Oreterra Provides Update on Timing of Trek South Drill Results
Oreterra delays Trek South assay results to early 2027 due to lab backlogs, extending the project's exploration timeline.

Oreterra Metals Corp. (OTMC) announced a delay in the release of laboratory assay results for its completed Phase 1 drill program at the Trek South porphyry copper-gold prospect. The company attributed the postponement to an unprecedented sample volume surge at the ALS Global laboratory, which has resulted in an average turnaround time of nearly 80 days.
Operational constraints further impacted the project timeline. A permit stipulation delayed camp construction until July 16, and weather-related access issues pushed the drilling start to early August, well behind the typical June window for the Golden Triangle. Management emphasized that the delay is outside the company's direct control and does not reflect the geological quality of the drilling. Results will be reported once received, reviewed, verified, and interpreted by the technical team.
Oreterra Metals Corp. (OTMC) has extended the timeline for receiving quantitative assay data, a development that does not alter the geological thesis established by visual core observations and geophysical modeling. The company has already confirmed broad porphyry-style alteration, visible copper minerals including bornite, chalcopyrite, and chalcocite, and a magnetic anomaly indicative of an intrusive root beneath the central drill fence.
Phase 1 drilling is complete, comprising 13 holes totaling approximately 4,500 meters, with infrastructure remaining in place for Phase 2 in 2027. The delay represents a standard operational hurdle in remote exploration and laboratory processing, rather than a project-specific failure or regulatory setback. While market sentiment may experience short-term frustration due to the extended wait for assay grades, the fundamental exploration progress remains intact.
Oreterra Metals Corp. is a pre-revenue exploration company focused on porphyry copper-gold and epithermal gold projects in highly prospective jurisdictions. Its flagship project, Trek South, is located in British Columbia's Golden Triangle, adjacent to the Teck-Newmont Galore Creek deposits. Trek South features a 1.6-kilometer-wide zone of porphyry-style alteration, coincident IP chargeability and magnetic anomalies, and visible copper mineralization.
The company also holds the Kinkaid project in Nevada's Walker Lane trend, which has shown high-grade gold and copper showings, and the Lundmark-Akow Lake property in Ontario. Management, led by CEO Kevin Keough, is executing a multi-phase exploration strategy aimed at defining a resource at Trek South by 2027.