Northwire Canada EditionWednesday, November 11, 2026
Northwire
⌕
Gold 3,990.70 −1.0% Silver 51.72 +1.0% Copper 6.27 +0.5% Oil 86.37 +0.4% Palladium 1,033.50 +1.2% AUXX 5.31 −5.3% TNR 0.420 +40.0% ORCL 0.030 +0.0% ELD 47.68 −5.4% OPW 0.140 −6.7% CDE 21.41 −1.3% AEM 264.92 −2.1% WDO 27.75 −2.0% BEA 0.090 +0.0% GAU 3.42 −3.9% BTO 7.38 −2.2% IMG 25.75 −2.2% BOL 0.050 −16.7% CNT 0.030 +0.0% EXN 0.245 −1.0% MNRG 0.075 +0.0% Gold 3,990.70 −1.0% Silver 51.72 +1.0% Copper 6.27 +0.5% Oil 86.37 +0.4% Palladium 1,033.50 +1.2% AUXX 5.31 −5.3% TNR 0.420 +40.0% ORCL 0.030 +0.0% ELD 47.68 −5.4% OPW 0.140 −6.7% CDE 21.41 −1.3% AEM 264.92 −2.1% WDO 27.75 −2.0% BEA 0.090 +0.0% GAU 3.42 −3.9% BTO 7.38 −2.2% IMG 25.75 −2.2% BOL 0.050 −16.7% CNT 0.030 +0.0% EXN 0.245 −1.0% MNRG 0.075 +0.0%
Drill Results

Buffalo Potash Completes First Confirmation Hole at Disley Project and Confirms Potash in All Target Members; Assays to Follow

BUFF · Price

Executive Summary

  • Buffalo Potish successfully completed the 7‑10‑20‑23 W2M confirmation drillhole (the “7‑10 Hole”) to a total depth of 1,563 m, retrieving 108 m of core with >98% recovery.
  • Visual observation and borehole geophysical logs confirmed potash mineralization in all target members (Patience Lake, Belle Plaine, Esterhazy) and noted significant sylvinite intersections; assay results are pending.
  • The drillhole de‑risks Buffalo’s broader multi‑well development plan for the Disley Project and provides a keystone data set for an integrated geological‑geophysical deposit model.

Key Details

  • Drillhole Depth & Core Recovery – Total depth 1,563 m; continuous core interval of 108 m obtained in a single coring run with >98% core recovery.
  • Targeted Formations – Basal Dawson Bay, Patience Lake, Belle Plaine, Esterhazy Members of the Prairie Evaporite Formation and underlying Prairie salt were continuously cored.
  • Geophysical Logging – Full suite of borehole logs (including dipole sonic) run on the open portion of the hole to 1,563 m; logs indicate mineralization across all target members.
  • Mineralization Confirmation – Visual observation and log interpretation confirm potash presence in Patience Lake, Belle Plaine, and Esterhazy beds; significant sylvinite intersections noted in Upper Patience Lake, Belle Plaine, and Esterhazy (grades & thicknesses to be reported after assay).
  • Core Handling – Cores stored with the Saskatchewan Research Council Geoanalytical Laboratory; core logging, sampling, and assaying are forthcoming.
  • Strategic Impact – CEO Steve Halabura states the hole “de‑risked our broader multi‑well development plans” and will feed an integrated geological & geophysical model for the Disley Showcase.
  • Future Work – Assay program pending; additional 3D seismic acquisition to commence shortly, accelerating technical advancement of the project.
  • Project Context – Disley Project spans ~9,413 ha, located ~50 km NW of Regina adjacent to major solution‑mining operations (K+S Bethune and Mosaic Belle Plaine).

Notable Quotes

“The first confirmation hole delivered both operational execution and geological validation, which has de‑risked our broader multi‑well development plans.” – Steve Halabura, President & CEO

“Each dataset strengthens our understanding of the deposit and positions Disley as a compelling modular solution mining opportunity in the heart of the world’s most established potash district.” – Steve Halabura

Read the original news release →

More from Buffalo Potash Corporation