Northwire Canada EditionSunday, September 13, 2026
Northwire
GOLD 4408.90 +0.0% SILVER 65.19 +0.4% COPPER 6.55 +0.0% OIL 100.05 −2.4% PALLADIUM 1323.90 +2.3% PGZ 0.170 +3.0% TMQ 4.55 −1.3% SLI 3.08 −1.0% ROX 0.050 −9.1% USHA 0.045 +0.0% ALGR 0.710 +2.9% MINE 0.120 −4.0% KC 0.330 +4.8% EMO 0.335 +0.0% CCM 0.700 +4.5% MAI 5.97 −0.7% PPM 0.015 +0.0% CRE 0.370 +10.4% MNO 1.87 +0.5% FEO 0.810 +3.9% LBNK 0.680 −4.2% GOLD 4408.90 +0.0% SILVER 65.19 +0.4% COPPER 6.55 +0.0% OIL 100.05 −2.4% PALLADIUM 1323.90 +2.3% PGZ 0.170 +3.0% TMQ 4.55 −1.3% SLI 3.08 −1.0% ROX 0.050 −9.1% USHA 0.045 +0.0% ALGR 0.710 +2.9% MINE 0.120 −4.0% KC 0.330 +4.8% EMO 0.335 +0.0% CCM 0.700 +4.5% MAI 5.97 −0.7% PPM 0.015 +0.0% CRE 0.370 +10.4% MNO 1.87 +0.5% FEO 0.810 +3.9% LBNK 0.680 −4.2%
Drill Results Routine +

Talisker Reports Mustang Underground Face Sample Results Defining a 79-metre Strike Length High-grade Shoot Averaging 64.8 g/t on the 1030 Level

Talisker reports 64.8 g/t over 0.50m in the 1030 BK vein, confirming strong grade control rather than a new discovery.

Executive Summary

Talisker Resources Ltd. (TSK) reported underground face chip-sample results from the 1030 Level lateral development at the Mustang Mine, BK Vein, Bralorne Gold Project. The release defines a continuous 79-metre strike length averaging 64.84 g/t Au over an average true width of 0.50 metres.

Highlight intervals include: - 496 g/t over 0.51m within 156.97 g/t over 1.64m - 203 g/t over 0.54m within 100.81 g/t over 1.09m - 167 g/t over 0.48m within 61.27 g/t over 1.31m - 147 g/t over 0.35m within 51.16 g/t over 1.21m

The company states this extends the 1045 Level high-grade shoot to the 1030 Level, about 15 metres below, with higher grade and improved continuity at depth.

Material Impact

Talisker Resources Ltd. (TSK) is a producing and ramp-up junior, meaning near-mine face samples serve as grade-control information rather than discovery news. The recent results validate the BK Vein and may support stope planning and short-term production, but they do not alter the reported resource of 206,300 oz Measured and Indicated at 8.91 g/t Au and 3.15M oz Inferred at 8.73 g/t Au.

The market already anticipated high-grade results from Bralorne following the April and July 1045 face-sample releases, with the July release specifically flagging pending 1030 assays. While the 1030 result is better on gram-metres than those anchors, it is not a new discovery or a scale-changing event.

Financially, the company remains in commissioning with H1 2026 revenue of C$16.4M, a net loss of C$4.95M, cash of C$49.7M, and an explicit going-concern warning. This release does not resolve those structural risks.

TSK · Price
Company Overview

Talisker Resources Ltd. (TSK) is a British Columbia-based gold junior transitioning to production, anchored by its 100%-owned Bralorne Gold Project. This flagship asset comprises a 24,000-hectare land package situated along the Cadwallader fault system, featuring approximately 40 km of district strike.

The company’s Mustang Mine is currently in production, with planned expansions including the Olympus and Congress projects. Talisker envisions becoming a multi-mine gold producer exceeding 200,000 oz per year.

The Bralorne project holds a 2026 mineral resource estimate of 206,300 oz Measured and Indicated at 8.91 g/t Au and 3,151,900 oz Inferred at 8.73 g/t Au, with no defined mineral reserves. Other assets in the portfolio include the Ladner Gold Project and the Spences Bridge Project.

Read the original news release →

More from Talisker Resources Ltd.