Northwire Canada EditionThursday, October 15, 2026
Northwire
⌕
GOLD 4107.90 −1.7% SILVER 55.88 −6.1% COPPER 6.62 −1.6% OIL 95.09 +1.0% PALLADIUM 1096.50 −2.7% CIA 2.64 −0.4% BTO 7.09 −4.3% MCI 0.155 +0.0% CAN 0.065 +0.0% BLDS 0.335 +8.1% SAO 0.050 +0.0% SF 0.315 +0.0% BEA 0.055 −15.4% BMM 3.90 +11.1% AUGC 0.295 −13.2% MFG 3.34 −3.8% CDE 21.33 −7.7% CYG 0.160 −5.9% RSMX 0.100 −4.8% TUF 0.830 −5.7% GPG 0.285 −3.4% GOLD 4107.90 −1.7% SILVER 55.88 −6.1% COPPER 6.62 −1.6% OIL 95.09 +1.0% PALLADIUM 1096.50 −2.7% CIA 2.64 −0.4% BTO 7.09 −4.3% MCI 0.155 +0.0% CAN 0.065 +0.0% BLDS 0.335 +8.1% SAO 0.050 +0.0% SF 0.315 +0.0% BEA 0.055 −15.4% BMM 3.90 +11.1% AUGC 0.295 −13.2% MFG 3.34 −3.8% CDE 21.33 −7.7% CYG 0.160 −5.9% RSMX 0.100 −4.8% TUF 0.830 −5.7% GPG 0.285 −3.4%

Mining

Page 19
  1. Oct 07, 2026 · 07:30 · RCK · Routine +

    Rock Tech’s preliminary DFS values the Red Rock Converter project at cad$600m with construction targeting h2 2027.

    Rock Tech Lithium Announces Total Capital Costs of Approximately CAD$600 Million for Red Rock Converter based on Preliminary DFS Results

    01
  2. Oct 07, 2026 · 07:01 · TNR · Game Changer

    Altius proposes a takeout of TNR, with the specific price withheld behind exclusivity arrangements.

    TNR Gold Receives Non-Binding Acquisition Proposal from Altius Minerals; Enters into Exclusivity Arrangement

    02
  3. Oct 07, 2026 · 07:01 · FDR · Material +

    Founders’ new parallel Froyo shear adds scale with 456 g·m grades largely priced at a $1.2 billion capitalisation.

    Froyo Zone Keeps Growing: Founders Metals Hits 54.0 m of 8.45 g/t Gold

    03
  4. Oct 07, 2026 · 07:01 · GIG

    XAU Resources Inc. Announces Amendments to Business Combination Agreement with QS Holdings Inc.

    XAU Resources Inc. Announces Amendments to Business Combination Agreement with QS Holdings Inc.

    04
  5. Oct 07, 2026 · 07:01 · ELO · Routine +

    Eloro reports solid step-out grades at the Iska Iska deposit, confirming continuity within the known mineralised system.

    Eloro Resources Intersects 87.10 Metres Grading 73.26 g/t Silver and 0.18% Tin; and 17.90 Metres Grading 190.50 g/t Silver and 0.45% Tin in Expansion Drilling at Its Iska Iska Project, Potosi Department, Southern Bolivia

    05
  6. Oct 07, 2026 · 07:01 · ARIC · Material +

    Awale’s BBM step-out and best-yet pit intercepts beat the stock that round-tripped.

    Awale Extends BBM Along Strike and at Depth with 47 Metres of 2.2 g/t AuEq. Outside the Resource and Intersects 44 Metres of 3.1 g/t AuEq. near Surface

    06
  7. Oct 07, 2026 · 07:01 · SYG · Neutral

    Sylla’s exploration in Mali remains on hold due to permit delays and payment extensions.

    Sylla Gold Extends Final Sananfara Option Payment and Provides Deguefarakole Licence Renewal Update

    07
  8. Oct 07, 2026 · 07:01 · AGA · Routine +

    Silver47 mapped a 15km high-grade vein network at the Kennedy project ahead of its inaugural drilling campaign.

    Silver47 Soil Survey Highlights 15 km High-Grade Vein Network and Outlines New Disseminated Gold Target at Kennedy, Nevada

    08
  9. Oct 07, 2026 · 07:01 · LAF · Routine +

    Lithium Africa pivots to concentrate processing at its Springbok project, targeting a 2027 start-up date for the facility.

    Lithium Africa to Advance Springbok Project to Production Targeted for 2027

    09
  10. Oct 07, 2026 · 07:00 · OR · Neutral

    Or’s Q3 gold output remained flat year-on-year as Barnat production declines offset ramp-ups, while revenue rose 26% driven by higher prices.

    OR Royalties Announces Preliminary Q3 2026 GEO Deliveries

    10
  11. Oct 07, 2026 · 07:00 · TITI · Routine +

    Titiminas confirms metallurgical processability for its pre-revenue project, though dilution risks remain a key consideration for the development.

    Titiminas Silver Reports Preliminary Metallurgical Test Results: Conventional Flotation Produces Copper, Lead and Zinc Concentrates at the Madre Sierra Silver Mine and a Copper-Silver Concentrate at Madre Sierra Norte

    11
  12. Oct 07, 2026 · 07:00 · SASK · Routine +

    Atha’s seven-of-seven radiometric hits extend the strike to 3.4 km, doubling the known length without assay confirmation.

    ATHA Energy Successfully Completes Diamond Drilling at RIB North Discovery, Expanding Strike Length To 3.4 Km, And Identifies a Higher-Grade Sub Zone: Results Include RIBN-DD-023 Intersecting 19.5 M Of Composite Uranium Mineralization With 2.0 M Of High-G

    12
  13. Oct 07, 2026 · 07:00 · NOU · Routine +

    Nouveau Monde Graphite’s bio-based coating cuts anode emissions by 130kg CO2e per tonne, securing a supply edge for the G7.

    NMG Develops Low-carbon-Footprint Anode Material Coating Process in Collaboration with McGill University

    13
  14. Oct 07, 2026 · 07:00 · QTWO · Routine +

    Q2’s long, low-grade Cisco step-out results highlight that the project’s Preliminary Economic Assessment, rather than new drilling, serves as the primary catalyst.

    Q2 Metals Extends Near Surface Mineralization 100 Metres North at the Cisco Lithium Project, Intercepting 134.5 Metres at 1.20% Li2O and 101.6 Metres at 1.02% Li2O

    14
← Newer Older →