Drill Results
Trident Intersects 4.61 g/t Au over 38.48m from 77.00m, including 5.48 g/t over 26.14m from Hole 26028 - 200m ENE of 2025 Drilling. Hole 26025 intersects 11.97 g/t over 10.70m from 324.20m at Contact Lake, Expands Winter Drill Program
Trident Resources Corp.

Executive Summary
- Drill Results: Trident Resources announced high-grade gold assay results from the first nine diamond drill holes of its 2026 winter drill program at the Contact Lake Gold Project. Hole CL26028 returned 4.61 g/t Au over 38.48m, including 5.48 g/t over 26.14m and a high-grade interval of 33.16 g/t over 1.89m. Hole CL26025 intersected 11.97 g/t Au over 10.70m at the Contact Lake zone.
- Program Expansion: The company is expanding its current winter drilling phase from a planned 10,000m to approximately 13,000m based on positive results.
- Financial Position: Trident maintains a strong balance sheet with over $30 million in cash and marketable securities. It plans to execute a total of 30,000 to 40,000 metres of drilling in 2026 across the La Ronge Gold Belt.
- Project Context: The Contact Lake project is located in the La Ronge Gold Belt and includes the past-producing mine which produced ~190,000 oz of gold between 1994 and 1998.
Material Impact
- Validation of Thesis: The assay results (e.g., 11.97 g/t over 10.70m) validate the high-grade potential established in November 2025 when the company first intersected significant mineralization after a 30-year hiatus. This is not a new discovery but a confirmation of continuity, which reduces exploration risk.
- Operational Execution: The expansion of the winter program from 10,000m to 13,000m demonstrates management confidence in the project's potential and utilizes existing capital efficiently without requiring immediate additional financing.
- Market Context: Despite positive news flow (financing in Feb, MRE upgrade in Nov), the stock price has declined from a high of $3.55 in late February to lows near $2.17 in March before recovering slightly to $2.78. This news serves as a fundamental anchor to support the current price level but does not fundamentally alter the valuation model compared to the November "Game Changer" event.
- Capital Efficiency: With over $30 million cash and a planned 30,000-40,000m program, the company is well-funded for the year, reducing near-term dilution risk relative to peers with weaker balance sheets.
ROCK · Price
Company Overview
- Company: Trident Resources Corp. (TSX-V: ROCK).
- Strategy: Consolidated explorer focusing on high-grade gold and copper assets in Saskatchewan's La Ronge Gold Belt.
- Flagship Project: Contact Lake Gold Project. A past producer (~190,000 oz Au) with active exploration underway. The project is located near infrastructure (highway, power) which reduces development costs.
- Other Assets: Preview SW, Preview North, North Lake, Greywacke Lake, Reindeer, and Knife Lake Copper projects.
- Management: Led by CEO Jonathan Wiesblatt with a team experienced in the La Ronge Belt.
More from Trident Resources Corp.
Jul 14, 2026 · 16:30