 297 298.5 0.114 360 361.5 0.256 235.5 237 0.149 298.5 300 0.104 361.5 363 0.357 237 238.5 0.119 300 301.5 0.226 363 364.5 0.252 238.5 240 0.092 301.5 303 0.203 364.5 366 0.326 240 241.5 0.167 303 304.5 0.131 366 367.5 0.362 241.5 243 0.154 304.5 306 0.085 367.5 369 0.251 243 244.5 0.221 306 307.5 0.132 369 370.5 0.858 244.5 246 0.138 307.5 309 0.170 370.5 372 0.404 246 247.5 0.114 309 310.5 0.293 372 373.5 0.003 247.5 249 0.146 310.5 312 0.370 373.5 375 0.054 249 250.5 0.000 312 313.5 0.192 375 376.5 0.168 250.5 252 0.165 313.5 315 0.150 376.5 378 0.302 252 253.5 0.151 315 316.5 0.192 378 379.5 0.164 253.5 255 0.221 316.5 318 0.271 379.5 381 0.321 255 256.5 0.101 318 319.5 0.230 381 382.5 0.720 256.5 258 0.012 319.5 321 0.341 382.5 384 0.909 From To Au g/t From To Au g/t From To Au g/t 384 385.5 0.396 447 448.5 1.250 510 511.5 0.933 385.5 387 0.415 448.5 450 0.458 511.5 513 0.648 387 388.5 0.253 450 451.5 0.304 513 514.5 1.220 388.5 390 0.271 451.5 453 0.280 514.5 516 3.400 390 391.5 0.598 453 454.5 0.090 516 517.5 0.751 391.5 393 0.389 454.5 456 0.631 517.5 519 0.244 393 394.5 0.364 456 457.5 0.627 519 520.5 0.294 394.5 396 0.153 457.5 459 0.912 520.5 522 0.247 396 397.5 0.657 459 460.5 0.825 522 523.5 0.273 397.5 399 0.230 460.5 462 0.240 523.5 525 0.322 399 400.5 0.136 462 463.5 0.664 525 526.5 0.949 400.5 402 0.095 463.5 465 0.593 526.5 528 1.260 402 403.5 0.166 465 466.5 0.242 528 529.5 1.220 403.5 405 0.451 466.5 468 0.343 529.5 531 1.390 405 406.5 0.527 468 469.5 0.248 531 532.5 2.390 406.5 408 0.409 469.5 471 0.221 532.5 534 1.030 408 409.5 0.155 471 472.5 0.066 534 535.5 1.750 409.5 411 0.210 472.5 474 0.112 535.5 537 0.431 411 412.5 0.095 474 475.5 0.085 537 538.5 0.152 412.5 414 0.076 475.5 477 0.189 538.5 540 1.380 414 415.5 0.030 477 478.5 0.181 540 541.5 1.120 415.5 417 0.201 478.5 480 1.330 541.5 543 2.060 417 418.5 0.204 480 481.5 0.229 543 544.5 2.400 418.5 420 0.167 481.5 483 0.490 544.5 546 4.260 420 421.5 0.091 483 484.5 1.950 546 547.5 0.879 421.5 423 0.156 484.5 486 0.216 547.5 549 0.750 423 424.5 0.265 486 487.5 0.108 549 550.5 0.382 424.5 426 0.460 487.5 489 0.267 550.5 552 0.516 426 427.5 0.370 489 490.5 0.101 552 553.5 0.483 427.5 429 0.084 490.5 492 0.094 553.5 555 0.279 429 430.5 0.291 492 493.5 0.366 555 556.5 0.094 430.5 432 3.080 493.5 495 0.849 556.5 558 0.239 432 433.5 17.200 495 496.5 0.408 558 559.5 0.426 433.5 435 0.780 496.5 498 0.200 559.5 561 0.164 435 436.5 1.020 498 499.5 0.526 561 562.5 0.763 436.5 438 0.375 499.5 501 0.140 562.5 564 0.158 438 439.5 0.140 501 502.5 0.208 564 565.5 0.339 439.5 441 0.428 502.5 504 0.356 565.5 567 0.199 441 442.5 0.132 504 505.5 0.625 567 568.5 0.445 442.5 444 0.357 505.5 507 0.604 568.5 570 0.330 444 445.5 1.900 507 508.5 1.000 570 571.5 0.487 445.5 447 1.260 508.5 510 0.489 571.5 573 0.223 From To Au g/t From To Au g/t From To Au g/t 573 574.5 0.883 636 637.5 2.270 699 700.5 0.170 574.5 576 0.577 637.5 639 1.380 700.5 702 0.520 576 577.5 0.055 639 640.5 2.790 702 703.5 0.513 577.5 579 0.058 640.5 642 1.340 703.5 705 0.214 579 580.5 0.202 642 643.5 1.180 705 706.5 0.299 580.5 582 0.495 643.5 645 1.510 706.5 708 0.590 582 583.5 0.191 645 646.5 1.150 708 709.5 0.111 583.5 585 0.140 646.5 648 2.610 709.5 711 0.258 585 586.5 0.138 648 649.5 1.020 711 712.5 0.395 586.5 588 0.175 649.5 651 1.210 712.5 714 1.170 588 589.5 0.075 651 652.5 1.210 714 715.5 0.078 589.5 591 0.065 652.5 654 2.370 715.5 717 0.083 591 592.5 0.096 654 655.5 1.180 717 718.5 0.488 592.5 594 0.131 655.5 657 0.702 718.5 720 1.360 594 595.5 0.071 657 658.5 2.610 720 721.5 0.103 595.5 597 0.145 658.5 660 1.010 721.5 723 0.029 597 598.5 0.033 660 661.5 2.320 723 724.5 0.390 598.5 600 0.219 661.5 663 1.600 724.5 726 0.166 600 601.5 1.560 663 664.5 1.090 726 727.5 0.476 601.5 603 1.370 664.5 666 0.395 727.5 729 0.134 603 604.5 0.625 666 667.5 0.648 729 730.5 0.054 604.5 606 0.401 667.5 669 0.022 730.5 732 0.062 606 607.5 0.098 669 670.5 1.080 732 733.5 0.479 607.5 609 0.440 670.5 672 0.698 733.5 735 0.096 609 610.5 0.072 672 673.5 0.634 735 736.5 0.028 610.5 612 0.063 673.5 675 1.490 736.5 738 0.059 612 613.5 0.166 675 676.5 1.740 738 739.5 0.033 613.5 615 0.493 676.5 678 0.591 739.5 741 0.062 615 616.5 0.274 678 679.5 0.327 741 742.5 0.019 616.5 618 0.479 679.5 681 0.257 742.5 744 0.011 618 619.5 0.380 681 682.5 0.385 744 745.5 0.040 619.5 621 0.826 682.5 684 0.108 745.5 747 0.146 621 622.5 0.714 684 685.5 0.209 747 748.5 0.221 622.5 624 1.480 685.5 687 0.100 748.5 750 0.603 624 625.5 1.570 687 688.5 0.153 625.5 627 1.260 688.5 690 0.219 627 628.5 0.861 690 691.5 0.141 628.5 630 1.490 691.5 693 0.812 630 631.5 0.621 693 694.5 0.814 631.5 633 2.420 694.5 696 0.155 633 634.5 3.310 696 697.5 0.205 634.5 636 2.100 697.5 699 0.146   Figure 1.0 presents a sectional view of TM26-210 for reference. Figure 1.0 – Diamond Drill Plan, UV Target, February to June 2026 To view an enhanced version of this graphic, please visit: https://images.newsfilecorp.com/files/5364/309121_1f991a68d4d93af3_002full.jpg Figures 2 through 4 are core photos of the 24.0 metre interval of continuous results greater than 1.0 g/t Au, the longest continuously mineralized interval greater than 1.0 g/t ever intersected at Tower Mountain in over 50,000 metres of drilling. Figure 2.0 – TM26-210 624.8 metres to 642.1 metres To view an enhanced version of this graphic, please visit: https://images.newsfilecorp.com/files/5364/309121_1f991a68d4d93af3_003full.jpg Figure 3.0 – TM26-210 642.1 metres to 659.5 metres To view an enhanced version of this graphic, please visit: https://images.newsfilecorp.com/files/5364/309121_1f991a68d4d93af3_004full.jpg Figure 4.0 – TM26-210 659.5 metres to 677.3 metres To view an enhanced version of this graphic, please visit: https://images.newsfilecorp.com/files/5364/309121_thundergoldfig4en.jpg Quality Assurance and Quality Control Diamond drilling utilizes NQ diameter tooling. The core is received at the on-site logging facility where it is, photographed, logged for geotechnical, physical properties and geological data. Samples are identified, recorded, and cut in half by wet diamond saw. Half the core is sent for assay at an accredited laboratory with the remaining half core stored on site. A standard sample length of 1.5 meters is typically employed, varying only at major lithological contacts.  Certified standards and blanks are randomly inserted into the sample stream and constitute approximately 10% of the sample stream.  Certified standards and blank performance is monitored with any failures evaluated and investigated to determine if said failure is a result of error during submission. Any unexplained failures are identified and the five samples preceding and following the failure are re-assayed. Commencing in 2026, duplicate pulps are prepared at a rate of 1 in every 20 samples. The duplicate pulps are sent to a second independent analytical facility for analyses. Activation Laboratories Ltd., Thunder Bay, Ontario, ISO/IEC 17025:2017 is the primary independent analytical service provider. AGAT Laboratories, Thunder Bay, Ontario, ISO/IEC 17025:2017 is the secondary, independent analytical facility.  Samples are, received, dried, crushed to 80% passing 2.0 mm. A 250-gram sample is split and pulverized. Samples are analyzed for gold using a 30-gram lead collection fire assay fusion (FA) with an atomic absorption (AAS) finish. All assay results greater than 5.0 g/t Au are re-assayed using a gravimetric analysis. All assays greater than 30.0 g/t Au are re-assayed using screen metallics where a representative 1000-gram sample is split sieved at 149µm. Assays are performed on the entire +149 µm fraction and two splits of the -149 µm fraction. A final assay is calculated based on the weight of each size fraction. Qualified Person Technical information in this news release has been reviewed and approved by Wes Hanson, P.Geo., President and CEO of Thunder Gold Corp., who is a Qualified Person under the definitions established by NI 43-101. About the Tower Mountain Gold Property The 7,625-hectare, 100%-owned Tower Mountain Property is beside the Trans-Canada highway, 40-km west of Thunder Bay, Ontario (pop. 120,000). Gold mineralization occurs in variably brecciated and altered rocks surrounding the calc-alkalic Tower Mountain Intrusive Complex. Drilling to date has established an initial mineral resource parallel to the western contact of the intrusion. The remaining 75% of the contact demonstrates similar geology, alteration, and geophysical signatures and is untested by drilling. A second gold trend, identified in 2026, outcrops at surface and is continuously mineralized over a 100-metre width. This gold mineralization occurs within Timiskaming-type conglomerates that have been traced for over 5.0 kilometres along a southwest trend paralleling the Thunder Lake Fault. The Company believes both targets offer opportunities to materially increase the total resource through systematic drilling. About Thunder Gold Corp. Thunder Gold is advancing the Tower Mountain project in Thunder Bay, Ont. -- an emerging gold system with the scale, consistency and quality to support a long-life, open-pit operation. Results from the disciplined drill programs have consistently reinforced confidence in the continuity and predictability of the discovery while highlighting significant potential for expansion across multiple zones of the Tower Mountain intrusive complex. With industry-leading drilling costs, existing infrastructure and a skilled local work force, Tower Mountain represents a rare combination of size, scalability and cost-effective growth. At Thunder Gold, our vision is clear: to unlock a discovery that has the potential to become a transformational gold project, delivering long-term value for shareholders while contributing to the future of Canada's mining industry. For more information about the Company, please visit: www.thundergoldcorp.com. On behalf of the Board of Directors, Wes Hanson, P.Geo., President and CEO For further information, contact: Wes Hanson, CEO (647) 202-7686 [email protected] Bryan Baritot, Investor Relations [email protected] NEITHER THE TSXV NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSXV) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE. The information contained herein contains "forward-looking information" and "forward-looking statements" within the meaning of applicable securities legislation (collectively, "forward-looking statements"). Forward-looking statements relate to information that is based on assumptions of management, forecasts of future results, and estimates of amounts not yet determinable. All statements, other than statements of historical fact, are forward-looking statements and are based on predictions, expectations, beliefs, plans, projections, objectives and assumptions made as of the date of this news release, including without limitation: statements regarding the potential to increase, expand, or reclassify the 2026 Mineral Resource Estimate; the interpreted geological continuity, sub-vertical extent, and depth potential of the Bench Target and the broader alteration system hosting mineralization at Tower Mountain; the anticipated timing and results of ongoing and future drill programs; the Company's plans regarding further definition, expansion, and discovery drilling at Tower Mountain; and the Company's plans regarding exploring its mineral exploration properties generally, anticipated results of geophysical drilling programs, geological interpretations and potential mineral recovery. Any statement that involves discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions, future events or performance (often but not always using phrases such as "expects", or "does not expect", "is expected", "anticipates" or "does not anticipate", "plans", "budget", "scheduled", "forecasts", "estimates", "believes" or "intends" or variations of such words and phrases or stating that certain actions, events or results "may" or "could", "would", "might" or "will" be taken to occur or be achieved) are not statements of historical fact and may be forward-looking statements. Forward-looking statements are subject to a variety of risks and uncertainties which could cause actual events or results to differ from those reflected in the forward-looking statements, including, without limitation: risks related to failure to obtain adequate funding on a timely basis and on acceptable terms; risks related to the outcome of legal proceedings; political and regulatory risks associated with mining and exploration; risks related to the maintenance of stock exchange listings; risks related to environmental regulation and liability; the potential for delays in exploration or development activities or the completion of feasibility studies; the uncertainty of profitability; risks and uncertainties relating to the interpretation of drill results, the geology, grade and continuity of mineral deposits; risks related to the inherent uncertainty of production and cost estimates and the potential for unexpected costs and expenses; results of prefeasibility and feasibility studies, and the possibility that future exploration, development or mining results will not be consistent with the Company's expectations; risks related to the gold price and other commodity price fluctuations; and other risks and uncertainties related to the Company's prospects, properties and business detailed elsewhere in the Company's disclosure record. Should one or more of these risks and uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking statements. Investors are cautioned against attributing undue certainty or reliance on forward-looking statements. These forward-looking statements are made as of the date hereof and the Company does not assume any obligation to update or revise any forward-looking statements, other than as required by applicable law, to reflect new information, events or circumstances, or changes in management's estimates, projections or opinions. Actual events or results could differ materially from those anticipated in the forward-looking statements or from the Company's expectations or projections. To view the source version of this press release, please visit https://www.newsfilecorp.com/release/309121
View at source ↗