Goliath Reports 14.61 g/t AuEq Over 6.00 Meters And 11.88 g/t AuEq Over 4 Meters Within Surebet Zone's High-Grade Core Further Demonstrating Its Continuity And Predictability, Golddigger Property, Golden Triangle, B.C.
Goliath’s infill drilling confirms a high-grade core at the project, underscoring the importance of the upcoming resource estimate over headline results.

Goliath Resources Limited (GOT) reported additional 2026 assay results from the Surebet discovery at its 100%-owned Golddigger property in the Golden Triangle, B.C. The company described these results as coming from multiple infill holes intended to support a future maiden resource and preliminary economic assessment.
Key reported intercepts, as core lengths, include:
- GD-26-498, Surebet: 303.00-309.00 m, 6.00 m @ 14.61 g/t AuEq; including 303.00-307.00 m, 4.00 m @ 21.68 g/t AuEq; including 305.00-307.00 m, 2.00 m @ 42.31 g/t AuEq.
- GD-26-490, Surebet: 307.00-311.00 m, 4.00 m @ 11.88 g/t AuEq; including 307.96-309.00 m, 1.04 m @ 43.93 g/t AuEq.
- GD-26-465, Surebet: 267.00-287.00 m, 20.00 m @ 2.01 g/t AuEq; including 278.40-287.00 m, 8.60 m @ 4.19 g/t AuEq; including 279.54-284.92 m, 5.38 m @ 6.05 g/t AuEq.
- GD-26-455, Surebet Upper: 255.69-272.14 m, 16.45 m @ 2.38 g/t AuEq; including 255.69-262.06 m, 6.37 m @ 5.98 g/t AuEq; including 256.70-257.45 m, 0.75 m @ 45.15 g/t AuEq. A lower interval returned 307.15-310.44 m, 3.29 m @ 4.17 g/t AuEq.
- GD-26-442, Surebet: 275.70-289.35 m, 13.65 m @ 2.15 g/t AuEq; including 282.00-286.35 m, 4.35 m @ 4.49 g/t AuEq; including 284.85-286.35 m, 1.50 m @ 11.82 g/t AuEq.
- GD-26-486, Surebet: 278.08-283.15 m, 5.07 m @ 5.13 g/t AuEq.
- GD-26-459, Surebet: 302.00-306.00 m, 4.00 m @ 5.92 g/t AuEq; Whopper: 18.00-23.00 m, 5.00 m @ 4.34 g/t AuEq.
- GD-26-480, Eldorado: 298.94-307.00 m, 8.06 m @ 2.54 g/t AuEq.
- GD-26-460, Surebet: 347.00-361.00 m, 14.00 m @ 1.33 g/t AuEq.
- GD-26-477, Surebet: 271.00-275.00 m, 4.00 m @ 3.96 g/t AuEq; including 1.00 m @ 14.34 g/t AuEq with 532.00 g/t Ag.
The 2026 program is stated as 48,443 m in 97 holes with a 100% quartz-sulphide intersection rate, though assays remain pending for 43 holes. The release also repeated previously announced 2026 expansion metrics, citing a Surebet footprint of 2.01 km2, Bonanza of 1.51 km2, Golden Gate of 1.17 km2, and the new Big Bulk Zone.
Goliath Resources Limited (GOT) is a pre-resource explorer with no revenue, funded by equity and flow-through shares. The company’s latest release serves as an infill and confirmation update within the already defined 2.01 km2 Surebet system. While the footprint expansion and Big Bulk Zone were previously announced, this release adds assay continuity in known zones without introducing a new zone with assays, a new intrusive centre, or a step-change in scale. The value of the update lies in de-risking the continuity of the high-grade core ahead of a maiden resource and PEA.
The stock is near its 52-week low and has fallen materially from the January 2026 high, meaning the market is not priced for perfection. A solid infill result can support sentiment, with an expected modest positive share-price impact, likely low single-digit.
Goliath Resources Limited (TSX-V: GOT) is a precious-metals explorer listed on the TSX-V, focused on operations within the Golden Triangle of British Columbia. The company’s flagship asset is the 100%-owned Golddigger property, which spans 91,518 hectares and controls 56 km of the Red Line trend.
The Surebet discovery features a 2.01 km² footprint comprising five main modelled zones, gold-rich dykes, and 46 stacked gold-rich veins. Historical exploration at the site includes over 200,000 m drilled and more than 1,500 pierce points. Infrastructure in the district includes tidewater access via a barge route to Prince Rupert, a nearby permitted mill site at Kitsault, and existing road and power access.
Financially, the company reported a net loss of C$31.48 million and exploration expenditure of C$36.39 million for the fiscal year ended 2026. As of June 30, 2026, Goliath held C$42.98 million in cash, C$37.84 million in working capital, and no debt. The company has 177,889,945 shares outstanding, resulting in a market capitalization of approximately C$208 million at a share price of C$1.17.
According to the MD&A, Goliath has a flow-through commitment to spend C$24.09 million by December 31, 2026. The company has stated that it will need additional equity financing for working capital and exploration beyond its current cash position.