Northwire Canada EditionThursday, October 15, 2026
Northwire
⌕
GOLD 4107.90 −1.7% SILVER 55.88 −6.1% COPPER 6.62 −1.6% OIL 95.09 +1.0% PALLADIUM 1096.50 −2.7% CIA 2.64 −0.4% BTO 7.09 −4.3% MCI 0.155 +0.0% CAN 0.065 +0.0% BLDS 0.335 +8.1% SAO 0.050 +0.0% SF 0.315 +0.0% BEA 0.055 −15.4% BMM 3.90 +11.1% AUGC 0.295 −13.2% MFG 3.34 −3.8% CDE 21.33 −7.7% CYG 0.160 −5.9% RSMX 0.100 −4.8% TUF 0.830 −5.7% GPG 0.285 −3.4% GOLD 4107.90 −1.7% SILVER 55.88 −6.1% COPPER 6.62 −1.6% OIL 95.09 +1.0% PALLADIUM 1096.50 −2.7% CIA 2.64 −0.4% BTO 7.09 −4.3% MCI 0.155 +0.0% CAN 0.065 +0.0% BLDS 0.335 +8.1% SAO 0.050 +0.0% SF 0.315 +0.0% BEA 0.055 −15.4% BMM 3.90 +11.1% AUGC 0.295 −13.2% MFG 3.34 −3.8% CDE 21.33 −7.7% CYG 0.160 −5.9% RSMX 0.100 −4.8% TUF 0.830 −5.7% GPG 0.285 −3.4%

Mining

Page 17
  1. Oct 07, 2026 · 07:56 · EDCU · Routine +

    Edge reports on-model Zonia oxide hits, though the boundary-break claim currently carries no tonnes.

    Edge Copper Reports Broad Oxide Intercepts at Zonia and Confirms Mineralization Beyond Previously Interpreted Boundaries

    01
  2. Oct 07, 2026 · 07:46 · VML · Neutral

    Viscount re-cut K26-08 without new assays or tonnes, confirming previously reported grades and widths for the deposit.

    Viscount Provides Additional Interpretation of Drill Hole K26-08, and Advancing High-Priority Kate-Passiflora Trend Target at Silver Cliff

    02
  3. Oct 07, 2026 · 07:45 · BGD · Routine +

    Bullion’s Terragold project broadens to a 53.6 m envelope, though the grade remains sub-band and unpriced.

    Bullion Gold Intersects 1.73 g/t Au Over 13.4 Metres Including 3.80 g/t Au Over 4.4 Metres in DDH TG-04 at Terragold

    03
  4. Oct 07, 2026 · 07:39 · XTM · Routine +

    Transition expands the Gowganda gold footprint by 1,200m ahead of planned drilling in 2027.

    Transition Metals Extends Geochemical Footprint of Haultain Gold System and Identifies New Large-Scale Exploration Targets at Gowganda Project, Ontario

    04
  5. Oct 07, 2026 · 07:34 · ZLTO · Routine +

    Bulgold’s surface boulder samples of 21.2 g/t Au expand the Kopernica vein system footprint by 170%.

    BULGOLD Samples 21.2g/t Gold at Surface and Expands Kopernica Footprint by 170% to 1,700 Metres by 800 Metres, Lutila Project

    05
  6. Oct 07, 2026 · 07:32 · RVG · Routine +

    Revival confirms grade continuity at Joss wedge holes without adding new scale to the deposit.

    Revival Gold Intersects 8.4 g/t Gold over 6.2 Meters and 8.5 g/t Gold over 3.4 Meters Supporting Overall Continuity of Mineralization at the Beartrack-Arnett Joss Target

    06
  7. Oct 07, 2026 · 07:32 · SAGA · Routine +

    Saga’s 495.6 m drill hole confirms the known system at its project, marking the longest hole to date.

    SAGA Metals Drills 495.6 m at 37.86% Fe2O3, 5.51% TiO2, 0.273% V2O5 Including 68.2 m at 52.95% Fe2O3, 8.57% TiO2, 0.381% V2O5 at Radar Critical Minerals Project in Labrador

    07
  8. Oct 07, 2026 · 07:32 · KLD · Routine +

    Kenorland begins South Uchi Phase 4 drilling as Franco-Nevada stakes a 12.4% interest in the project.

    Kenorland and Auranova Commence Phase 4 Drill Program at the South Uchi Project, Ontario

    08
  9. Oct 07, 2026 · 07:32 · AURA · Routine +

    Auranova’s 5,000m phase 4 drill program at the Red Lake project advances toward securing a 70% stake in the deposit.

    Auranova and Kenorland Commence Phase 4 Drill Program at the South Uchi Project, Ontario

    09
  10. Oct 07, 2026 · 07:32 · ONAU · Routine +

    OnGold launches a $9.3 million drilling program at the TPK project to test mineralised zones.

    ONGold Announces Commencement of 2026 Phase 2 Diamond Drilling Program at TPK

    10
  11. Oct 07, 2026 · 07:31 · FOXT · Neutral

    Fox Tungsten confirms high-grade RC results at South while Fox North visual intercepts failed to convert to assayable grades.

    Fox Tungsten Reports Initial Assay Results from 2026 Drill Program, Including High-Grade Intervals at RC South

    11
  12. Oct 07, 2026 · 07:30 · SNAG · Neutral

    Silver North completes its largest Haldane program with zero new assays, leaving the market waiting on pending results.

    Silver North Completes Largest Drill Program To Date at Haldane Silver Project, Keno Hill Silver District, Yukon

    12
  13. Oct 07, 2026 · 07:30 · RCK · Routine +

    Rock Tech’s preliminary DFS values the Red Rock Converter project at cad$600m with construction targeting h2 2027.

    Rock Tech Lithium Announces Total Capital Costs of Approximately CAD$600 Million for Red Rock Converter based on Preliminary DFS Results

    13
  14. Oct 07, 2026 · 07:30 · NOB · Routine +

    Noble advances its Lucas drill program with a grant, though dilution risks persist at the deposit.

    Noble Minerals Prepares for Drill Program on the Lucas Gold Project

    14
← Newer Older →