Northwire Canada EditionFriday, October 16, 2026
Northwire
⌕
GOLD 4170.10 +1.5% SILVER 57.16 +2.3% COPPER 6.56 −1.5% OIL 97.97 +3.0% PALLADIUM 1136.00 +3.6% LUN 32.91 +0.6% DLP 0.290 −3.3% VCV 0.065 −13.3% GG 2.89 +1.4% NBLC 0.015 +0.0% SF 0.300 −4.8% ATY 0.215 +2.4% GHL 0.060 −7.7% STND 0.060 −7.7% B 0.550 −3.5% HBM 34.33 −0.5% NTR 98.77 −0.7% SGZ 0.035 +0.0% MKA 0.670 +0.0% LXM 0.175 −18.6% CLCH 1.08 −1.8% GOLD 4170.10 +1.5% SILVER 57.16 +2.3% COPPER 6.56 −1.5% OIL 97.97 +3.0% PALLADIUM 1136.00 +3.6% LUN 32.91 +0.6% DLP 0.290 −3.3% VCV 0.065 −13.3% GG 2.89 +1.4% NBLC 0.015 +0.0% SF 0.300 −4.8% ATY 0.215 +2.4% GHL 0.060 −7.7% STND 0.060 −7.7% B 0.550 −3.5% HBM 34.33 −0.5% NTR 98.77 −0.7% SGZ 0.035 +0.0% MKA 0.670 +0.0% LXM 0.175 −18.6% CLCH 1.08 −1.8%
Drill Results

Collective Metals Initiates Inaugural Drill Program at the Rocas Uranium Project in Southeast Athabasca Basin

COMT · Price

Executive Summary

  • Collective Metals announced that diamond drilling has commenced on the Rocas Uranium Project as of March 16, 2026, marking the first ever drill hole at the site.
  • The Phase I program will target shallow, high‑grade basement‑hosted uranium mineralization with 1,200–1,500 m of drilling across 6–8 holes over an anticipated five‑week period.
  • The campaign will test a 7.5‑km electromagnetic corridor and VTEM/gravity targets that have previously returned surface grab samples up to 0.50 wt% U₃O₈ and REE assays as high as 9.83 % TREO.

Key Details

  • Program Scope: Approximately 1,200–1,500 m of diamond drilling; 6–8 holes; ~5‑week duration beginning 16 Mar 2026.
  • Target Depths: Shallow targets <200 m below surface to intersect basement-hosted uranium mineralization.
  • Geophysical Targets: First-time testing of a 7.5‑km EM corridor on Rocas; additional VTEM corridors overlaid by high‑resolution ground gravity data.
  • Historical Surface Results: Grab samples along ~900 m strike length returned up to 587 ppm U (0.0587 wt% U) and 0.498 wt% U₃O₈; recent prospecting identified REE values up to 9.83 % TREO and U₃O₈ up to 0.41 %.
  • Project Size: 4,002 ha covering three mineral claims along Highway 914, ~75 km SW of the Key Lake Mine & Mill facilities.
  • Exploration Partner: Standard Uranium Ltd., with field crews on site and responsible for drilling operations.
  • Qualified Person Review: Sean Hillacre, P.Geo., President & VP Exploration, Standard Uranium (NI 43‑101 qualified person).
  • Laboratory Analysis: Samples processed at SRC Geoanalytical Laboratories (ISO/IEC 17025:2005 certified); assays include ICP‑MS/OES for multi‑element analysis and U₃O₈ determination.
  • CEO Comment: “With multiple high‑priority targets defined through geophysics, surface mineralization, and recent prospecting, we believe Rocas has the potential to host shallow, high‑grade uranium mineralization.” – Christopher Huggins, CEO.

Notable Quotes

“We look forward to testing these targets and advancing the Project in one of the world’s premier uranium districts.” – Christopher Huggins, Chief Executive Officer, Collective Metals Inc.

Read the original news release →

More from Collective Metals Inc.