Northwire Canada EditionWednesday, November 11, 2026
Northwire
⌕
Gold 3,993.60 −0.9% Silver 51.84 +1.2% Copper 6.27 +0.6% Oil 86.92 +1.0% Palladium 1,038.75 +1.8% TNR 0.410 +36.7% ORCL 0.030 +0.0% ELD 48.57 −3.7% OPW 0.140 −6.7% CDE 21.60 −0.5% AEM 267.04 −1.3% WDO 27.98 −1.2% BEA 0.090 +0.0% GAU 3.45 −3.1% BTO 7.45 −1.3% IMG 26.10 −0.9% BOL 0.055 −8.3% CNT 0.030 +0.0% EXN 0.245 −1.0% MNRG 0.075 +0.0% GSKR 2.79 −2.8% Gold 3,993.60 −0.9% Silver 51.84 +1.2% Copper 6.27 +0.6% Oil 86.92 +1.0% Palladium 1,038.75 +1.8% TNR 0.410 +36.7% ORCL 0.030 +0.0% ELD 48.57 −3.7% OPW 0.140 −6.7% CDE 21.60 −0.5% AEM 267.04 −1.3% WDO 27.98 −1.2% BEA 0.090 +0.0% GAU 3.45 −3.1% BTO 7.45 −1.3% IMG 26.10 −0.9% BOL 0.055 −8.3% CNT 0.030 +0.0% EXN 0.245 −1.0% MNRG 0.075 +0.0% GSKR 2.79 −2.8%
Resource Estimate

Abitibi Metals Delivers 124% Resource Growth at B26, Defining a High-Grade Copper-Gold System of Meaningful Scale

AMQ · Price

Executive Summary

  • Abitibi Metals announced a 124% increase in total mineral resources at its B26 deposit, now totaling >25 Mt (13.0 Mt Indicated + 12.3 Mt Inferred) with an average grade of 2.1 % CuEq.
  • Contained metal totals rose sharply: copper +40%, gold +22%, silver +21%, zinc +9%; the Indicated resource now holds ~340 M lbs Cu, 332 M lbs Zn, 184 k oz Au, and 12.8 M oz Ag (595 M lbs CuEq, 1.2 M oz AuEq).
  • The company has launched a fully‑funded 40,000‑m Phase 4 drill program (≈15–20 k m winter campaign) to further expand the deposit through 2026.

Key Details

  • Resource Expansion
  • Indicated: 13.0 Mt @ 2.1 % CuEq (1.2 % Cu, 1.2 % Zn, 0.44 g/t Au, 30.8 g/t Ag) – up 14% in tonnage vs. prior estimate.
  • Inferred: 12.3 Mt @ 2.2 % CuEq – new category added since last update.
  • Total defined resources >25 Mt @ 2.1 % CuEq.

  • Contained Metals (Indicated)

  • Copper: ~340 M lbs (595 M lbs CuEq)
  • Zinc: ~332 M lbs
  • Gold: ~184 k oz (1.2 M oz AuEq)
  • Silver: ~12.8 M oz

  • Drilling Database

  • 356 drill holes, 172,164 m total depth.
  • Includes 102 holes drilled by Abitibi in 2024‑2025 and 191 historic holes from SOQUEM/Investissement Québec.
  • 67,842 assays with average core length 1.20 m underpin the model.

  • Assumptions & Cut‑off

  • Underground mining scenario; US$100/t cut‑off based on long‑term metal price assumptions and processing recoveries.
  • ~9% of tonnage increase driven by revised commodity price assumptions; remainder from new drilling and lateral/vertical extensions.

  • Future Drilling Program

  • Phase 4: 40,000 m total, fully funded.
  • Winter campaign: ~15,000–20,000 m planned; continuation through 2026 to test open‑ended zones laterally and at depth.

  • Strategic Context

  • B26 sits 7 km from the former Selbaie mine within a well‑established mining district, offering infrastructure and skilled labor.
  • The deposit now qualifies as a “cornerstone” VMS copper‑gold asset supporting Abitibi’s Québec portfolio strategy.

Notable Quotes

  • Jonathon Deluce, CEO: “The updated resource demonstrates our ability to rapidly grow a high‑grade, polymetallic system while maintaining consistent grades—a key milestone that positions B26 as a cornerstone asset in the Abitibi Greenstone Belt.”
Read the original news release →

More from Abitibi Metals Corp.