Northwire Canada EditionFriday, July 10, 2026
Northwire
TLO 5.37 +5.7% BNKR 4.88 +1.7% GG 2.25 +3.2% MJS 0.100 +5.3% PAAS 62.54 +3.6% PE 0.230 +0.0% SGML 17.19 +4.8% LAR 10.34 −1.1% NED 0.025 +0.0% GEN 0.080 +0.0% TVI 0.060 +0.0% SKYG 0.025 −37.5% WRLG 0.660 +6.5% FFU 0.120 −7.7% LOD 0.310 +3.3% CBI 0.110 +0.0% TLO 5.37 +5.7% BNKR 4.88 +1.7% GG 2.25 +3.2% MJS 0.100 +5.3% PAAS 62.54 +3.6% PE 0.230 +0.0% SGML 17.19 +4.8% LAR 10.34 −1.1% NED 0.025 +0.0% GEN 0.080 +0.0% TVI 0.060 +0.0% SKYG 0.025 −37.5% WRLG 0.660 +6.5% FFU 0.120 −7.7% LOD 0.310 +3.3% CBI 0.110 +0.0%
Drill Results

ARRAS MINERALS DRILLS 935.9M GRADING 0.71% CUEQ FROM SURFACE INCLUDING 214.9M GRADING 1.42% CUEQ STARTING AT 162.1M DEPTH FROM THE BEREZSKI NORTH PORPHYRY TARGET, ELEMES PROJECT IN KAZAKHSTAN

ARK · Price

Executive Summary

  • Arras Minerals reported significant drill results from the Berezski North Target at its Elemes Project in Kazakhstan, confirming a large, preserved porphyry system open in multiple directions and to depths exceeding 900m.
  • Hole EL26032 intersected 935.9m grading 0.71% CuEq from surface, including a high-grade 214.9m interval grading 1.42% CuEq starting at 162.1m depth, alongside 55m of high-grade breccia mineralization.
  • The drilling program has expanded the target's geophysical and geochemical footprint to 3km x 2km, extended the high-grade breccia strike length to over 600m, and prompted an expansion of the 2026 drill program from 20,000m to 30,000m.

Key Details

  • Hole EL26032: 935.9m grading 0.71% CuEq (0.51 g/t Au, 0.19% Cu) from surface, including 214.9m grading 1.42% CuEq (1.01 g/t Au, 0.41% Cu) starting at 162.1m depth. Terminated in mineralization.
  • High-Grade Breccia (EL26032): 4.41% CuEq (3.27 g/t Au, 1.22% Cu) over 55.0m from 216.0m depth.
  • Hole EL26033: 52m grading 1.75% CuEq (1.14 g/t Au, 0.64% Cu) from 259.0m depth, within a broader zone grading 181.0m at 0.66% CuEq (0.43 g/t Au, 0.24% Cu) from 170.0m depth.
  • Distal Mineralization (EL26033): Terminates in distal porphyry-style mineralization grading 0.15% CuEq (0.11 g/t Au, 0.04% Cu) over 127.2m from 503.0m depth.
  • Geological Context: Confirms a preserved, large, well-developed porphyry system open to depths >900m. Extended the strike length of high-grade breccias to >600m.
  • Broader Berezski Trend (8.8 km): Berezski East target recently announced 115.7m grading 1.44 g/t Au and 0.24% Cu. Berezski Central previously announced 261m grading 0.64% CuEq from surface. K-Ozek target features 2km strike of quartz veins with historic grab samples >5 g/t Au; recent drilling intersected quartz-sulphide veins and wide stockwork veining.
  • Drilling Program & Rigs: Four diamond drill rigs active on site. 8 holes completed at Berezski North since Q1 2026. 6 additional holes drilled with assays pending. Phase II program expanded from 20,000m to 30,000m in Jan 2026, targeting completion by end of 2026.
  • Geophysics & Geochemistry: IP survey identified a 2km x 2km chargeability high anomaly. Ground magnetic data shows a coincident 2km x 2km doughnut-shaped magnetic low. Soil sampling (35,000+ samples) and UBC MDRU MPIx index highlight two large zones with high porphyry proximity, expanding the target footprint to 3km x 2km.
  • Assay Parameters & Calculations: CuEq calculated using $3.75/lb Cu, $3,000/oz Au, $35/oz Ag, $30/lb Mo. Metallurgical recoveries: Cu 90%, Au 85%, Ag 75%, Mo 80%. All intervals reported as core lengths (true thickness unknown).
  • Project Infrastructure & Location: Elemes Project covers 531 sq km in NE Kazakhstan, ~13 km SW of Ekibastuz. Features paved highway, 1100 KVA power lines, heavy rail, and utilities within 15 km. Located in the Bozshakol-Chingiz metallogenic belt near major regional deposits.

Notable Quotes

  • Tim Barry, CEO: "These latest results from Berezski North represent a step-change for the Company. Intersecting more than 900 metres of porphyry-style mineralization from surface is a very significant result that has materially advanced our understanding of the scale and potential of this target."
  • Tim Barry, CEO: "Importantly the system remains open in multiple directions and at depth. These drill results combined with the coincident 3 km x 2 km geophysical and geochemical footprint we observe in the data, suggests there is still significant potential to be unlocked at the Berezski North Target."
  • Tim Barry, CEO: "Looking at the bigger picture along the entire 8.8-kilometer Berezski Trend... Arras currently has four diamond drill rigs on site focused on the Berezski Trend as part of its ongoing 20,000 m drill program this year."
Read the original news release →

More from Arras Minerals Corp.