Northwire Canada EditionWednesday, July 15, 2026
Northwire
EFF 0.030 +20.0% W 0.500 +1.0% RDG 0.160 +0.0% ARIC 0.780 +4.0% VROY 3.44 +5.2% ROCK 3.81 +3.0% APMI 0.120 +0.0% EM 3.58 −4.8% ALS 66.04 +6.8% MEK 0.065 +44.4% TLO 6.00 +13.0% ADE 0.045 −66.7% FAIR 0.060 +33.3% SVRS 0.420 −2.3% RES 0.050 +42.9% CYG 0.120 +0.0% EFF 0.030 +20.0% W 0.500 +1.0% RDG 0.160 +0.0% ARIC 0.780 +4.0% VROY 3.44 +5.2% ROCK 3.81 +3.0% APMI 0.120 +0.0% EM 3.58 −4.8% ALS 66.04 +6.8% MEK 0.065 +44.4% TLO 6.00 +13.0% ADE 0.045 −66.7% FAIR 0.060 +33.3% SVRS 0.420 −2.3% RES 0.050 +42.9% CYG 0.120 +0.0%
Resource Estimate

Orosur Mining Inc. Announces 43-101 Technical Report for its Anza Project

OMI · Price

Executive Summary

  • Oroset Mining Inc. filed a NI 43‑101 compliant technical report for its 100% owned Anza Project in Colombia, including the maiden Mineral Resource Estimate for the Pepas deposit.
  • The report is effective as of 16 January 2026 and was issued on 25 March 2026, supporting prior disclosures made on 10 February 2026.
  • Availability: the full technical report is posted on Orosur’s website and on SEDAR+.

Key Details

  • Technical Report: National Instrument 43‑101 Standards of Disclosure for Mineral Projects compliant.
  • Project Covered: Anza Project, Colombia – 100% owned by Orosur.
  • Deposit Highlighted: Pepas deposit – maiden Mineral Resource Estimate included.
  • Effective Date: 16 January 2026.
  • Issue Date: 25 March 2026.
  • Purpose: Supports disclosures previously announced on 10 February 2026 regarding the Anza Project’s resource potential.
  • Access: Report available at www.orosur.ca and via SEDAR+ (www.sedarplus.ca).
  • Contact Information:
  • Louis Castro, Chairman – [email protected]
  • Brad George, CEO – [email protected]

Notable Quotes

(No direct quotes were provided in the release.)

Read the original news release →

More from Orosur Mining Inc.