Northwire Canada EditionTuesday, July 14, 2026
Northwire
TLO 6.01 +13.2% ADE 0.050 −63.0% FAIR 0.055 +22.2% SVRS 0.420 −2.3% RES 0.035 +0.0% CYG 0.120 +0.0% MGG 0.310 −6.1% BUFF 0.770 +2.7% TKO 11.14 +11.8% MINK 0.100 −4.8% LCE 0.240 −4.0% AEF 0.165 +3.1% BEM 0.095 +5.6% APMI 0.120 +0.0% LIO 0.135 +3.9% TLO 6.01 +13.2% ADE 0.050 −63.0% FAIR 0.055 +22.2% SVRS 0.420 −2.3% RES 0.035 +0.0% CYG 0.120 +0.0% MGG 0.310 −6.1% BUFF 0.770 +2.7% TKO 11.14 +11.8% MINK 0.100 −4.8% LCE 0.240 −4.0% AEF 0.165 +3.1% BEM 0.095 +5.6% APMI 0.120 +0.0% LIO 0.135 +3.9%
Drill Results Routine +

Monument's Drill Assay Results Highlight Selinsing Gold Mine Expansion Potential

Monument Mining Drill Results Validate Selinsing Expansion Potential Amidst Gold Price Correction

Executive Summary
  • Monument Mining Limited announced completion of Stage 1 and Stage 2 drilling for the Buffalo Reef/Felda Mine Expansion program at its Selinsing Gold Mine in Malaysia.
  • Total drilling completed is 123 holes for 17,136 meters against a plan of 118 holes/17,477m.
  • Assay results received for 98 holes with 19 pending; all expected by June 2026.
  • Results indicate strong potential for resource addition outside current Life of Mine (LOM) and Expanded Pit Shell boundaries.
  • Significant high-grade intercepts reported, including MBRDD641: 21.0m @ 1.99g/t Au and MBRDD628: 1.1m @ 13.9g/t Au.
  • Geological continuity suggests an increased Inferred Mineral Resource outside existing tenement boundaries.
Material Impact
  • The news confirms the successful completion of a previously announced $2.5 million drilling program initiated in July 2025, making it expected rather than unexpected information.
  • While high-grade intercepts are positive, they represent exploration potential (Inferred Resource) rather than converted reserves or immediate production changes.
  • The announcement validates previous Q2 FY26 earnings guidance which already factored in strong cash flow and production growth.
  • Given the program was known to the market for months, this is a follow-up milestone rather than a game-changing event like an acquisition or final resource declaration.
  • The "outside LOM" potential is significant but requires further technical work (resource update targeted October 2026) before materializing into financial value.
MMY · Price
Company Overview
  • Flagship Project: Selinsing Gold Mine in Malaysia (Central Gold Belt), an open-pit sulphide operation with a 950 ktpa flotation plant.
  • Status: Producing since September 2010; historical production of 436,787 oz Au to date.
  • Secondary Assets: Murchison Gold Portfolio in Western Australia (Burnakura and Gabanintha projects) currently in exploration/development stages.
  • Strategy: Disciplined growth combining sustaining Selinsing production with expansion drilling and potential corporate acquisitions.
  • Operations: Recent upgrades include new filter press, concentrate shed extension, and tailings storage facility (TSF) stage 7 design.
Read the original news release →

More from Monument Mining Limited