Sego Announces Drilling at South Gold Zone Underway
None

The most recent news release, dated 2025-11-19, states that drilling is now underway at Sego Resources Inc.'s South Gold Zone, located within the Miner Mountain project. The project geologist has commenced reviewing and logging the drill core. This follows a previous announcement on 2025-11-12 that the drill and field team had arrived at Miner Mountain, preparing drill pads for an approximately 1,000-meter drilling program, focusing on both the South Gold Zone (4 holes, ~470m) and deeper exploration in the Cuba Zone.
This news is a positive, but routine, update. It signals that Sego Resources is actively executing its planned exploration program on the Miner Mountain project, a step that was fully anticipated following the recent financing and the mobilization of the drill team. The company recently completed a $625,800 financing on 2025-11-05, specifically earmarked for exploration at Miner Mountain and general working capital. The initiation of drilling confirms that these funds are being deployed for their stated purpose, demonstrating progress on the ground.
However, the news itself does not contain any new data or results that would materially alter the company's valuation or risk profile. It is an operational update indicating the continuation of previously announced plans. The stock market had likely already priced in the commencement of drilling following the financing and mobilization announcements. The actual material impact will depend on the results of this drilling program, which are yet to be released. The key expectation from the market would be the successful completion of the drill program and the subsequent announcement of assay results, particularly from the South Gold Zone, where a target of 90,000 to 150,000 ounces of gold in near-surface mineralization has been previously mentioned based on a 2024 SRK Canada Consulting review.
Sego Resources Inc. is an exploration-stage company focused on its Miner Mountain Alkalic Copper-Gold and Gold project, located near Princeton, British Columbia, Canada. The project covers 2,056 hectares and is situated approximately 15 kilometers north of the producing Copper Mountain mine, operated by Hudbay Minerals Inc.
The Miner Mountain project includes two key zones: - South Gold Zone: Characterized by near-surface, bulk-minable, disseminated gold mineralization. A 2024 SRK Canada Consulting review estimated a target of 90,000 to 150,000 ounces of gold. Historical intersections include 1.08 g/t gold over 88.0 meters. The zone dimensions are approximately 285 meters long, 145 meters wide, and 70 meters deep. The current drill program includes 4 holes totaling approximately 470 meters in this zone. - Cuba Zone: Features deeper, porphyry-style, structural-controlled copper-gold mineralization, located 1,700 meters northeast of the South Gold Zone. Planned drilling aims to explore depths greater than 200 to 500 meters below a historical 1% copper porphyry intersection. Past results include 1.2% copper and 0.24 g/t gold over 4.4 meters within an 11-meter interval of 0.6% copper and 0.12 g/t gold (from drill hole 37). The company also plans to analyze for platinum group metals (PGM) in new mineralization, following an indication of 0.13 g/t palladium over 2 meters in drill hole 37.