Northwire Canada EditionFriday, July 10, 2026
Northwire
TLO 5.37 +5.7% BNKR 4.88 +1.7% GG 2.25 +3.2% MJS 0.100 +5.3% PAAS 62.54 +3.6% PE 0.230 +0.0% SGML 17.19 +4.8% LAR 10.34 −1.1% NED 0.025 +0.0% GEN 0.080 +0.0% TVI 0.060 +0.0% SKYG 0.025 −37.5% WRLG 0.660 +6.5% FFU 0.120 −7.7% LOD 0.310 +3.3% CBI 0.110 +0.0% TLO 5.37 +5.7% BNKR 4.88 +1.7% GG 2.25 +3.2% MJS 0.100 +5.3% PAAS 62.54 +3.6% PE 0.230 +0.0% SGML 17.19 +4.8% LAR 10.34 −1.1% NED 0.025 +0.0% GEN 0.080 +0.0% TVI 0.060 +0.0% SKYG 0.025 −37.5% WRLG 0.660 +6.5% FFU 0.120 −7.7% LOD 0.310 +3.3% CBI 0.110 +0.0%
Drill Results Routine +

Kalo Gold Defines Kilometre-Scale Epithermal Gold Targets and Structural Corridors at Wainikoro Within a 40 km Gold Corridor, Vatu Aurum, Fiji

Kalo Gold Expands District-Scale Epithermal Footprint at Wainikoro While Stock Tests Critical Support

Executive Summary
  • Date: 2026-04-22
  • Headline: Defines Kilometre-Scale Epithermal Gold Targets and Structural Corridors at Wainikoro Within a 40 km Gold Corridor, Vatu Aurum, Fiji.
  • Drilling Results: Completed two diamond drill holes (VA26-DH18 and VA26-DH19) at the Wainikoro prospect.
    • Hole VA26-DH19 intersected brecciated andesitic volcanics with quartz veining, sulphide mineralization, and interpreted bladed carbonate textures indicating a boiling-stage epithermal system.
    • Hole VA26-DH18 intersected polymictic breccias, quartz-carbonate veining, and sulphide mineralization.
  • Geochemistry: Identified kilometre-scale arsenic-in-soil anomalies spatially associated with Nubu Graben structures (Kope Road North >1 km anomaly).
  • Trenching: TR13-5K04 returned up to 2 m at 3.41 g/t Au; TR17-5K05 returned 32 m at 0.56 g/t Au.
  • Future Work: High-resolution airborne magnetic and radiometric survey commencing immediately (helicopter in camp). Expansion of soil geochemistry, stream sediment sampling, and trenching. Integration of LiDAR data to refine drill targeting.
  • Management Commentary: CEO Terry Tucker states Wainikoro is behaving like a large epithermal system at this stage; pending Fire Assay results will define next drill locations.
Material Impact
  • News Rating: Routine - Positive. While the geological confirmation of a boiling zone and kilometre-scale anomalies supports the district model, it lacks immediate high-grade assay intercepts comparable to the October 2025 bonanza (12.80 g/t Au). The news is incremental progress rather than a valuation inflection point without confirmed grades in the new holes.
  • Context: This follows the April 8, 2026 update which confirmed vertically continuous gold systems at Qiriyaga Complex (3.25 g/t Au). Wainikoro represents an expansion of the known corridor rather than a new discovery of economic grade.
  • Market Expectation: The market has priced in exploration progress following the $12.45M financing closed in January 2026. This news validates the use of proceeds for drilling but does not materially alter the risk profile or resource potential immediately.
  • Price Impact: Likely to stabilize the stock near current lows ($0.20) rather than trigger a breakout, as the "game changer" narrative was established in October 2025 and April 8, 2026.
KALO · Price
Company Overview
  • Company: Kalo Gold Corp. (TSXV: KALO).
  • Flagship Project: Vatu Aurum Project, Fiji.
    • Location: Vanua Levu (North Island), Republic of Fiji.
    • Tenure: 100% owned Special Prospecting Licences covering ~367 km².
    • Geology: Low-sulphidation epithermal gold system within the >28 km Nubu Graben corridor.
    • Status: Advanced exploration (drilling, geophysics, trenching). No resource estimate yet.
  • Key Targets: Aurum Prime (Qiriyaga Complex), Wainikoro, Namalau Trend, Loma Trend, Buca Trend.
Read the original news release →

More from Kalo Gold Corp.