Drill Results
Mink Ventures Completes Drilling at Warren Project; Moves Drill to Montcalm Ni Cu Co Project

MINK · Price
Executive Summary
- Mink Ventures completed eight diamond drill holes (total 346 m) at the Warren Ni‑Cu‑Co Project, intersecting significant sulphide mineralisation.
- The winter drilling program is now moving to the adjacent Montcalm Property to test a deep‑seated 3‑D Borehole Induced Polarization target located ~500 m below surface.
- No assay results are available yet; they will be released when received.
Key Details
- Drill Program – Warren Project: 8 holes, 346 m total depth logged, split and assayed (results pending). Targets were priority nickel‑copper zones in the A Zone and D Zone.
- Significant Intercepts: The release states “significant sulphide mineralisation” was intersected in a number of holes (specific grades not yet disclosed).
- Transition to Montcalm Property: Winter program will continue on the 100 km² Montcalm Property, ~30 km NW of Warren.
- Montcalm Target: Deep‑seated high‑priority 3‑D Borehole Induced Polarization (BIP) target with coincident airborne VTEM, gravity and magnetic anomalies; target depth ≈ 500 m below surface. Planned drill angle –88° to a depth of ~600 m.
- Historical Context: Montcalm adjacent to Glencore’s former mine, which historically produced 3.93 M t at 1.25 % Ni, 0.67 % Cu and 0.051 % Co.
- Qualified Person: Kevin Filo, P.Geo., Ontario (also a director), approved the technical information per NI 43‑101.
- Forward‑Looking Statements: Includes typical cautionary language regarding exploration risks, funding requirements, regulatory approvals, etc.
Notable Quotes
(No direct quotes were provided in the release.)
More from Mink Ventures Corporation
Jul 15, 2026 · 08:30