Northwire Canada EditionMonday, July 13, 2026
Northwire
GLDN 0.055 +0.0% BRON 0.040 +0.0% BTO 5.43 −0.7% ESK 0.365 −2.7% AUMN 0.275 +0.0% GGX 0.040 +0.0% S 0.155 +29.2% NNX 0.035 +0.0% ABX 51.90 −0.6% TTS 2.40 −4.0% FCI 0.400 −9.1% GR 0.075 +0.0% AII 23.38 +12.4% TUNG 1.72 +1.8% LGO 1.01 −2.9% EMM 0.080 +0.0% GLDN 0.055 +0.0% BRON 0.040 +0.0% BTO 5.43 −0.7% ESK 0.365 −2.7% AUMN 0.275 +0.0% GGX 0.040 +0.0% S 0.155 +29.2% NNX 0.035 +0.0% ABX 51.90 −0.6% TTS 2.40 −4.0% FCI 0.400 −9.1% GR 0.075 +0.0% AII 23.38 +12.4% TUNG 1.72 +1.8% LGO 1.01 −2.9% EMM 0.080 +0.0%
Drill Results Routine +

Errington Metals Begins Trading on TSX Venture Exchange, Launches Major Exploration Program in the Sudbury Basin

Errington Metals Commences TSXV Listing with 45,000m Drilling Plan

Executive Summary
  • Errington Metals Corp. (TSXV: EM) commenced trading on the TSX Venture Exchange on April 22, 2026.
  • The company launched a major exploration program featuring over 45,000 metres of diamond drilling through 2026.
  • Exploration focus is on Errington, Vermilion, and Balfour mineralized centres within the Sudbury Basin.
  • Targets include Volcanogenic Massive Sulphide (VMS) mineralization containing Copper, Zinc, Gold, and Silver.
  • An initial mineral resource estimate is planned for the second half of 2026.
  • Historical Mineral Resource Estimate data from Glencore (December 31, 2024) was disclosed:
    • Errington Deposit: 8.9 Mt total (Measured & Indicated).
    • Vermilion Deposit: 3.2 Mt total (Measured & Indicated).
  • Phase one of the metallurgical test program is complete; ongoing studies focus on precious metal recovery optimization.
Material Impact
  • The announcement formalizes the company's public listing status, which typically improves liquidity and analyst coverage potential compared to private or OTC trading.
  • However, the disclosed resource data is dated December 31, 2024, making it approximately 16 months old relative to the news date of April 2026; this limits the "newness" of the fundamental asset information.
  • The drilling program commitment (+45,000m) represents a significant capital allocation but does not guarantee immediate resource expansion without new assay results.
  • Given the price history provided prior to this news date (April 2025–April 2026), market participants likely anticipated the project's progression, reducing the surprise factor of the announcement.
  • The metallurgical progress is incremental rather than transformative at this stage.
EM · Price
Company Overview
  • Company: Errington Metals Corp., listed on TSX Venture Exchange (TSXV: EM).
  • Flagship Project: Sudbury Basin, Ontario, Canada.
  • Project Centres: Errington, Vermilion, and Balfour mineralized centres.
  • Mineralization Type: Volcanogenic Massive Sulphide (VMS) containing Copper (Cu), Zinc (Zn), Gold (Au), and Silver (Ag).
  • Development Stage: Exploration/Pre-feasibility; drilling campaign underway with resource estimate planned for H2 2026.
Read the original news release →

More from Errington Metals Corp.