Omai Gold Intersects 4.18 g/t Au over 14.6m and 3.73 g/t Au over 17.3m and Commences 50,000m Drill Program
Omai Gold Scales Up with 50,000m Drill Blitz as Wenot Assays Confirm High-Grade Continuity

The most recent news release (February 25, 2026) announces high-grade assay results from six additional drill holes at the Omai Gold Project in Guyana and the commencement of a massive 50,000-metre diamond drill program. Key intercepts include 4.18 g/t Au over 14.6m and 3.73 g/t Au over 17.3m in hole 25ODD-119W, and 1.94 g/t Au over 30.3m in hole 25ODD-150W3. The new 50,000m program is designed to upgrade the large Wenot inferred resource, explore geophysical anomalies, and test the "Deep Dike Corridor" for down-dip extensions of high-grade zones. Five drills are expected to be operational by next week.
The news is Material - Positive for several reasons: - Scale of Exploration: A 50,000m drill program is exceptionally large for a junior/mid-tier developer, signaling strong confidence and a robust treasury (C$57M reported at year-end 2025). - Resource De-risking: The focus on upgrading "Inferred" resources to "Indicated" is a critical step for the upcoming Feasibility Study and project financing. - Continuity: The assay results confirm that high-grade mineralization persists within the Wenot system, supporting the "Gold Camp" thesis rather than isolated deposits. - Operational Momentum: Moving from 39,000m in 2025 to a 50,000m commitment in 2026 shows an acceleration of development timelines.
Omai Gold Mines owns 100% of the Omai Gold Project in Guyana, a brownfield site that produced over 3.7 million ounces of gold between 1993 and 2005. The project consists of two primary deposits: - Wenot: A shear-hosted orogenic deposit currently being optimized for a large-scale open pit. - Gilt Creek: An intrusion-hosted deposit located 500m north of Wenot, planned for underground mining. The project benefits from significant existing infrastructure (airstrip, road access, cleared site) and a mining-friendly jurisdiction.