Northwire Canada EditionTuesday, August 4, 2026
Northwire
TIGR 0.645 +0.0% DML 3.95 +0.0% COSA 0.530 +0.0% PUMA 0.105 +0.0% GPAC 0.280 +0.0% LAF 1.60 +0.0% GRL 0.255 +0.0% RDG 0.170 +0.0% RVG 0.660 +0.0% TLO 5.03 +0.0% RAMP 0.275 +0.0% NOB 0.065 +0.0% COS 0.060 +0.0% LIB 0.800 +0.0% NTH 0.160 +0.0% GSVR 0.435 +0.0% TIGR 0.645 +0.0% DML 3.95 +0.0% COSA 0.530 +0.0% PUMA 0.105 +0.0% GPAC 0.280 +0.0% LAF 1.60 +0.0% GRL 0.255 +0.0% RDG 0.170 +0.0% RVG 0.660 +0.0% TLO 5.03 +0.0% RAMP 0.275 +0.0% NOB 0.065 +0.0% COS 0.060 +0.0% LIB 0.800 +0.0% NTH 0.160 +0.0% GSVR 0.435 +0.0%
Drill Results Routine −

Eastport Critical Metals Intersects over 120m of Copper Mineralisation in Step-Out Diamond Drilling at NAK-East, Extending the NAK Strike Length by 5km

Eastport Critical reports 122.4m of 0.11% copper at the NAK-East deposit, extending the mineralised zone by five kilometres.

Executive Summary

Eastport Critical Metals Corp. (EVI) reported Phase 1 step-out diamond drill results from the Matsitama Copper Project in Botswana, covering five holes across the NAK-East and NAK-West zones.

Key intercepts from NAK-East, reported as core lengths with no true width stated, include: - NEDD25-001: 18.1m @ 0.135% Cu, and 30.9m @ 0.104% Cu. - NEDD25-002: 97.4m @ 0.119% Cu, including 27.0m @ 0.227% Cu and sub-including 10.8m @ 0.354% Cu. - NEDD26-003: 122.4m @ 0.112% Cu, including 35.0m @ 0.212% Cu and sub-including 12.0m @ 0.350% Cu.

The NAK-West zone returned narrower intercepts, such as 10.7m @ 0.153% Cu and 5.5m @ 0.243% Cu. The company stated the results suggest a potential mineralized strike length of up to 10km linking the NAK-Main, East, and West areas.

Material Impact

Eastport Critical Metals Corp. (EVI) released drill results from its NAK project, including step-out holes at NAK-East and NAK-West, as well as infill drilling at NAK-Main. The step-out holes demonstrated that sub-economic copper mineralization extends 5km away from the main deposit, but provided no evidence of mineable grades in those areas. In contrast, the July infill results at NAK-Main confirmed higher-grade material within the historic resource envelope.

For a junior explorer, a large low-grade halo can be viewed negatively if it suggests the higher-grade core is limited. The market likely expected step-out holes to encounter grades similar to those at NAK-Main, making these results potentially disappointing.

No price data is currently available to gauge market reaction. From a fundamental standpoint, these results are not material enough to support a resource or a maiden estimate. The company’s cash position of $2.5 million as of April 30 and a going concern flag highlight the need for value-accretive news, which this release does not provide.

EVI · Price
Company Overview

Eastport Critical Metals Corp. is a Canadian junior explorer focused on critical metals in Botswana. Its flagship Matsitama Copper Project covers approximately 1,845km² and hosts the NAK deposit, which contains a historical (non-43-101) resource of 9.9Mt at 0.46% Cu based on a 0.3% cut-off. Other assets include the Semarule REE Project, the Foley Uranium Project adjacent to Lotus Resources’ Letlhakane, the Selebi East Ni-Cu-PGE project, and the Keng project.

The company went public in November 2025 via a Qualifying Transaction, raising approximately $7.9M, and immediately launched three concurrent drill programs. It maintains a multi-commodity pitch but has limited cash and a going concern warning.

Read the original news release →

More from Eastport Critical Metals Corp.