Drill Results
Awale Hits 24.8 g/t Gold over 5 Metres within 18.9 g/t Gold over 7 Metres at Charger
Awale Resources Drilling Continues at Charger as MRE Looms in Q2

Executive Summary
- Date: 2026-04-14
- Headline: Awale Hits 24.8 g/t Gold over 5 Metres within 18.9 g/t Gold over 7 Metres at Charger
- Event Type: Drilling Results / Operations Update
- Key Details:
- Confirms high-grade gold mineralization continuity to depths of 400m at the Charger target.
- Completed 17-hole resource drilling program for Charger; targeting initial Mineral Resource Estimate (MRE) in Q2 2026.
- Future plans include testing Charger system to vertical depth of at least 600m and evaluating strike extensions.
- Significant intercepts reported: CHDD-20 returned 18.9 g/t Au over 7m, including 24.8 g/t Au over 5m.
- Pending results include four exploration holes at Charger 2 and twelve holes from the Empire MRE drill program.
- CEO Andrew Chubb notes continuity of high-grade gold mineralization within the breccia and vein system.
Material Impact
- Rating Justification: The news is categorized as Routine - Positive because it confirms an established trend rather than introducing a fundamentally new catalyst. High-grade drilling results at Charger have been announced consistently since January 2026 (e.g., 52.8 g/t Au in Jan, 36.2 g/t Au in Mar).
- Market Expectations: The market has already priced in the high-grade narrative, evidenced by the stock price rising from ~$0.50 in April 2025 to a peak of $1.15 in February 2026.
- Price Action Context: Following the February highs, the stock has corrected and consolidated between $0.75 and $0.90 since March 2026. This news sustains the bullish thesis but does not provide a surprise catalyst sufficient to break out of the current consolidation range immediately.
- MRE Timeline: The primary value driver remains the Q2 2026 Mineral Resource Estimate. This drilling update supports the timeline but delays no expectations; it is an incremental step toward that milestone.
ARIC · Price
Company Overview
- Company: Awale Resources Ltd. (TSX-V: ARIC).
- Flagship Project: Odienné Project, Côte d'Ivoire.
- Key Targets:
- Charger: High-grade gold breccia system; currently the primary focus for resource definition.
- BBM: Gold-copper discovery with underground potential; step-down drilling extended mineralization to 570m depth in late 2025/early 2026.
- Empire: High-grade gold zone; initial MRE targeted for Q2 2026.
- Land Package: Approximately 2,346 km² across seven permits (five granted, two pending). Includes 100% owned permits (Sienso, Sama, Seydou) and Joint Venture areas.
More from Awale Resources Limited
Jul 14, 2026 · 17:01