Northwire Canada EditionWednesday, July 29, 2026
Northwire
NAM 0.250 +0.0% CRD 0.065 +8.3% OLA 12.90 −3.7% CG 22.70 −2.5% EQX 12.89 −4.0% FM 37.51 −2.3% MNRG 0.080 −11.1% KFR 1.31 +0.8% AUMN 0.275 +0.0% GLB 0.250 +0.0% BHS 0.045 −10.0% EGR 0.025 +0.0% RIO 2.59 −4.1% GEN 0.070 +0.0% MAI 4.39 −2.0% RYR 0.175 +0.0% NAM 0.250 +0.0% CRD 0.065 +8.3% OLA 12.90 −3.7% CG 22.70 −2.5% EQX 12.89 −4.0% FM 37.51 −2.3% MNRG 0.080 −11.1% KFR 1.31 +0.8% AUMN 0.275 +0.0% GLB 0.250 +0.0% BHS 0.045 −10.0% EGR 0.025 +0.0% RIO 2.59 −4.1% GEN 0.070 +0.0% MAI 4.39 −2.0% RYR 0.175 +0.0%
Drill Results

C3 Metals Intersects 269m at 0.30% Copper, Including 60.4m at 0.41% Copper from 346m in First Ever Drill Hole at Khaleesi Copper Project, Peru

C3 Metals Hits Porphyry System on First Try at Khaleesi, De-Risking Peru Asset Amid Setbacks in Jamaica

Executive Summary

On December 15, 2025, C3 Metals announced initial drill results from the first-ever hole at its 100%-owned Khaleesi copper project in Peru. The hole, KHZ5800-001, intersected a broad 269-metre zone of copper mineralization grading 0.30% copper from a depth of 346 metres. This broad zone included a higher-grade interval of 60.4 metres at 0.41% copper. The company confirmed this discovery validates its geological model, intersecting skarn- and porphyry-style mineralization that extends under thin glacial till cover. Mineralization remains open in all directions. CEO Dan Symons stated the result was "tremendous" for a greenfield project and that the grades are consistent with existing mines in the world-class Andahuaylas-Yauri belt.

Material Impact

The drill results from Khaleesi are highly positive and material for C3 Metals. This is the first tangible proof of a large-scale copper system at the company's highest-priority, 100%-owned project.

  • De-risking Event: Hitting a 269-metre mineralized interval in the first-ever drill hole significantly de-risks the Khaleesi project. It confirms the effectiveness of the extensive geological, geochemical, and geophysical work conducted over the past year and proves the presence of a significant mineralizing system.
  • Validation of Geological Model: The results confirm that mineralization extends under glacial cover, which substantially increases the potential target area. The intercept showing both porphyry and skarn styles of mineralization is consistent with the company's exploration thesis for a large system analogous to major deposits in the belt.
  • Economic Grades: While not exceptionally high-grade, 0.30% Cu over 269m with a core of 0.41% Cu over 60.4m is economically significant for a large-tonnage porphyry system, especially in a district with established mines operating at similar grades.
  • Progression of Strategy: This discovery follows a series of systematic and positive exploration steps announced throughout 2025. It contrasts with the recent operational setback in Jamaica due to Hurricane Melissa (Nov 5, 2025), highlighting the benefit of the company's diversified asset base. The company's strategy of advancing multiple projects is paying off, with a significant discovery now in hand at the project it retains 100% ownership of.

While the market has anticipated good news, with the stock price increasing over 500% in the past year, these results provide the fundamental validation to support the re-rating. The news confirms Khaleesi as the company's flagship asset and provides a clear path forward for value creation through continued drilling.

CCCM · Price
Company Overview

C3 Metals Inc. is a Canadian-based copper and gold exploration company. It holds a portfolio of projects in Peru and Jamaica. - Flagship Project: The 100%-owned Khaleesi Project in the Andahuaylas-Yauri porphyry-skarn belt of southern Peru is now the company's flagship asset. It is a large, undrilled land package proximal to major copper mines like Las Bambas. The first drill hole confirmed a significant copper discovery. - Other Key Projects: - Bellas Gate Project (Jamaica): A large copper-gold porphyry project subject to an earn-in agreement where Freeport-McMoRan can spend up to US$75M to earn a 75% interest. This partnership provides significant validation and funding. - Super Block Project (Jamaica): A 50/50 JV exploring a 5km gold trend that includes the past-producing Pennants Gold Mine.

Read the original news release →

More from C3 Metals Inc.