Drill Results
Monument Announces First 16 Drill Hole Results Of Selinsing Mine Expansion Drilling Program

MMY · Price
Executive Summary
- Monument Mining released assay results for the first 16 of 27 completed drill holes in its Buffalo Reef/Felda and Selinsing mine‑expansion programs.
- High‑grade gold intercepts were reported, including up to 6.33 g/t Au over 5 m (MBRDD601) and 4.79 g/t Au over 7 m (MBRDD601).
- The company budgeted US$2.5 million to finish the expansion drilling by June 2026, with final assay results expected by that date, potentially supporting a larger open‑pit design and extended mine life.
Key Details
- Drill Program Scope – 118 holes total (109 at Buffalo Reef/Felda, 9 at Selinsing) for 17,477 m of drilling. Stage 1: 73 holes (10,365 m); Stage 2: 36 holes (5,012 m).
- Completed to Date – 27 holes (2,952 m) finished; assay results received for 16 holes, 11 pending.
- Significant Assay Intercepts (Buffalo Reef/Felda)
- MBRRC579: 22 m @ 0.86 g/t Au from 2 m (incl. 1 m @ 1.41 g/t Au) and 6 m @ 1.9 g/t Au from 8 m.
- MBRRCDD01: 5 m @ 2.01 g/t Au & 0.47% Sb from 149 m; 1 m @ 1.14 g/t Au & 0.20% Sb from 160 m.
- MBRDD600: 4 m @ 3.42 g/t Au & 0.49% Sb from 55 m.
- MBRDD601: 7 m @ 4.79 g/t Au & 0.61% Sb from 43 m (includes 5 m @ 6.33 g/t Au & 0.79% Sb from 45 m).
- MBRDD602: 3 m @ 1.82 g/t Au & 0.61% Sb from 22 m; 8 m @ 2.17 g/t Au & 0.30% Sb from 26 m.
- MBRDD611: 3 m @ 4.66 g/t Au & 1.28% Sb from 6.9 m.
- Selinsing Program – Planned 9 holes (2,100 m) split into Stage 1 (3 holes, 480 m) and Stage 2 (6 holes, 1,620 m). Focus on depth and strike extensions of known gold structures.
- Budget & Timeline – US$2.5 million allocated; drilling to be completed by March 2026, final assay results by June 2026; resource update targeted for October 2026.
- Operational Updates – Two additional diamond rigs added in November 2025 (total 4 rigs). Half‑core sampling with PQ/HQ diamonds; QA/QC includes CRM every ~15 m and blanks every ~10 m. Samples shipped weekly to SGS Malaysia for fire assay, ICP, and carbon/sulphur analysis.
- Forward Outlook – Positive intercepts may enable pit expansion at Buffalo Reef/Felda and inform future LOM planning; resource model refinement ongoing.
Notable Quotes
“We are encouraged by the first 16 drill hole assay results… with the objective of increasing gold resources and potentially extending the life of mine at Selinsing Gold Mine.” – Cathy Zhai, President & CEO
More from Monument Mining Limited
Jun 01, 2026 · 17:45