Financings
Goliath investor McEwen boosts position to 2.6%

GOT · Price
Executive Summary
- Rob McEwen exercised all his warrants in Goliath Resources Ltd., generating $1,214,285 in proceeds and increasing his direct ownership to 4,445,142 shares (2.6% of total issued and outstanding shares).
- McEwen Inc. remains a cornerstone investor, holding 5,181,347 common shares and 2,590,673 warrants with a strike price of $2.50 expiring March 10, 2026; if exercised, McEwen Inc. would hold approximately 4.5% of the company.
- The company highlights the financial strength provided by these exercises and provides extensive operational updates regarding the Golddigger property, including metallurgy results, infrastructure access, and upcoming drilling plans.
Key Details
- Warrant Exercise: Rob McEwen exercised all warrants for total proceeds of $1,214,285.
- McEwen Ownership Post-Exercise: Direct ownership increased to 4,445,142 common shares, representing 2.6% of total issued and outstanding shares.
- McEwen Inc. Holdings: Holds 5,181,347 common shares plus 2,590,673 warrants.
- McEwen Inc. Warrant Terms: Strike price of $2.50, expiring March 10, 2026. Potential value if exercised is $6,476,683.
- McEwen Inc. Potential Ownership: If all warrants are exercised, McEwen Inc. would own 7,772,020 shares, representing approximately 4.5% of the company.
- Golddigger Property Location: 100% controlled, covering 91,518 hectares in the Eskay Rift, Golden Triangle, British Columbia, within 3 km of the Red Line.
- Metallurgy Results (Surebet Discovery): Gold recoveries from gravity and flotation at a 327-micrometre crush are 92.2%, including 48.8% free gold from gravity alone (no cyanide required). No deleterious elements present.
- Infrastructure and Access:
- Located near Alice Arm and Kitsault.
- Permitted mill site on private property.
- Direct barge access to Prince Rupert (190 km via Observatory/Portland inlet).
- Kitsault accessible by road (190 km from Terrace, 300 km from Prince Rupert) with barge landing, dock, and infrastructure for 300+ people including high-tension power.
- Dolly Varden silver mine road is 7 km east; Alice Arm barge landing is 18 km south; high-tension power is 25 km east.
- Drilling Status:
- Completed largest fully financed drill campaign to date in 2025: 64,364 metres.
- 70 holes with assays pending.
- Fully financed for another large drill program (40,000–50,000 metres) in 2026.
- Strategic Investors: Crescat Capital, McEwen Inc., Waratah Capital Advisors, Rob McEwen, Eric Sprott, and Larry Childress.
Notable Quotes
- "We want to thank the continued support of all our cornerstone strategic and long-term investors, specifically Rob McEwen for the exercise of his warrants. The funds received of $1,214,285 will further enhance and strengthen Goliath's already healthy financial position." — Roger Rosmus, Founder and CEO
More from Goliath Resources Limited
Aug 06, 2026 · 06:06