PAN GLOBAL COMMENCES 2026 DRILL PROGRAM AT ESCACENA PROJECT, SPAIN
Pan Global Ignites 2026 Drill Campaign as Strategic Cash Injection De-Risks Multi-Target Exploration in Spain

The most recent news (February 23, 2026) announces the commencement of the 2026 drilling program at the 100%-owned Escacena Project in Spain. The campaign begins at the El Pozo target, described as a high-confidence Volcanic Massive Sulphide (VMS) target with a 1.6 km soil copper anomaly. This follows a series of February 2026 updates outlining a total 10,000-meter program across both the Escacena and Cármenes projects. The program is fully funded following the January 2026 closing of a $5.6 million private placement with a strategic investor.
The news is Routine - Positive. While the commencement of drilling is a standard operational step, its materiality is elevated by the context of the historical news: - Strategic Validation: The recent $5.6M financing at $0.16 (above current market price) by a "highly respected strategic investor with mine operating experience" provides a significant valuation floor and technical endorsement. - Resource Foundation: The company recently delivered a maiden Mineral Resource Estimate (MRE) at Escacena (Dec 2025), establishing 32.4Mt at 0.37% Cu (Indicated). The 2026 program is specifically designed to expand this toward a 100Mt target. - High-Grade Potential: Recent results from Cármenes (Feb 2026) showed high-grade gold (8m at 3.5 g/t Au), suggesting the 2026 program has multiple "discovery" levers beyond just expanding the known copper resource.
Pan Global is focused on copper-tin-gold discoveries in Spain. Its flagship Escacena Project is located in the Iberian Pyrite Belt, adjacent to world-class operating mines like Riotinto (Atalaya) and Los Frailes (Grupo Mexico). The project hosts the La Romana (Cu-Sn-Ag) and Cañada Honda (Cu-Au) deposits. The company also holds the Cármenes Project in Northern Spain, which recently yielded a significant new gold discovery.