Northwire Canada EditionSunday, July 12, 2026
Northwire
GLDN 0.055 +0.0% BRON 0.040 +0.0% BTO 5.43 −0.7% ESK 0.365 −2.7% AUMN 0.275 +0.0% GGX 0.040 +0.0% S 0.155 +29.2% NNX 0.035 +0.0% ABX 51.90 −0.6% TTS 2.40 −4.0% FCI 0.400 −9.1% GR 0.075 +0.0% AII 23.38 +12.4% TUNG 1.72 +1.8% LGO 1.01 −2.9% EMM 0.080 +0.0% GLDN 0.055 +0.0% BRON 0.040 +0.0% BTO 5.43 −0.7% ESK 0.365 −2.7% AUMN 0.275 +0.0% GGX 0.040 +0.0% S 0.155 +29.2% NNX 0.035 +0.0% ABX 51.90 −0.6% TTS 2.40 −4.0% FCI 0.400 −9.1% GR 0.075 +0.0% AII 23.38 +12.4% TUNG 1.72 +1.8% LGO 1.01 −2.9% EMM 0.080 +0.0%
Drill Results Routine +

Collective Metals Intersects Anomalous Radioactivity and Graphitic Reactivated Structure at Rocas Uranium Project; Initial Drill Program Complete

Collective Metals Drill Results Validate Rocas Geophysics Amidst Dilution Concerns

Executive Summary
  • Collective Metals Inc. completed its inaugural drill program at the Rocas Uranium Project on May 6, 2026.
  • The program consisted of 962 metres across four reconnaissance holes, falling short of the previously announced target range of 1,200–1,500 metres.
  • Intersections included anomalous radioactivity readings up to 650 counts per second (cps) in three of four holes.
  • Significant graphitic sequences and hydrothermal alteration (hematite, clay) were confirmed, validating the geophysical models used for target selection.
  • Total composite anomalous radioactivity across all holes is 1.5 meters.
  • Geochemical assays for U3O8 and Rare Earth Elements (REE) are pending from SRC Geoanalytical Laboratories.
  • Management plans a phase two drilling program to follow up on these results and test the remaining 5 km of untested EM corridor strike-length.
Material Impact
  • The news confirms execution of exploration activities but does not yet provide economic assay grades, limiting immediate upside potential.
  • The drill volume (962m) was approximately 30% below the initial guidance (1,200–1,500m), which may indicate budget constraints or operational challenges rather than a strategic shift.
  • Radioactivity readings of 650 cps are considered anomalous but low compared to surface grab samples reported earlier in March (up to 33,000 cps scintillometer and high-grade REE/U assays). This discrepancy introduces uncertainty regarding the continuity or grade of basement mineralization.
  • The completion of drilling is a necessary milestone for advancing the project, but without assay results confirming U3O8 grades, it remains an incremental step rather than a discovery announcement.
  • Given the stock price decline from $0.25 in February to $0.09 in May prior to this release, much of the exploration risk has already been priced in by the market.
COMT · Price
Company Overview
  • Company: Collective Metals Inc., focused on uranium exploration in the Athabasca Basin region of Saskatchewan.
  • Flagship Project: Rocas Uranium Project (4,002 ha), located ~75 km SW of Key Lake Mine & Mill facilities.
  • Project Status: In early exploration phase; inaugural drilling completed May 2026.
  • Geology: Targets shallow basement-hosted uranium mineralization along a 7.5-km magnetic low/EM conductive corridor with historic surface grab samples showing high-grade REE and Uranium.
  • Location: Eastern Athabasca Basin margin, offering minimal glacial till cover which facilitates drilling targets <200m depth.
Read the original news release →

More from Collective Metals Inc.