Northwire Canada EditionWednesday, August 19, 2026
Northwire
CERT 2.28 −2.6% FMAN 0.365 −8.8% AAUC 29.22 −5.8% WEC 0.015 +0.0% ATY 0.260 +0.0% GEN 0.060 +9.1% HMR 0.490 +2.1% SKP 0.165 +10.0% AZM 0.620 +0.0% AEM 259.53 −0.8% CG 29.58 −2.7% KS 0.160 +0.0% EMN 0.100 +5.3% CPAU 0.140 +0.0% SAG 1.23 +0.0% NAU 1.62 −9.0% CERT 2.28 −2.6% FMAN 0.365 −8.8% AAUC 29.22 −5.8% WEC 0.015 +0.0% ATY 0.260 +0.0% GEN 0.060 +9.1% HMR 0.490 +2.1% SKP 0.165 +10.0% AZM 0.620 +0.0% AEM 259.53 −0.8% CG 29.58 −2.7% KS 0.160 +0.0% EMN 0.100 +5.3% CPAU 0.140 +0.0% SAG 1.23 +0.0% NAU 1.62 −9.0%
Resource Estimate

Scorpio Gold Reports Maiden Mineral Resource Estimate and Historical Mineral Resource Estimate

SGN · Price

Executive Summary

  • Scorpio Gold announced a maiden NI 43‑101 inferred mineral resource estimate for its 100 % owned Manhattan District in Nevada, totaling 740,000 oz Au at 1.26 g/t gold over 18,343 t (selected 0.3 g/t cut‑off).
  • A historical resource estimate was also disclosed for satellite deposits, comprising 303,949 oz Au at 5.89 g/t gold over 1,652,325 t.
  • The maiden resource is based on 92,635 m of historic drilling in 1,341 holes and serves as a baseline for upcoming Phase 1 (2025) and Phase 2 drilling programs aimed at expanding the district toward multi‑million‑ounce status.

Key Details

  • Maiden MRE (Inferred) – Goldwedge & Manhattan Pit areas
  • Tonnes: 18,343 t
  • Grade: 1.26 g/t Au
  • Contained gold: 740,000 oz (0.3 g/t cut‑off)
  • Drill coverage: >92,000 m in 1,341 holes; no 2025 company drilling included yet.

  • Historical MRE (Not current) – Black Mammoth, April Fool, Hooligan, Keystone, Jumbo areas

  • Tonnes: 1,652,325 t
  • Grade: 5.89 g/t Au
  • Contained gold: 303,949 oz

  • Key intercept – Drill hole MH83‑016: 12.22 g/t Au over 70.1 m (Goldwedge target).

  • Cut‑off sensitivity table (selected 0.3 g/t):

  • 0.1 g/t → 802 koz; 0.2 g/t → 777 koz; 0.3 g/t → 740 koz; 0.4 g/t → 696 koz; … up to 1.0 g/t → 518 koz.

  • Assumptions for inferred pit‑constrained model (NI 43‑101):

  • Gold price $2,500/oz, mill recovery 90 %, pit slopes 50° ore /30° waste, mining cost $3/t, milling $15/t, G&A $3.5/t, royalty 2 %.

  • Technical methodology – Hochbaum Pseudoflow algorithm in Datamine Studio NPVS; block size 5 × 5 × 5 m; drill spacing ≤50 m (≤25 m to nearest hole); validation via ID3, OK, NN, swath plots, SGS.

  • Future work – Phase 1 2025 drilling already underway; plan to add RC rig in September; aim to convert inferred resources to higher categories and target multi‑million‑ounce resource.

  • Qualified Person – Leo Hathaway, P.Geo., Executive Technical Director (NI 43‑101).

Notable Quotes

“The Maiden MRE represents the starting point for the newly consolidated 100 % owned Manhattan District… our objective is to build a multi‑million‑ounce resource at a grade that sets it apart from peers.” – Zayn Kalyan, CEO & Director.

“Uncovering the very high‑grade interval in drill hole MH83‑016 (12.22 g/t over 70.1 m) demonstrates the upside potential of the district.” – Harrison Pokrandt, VP Exploration.

Read the original news release →

More from Scorpio Gold Corporation