Daura Gold Announces Completion of 27 km of Induced Polarization Surveying and Advances Drill Target Definition at the Cerro Bayo Gold-Silver Project, Santa Cruz Province, Argentina
Argentina Drill Program Set for February as Stock Consolidates Above Key Financing Levels

Daura Gold (DGC) announced the completion of 27 line-kilometers of Induced Polarization (IP) surveying at its optioned Cerro Bayo Gold-Silver Project in Santa Cruz, Argentina. The survey results have helped define and prioritize 15 drill targets. The company confirmed that a Phase 1 drilling program, consisting of approximately 1,500 meters, is scheduled to commence in mid-February 2026. Additionally, a regional Gradient Array IP survey has begun in the northern license area.
Concurrently, the company announced a $100,000 USD marketing and investor relations agreement with Resource Stock Digest (RSD), effective February 1, 2026. This campaign includes report creation and media purchasing.
This news is Routine - Positive. It confirms that the company is executing its exploration timeline as promised in December 2025. * Operational Credibility: The completion of the IP survey on schedule demonstrates operational competency in the field. The identification of 15 targets provides a clear pipeline for the upcoming drill program. * Marketing Timing: The engagement of a significant IR firm starting Feb 1 (just weeks before drilling starts) suggests management is confident in the targets and wants to ensure maximum liquidity and visibility during the drilling news cycle. * Exploration Logic: IP surveys are standard pre-drill activities to identify resistive (silica/veins) or conductive (sulfides) anomalies. While positive, IP anomalies do not guarantee mineralization; they only confirm structural targets.
Daura Gold is a junior explorer focused on high-grade gold and silver systems in South America. * Flagship 1 (Peru - Antonella): Located in the Ancash Department. Characterized by high-grade surface samples (up to 22.6 g/t Au and 650 g/t Ag) and proximity to Highlander Silver’s Bonita project. It is an epithermal vein system. * Flagship 2 (Argentina - Cerro Bayo): Located in the Deseado Massif, Santa Cruz. Daura is earning up to 80% from Latin Metals. This is the current active focus for drilling. It features a 6km structural corridor with low-sulfidation epithermal targets. * Yanamina (Peru): An advanced project with a historical (non-compliant) resource of ~200k oz Au, acquired for its near-surface potential.