Drill Results
Naughty Ventures Launches Maiden Exploration Program at Green Lightning

BAD · Price
Executive Summary
- Naughty Ventures Corp. announces the launch of its maiden exploration program at the Green Lightning Lithium Project, a 7,207-hectare property in Quebec's Frotet-Evans Greenstone Belt.
- The property is strategically positioned directly adjacent to Q2 Metals Corp.'s significant Cisco Lithium Project, which recently announced an Inferred Resource of 295 million tonnes at 1.36% Li₂O.
- The $150,000 exploration program, led by VoiseyScore Geoscience Inc., will utilize modern data compilation, AI/ML modeling, and bottom-of-till sampling to generate drill-ready targets and produce an NI 43-101 Technical Report.
Key Details
- Project Location & Access: 7,207-hectare claim package in the Eeyou Istchee James Bay territory; year-round ground access via Billy Diamond Highway and regional forestry roads; ~150 km from CN rail terminus at Matagami.
- Strategic Adjacency: Directly borders Q2 Metals Corp.'s Cisco Lithium Project (announced April 20, 2026: 295M tonnes at 1.36% Li₂O Inferred Resource; 1.5 km strike length; open at depth and along strike).
- Regional Geology: Situated in the Frotet-Evans Greenstone Belt, a recognized lithium pegmatite province also hosting the Sirmac and Moblan lithium deposits, Regnault gold deposit, Montviel REE carbonatite complex, and Matagami zinc camp.
- Phase 1 Activities: Compilation and modern re-processing of geological raw data (SIGEOM datasets, assessment reports, regional prospect data, airborne magnetic/EM grids); LiDAR acquisition for outcrop probability and structural lineament extraction; satellite-based mapping (Sentinel-2, ASTER, ALOS PALSAR); satellite-derived gas estimation for pathfinder signatures; integrated structural synthesis; AI/ML prospectivity modeling against known regional pegmatite and gold occurrences.
- Phase 2 Activities: Targeted prospecting and till-bedrock interface sampling at the highest-ranked targets, subject to budget remaining after Phase 1 desktop workstreams.
- Program Deliverables: Ranked drill-ready target generation, 3D target model with drill target recommendations, and submission of an NI 43-101 Technical Report.
- Budget & Compliance: $150,000 allocated, qualifying as CSE exploration expenditure.
- Qualified Person: Clyde McMillan, P.Geo. (OGQ #02193), Principal Geologist at VoiseyScore Geoscience Inc., reviewed and approved all technical content.
- Cautionary Note: Mineral deposits, resources, and exploration results on adjacent or nearby properties are not necessarily indicative of mineralization on the Green Lightning property.
More from Naughty Ventures Corp.
Apr 17, 2026 · 07:31