Northwire Canada EditionWednesday, November 11, 2026
Northwire
⌕
Gold 4,006.90 −0.6% Silver 52.05 +1.6% Copper 6.30 +1.0% Oil 87.70 +1.9% Palladium 1,052.00 +3.1% ORCL 0.030 +0.0% ELD 49.35 −2.1% OPW 0.150 +0.0% CDE 21.73 +0.1% AEM 268.65 −0.7% WDO 28.25 −0.2% BEA 0.090 +0.0% GAU 3.48 −2.1% BTO 7.46 −1.1% IMG 26.13 −0.8% BOL 0.060 +0.0% CNT 0.030 +0.0% EXN 0.250 +1.0% MNRG 0.080 +6.7% GSKR 2.83 −1.4% FPC 0.450 +1.1% Gold 4,006.90 −0.6% Silver 52.05 +1.6% Copper 6.30 +1.0% Oil 87.70 +1.9% Palladium 1,052.00 +3.1% ORCL 0.030 +0.0% ELD 49.35 −2.1% OPW 0.150 +0.0% CDE 21.73 +0.1% AEM 268.65 −0.7% WDO 28.25 −0.2% BEA 0.090 +0.0% GAU 3.48 −2.1% BTO 7.46 −1.1% IMG 26.13 −0.8% BOL 0.060 +0.0% CNT 0.030 +0.0% EXN 0.250 +1.0% MNRG 0.080 +6.7% GSKR 2.83 −1.4% FPC 0.450 +1.1%
Drill Results

American Tungsten Reports Initial Drilling Results from IMA Tungsten Project, Significant Tungsten-Silver Intercepts in All Drillholes

TUNG · Price

Executive Summary

  • American Tungsten reported high‑grade tungsten‑silver intercepts from initial underground drilling at the IMA Mine (e.g., 31 ft @ 0.48% WO₃ & 1.84 oz/t Ag).
  • The results support advancement toward a defined mineral resource and indicate a silver by‑product that could offset operating costs.
  • Phase 1 drilling is ongoing with additional ~3,600 ft completed and further ~12,600 ft planned across D‑Level and Zero Level stations.

Key Details

  • Hole AT25‑01: 31 ft interval grading 0.48% WO₃ and 1.84 oz/t Ag (true width estimated at 60%).
  • Hole AT25‑02: 11.1 ft interval grading 1.08% WO₃ and 2.05 oz/t Ag (true width reported).
  • Hole AT25‑03: 16.3 ft interval grading 0.54% WO₃ and 1.79 oz/t Ag (true width estimated at 60%).
  • Additional intercepts across the four holes show consistent mineralized quartz veins with hubnerite, scheelite, tetrahedrite, galena, sphalerite, chalcopyrite, fluorite, and rhodochrosite.
  • Total Phase 1 drilling to date: 10 underground holes ≈ 3,800 ft on rehabilitated D‑Level; 4 holes reported in detail, assays for remaining holes pending.
  • Planned drilling: 7 more holes (~2,600 ft) from the second D‑Level station; development of Zero Level drill station complete with a second rig being set up for up to 20 holes (~10,000 ft).
  • QA/QC: Core handled under chain‑of‑custody; samples assayed by ALS Global using ICP‑MS and fire assay methods; qualified person (Austin Zinsser, P.Geo., SME‑RM) approved technical content per NI 43‑101.
  • Forward‑looking statements indicate the company will use these results to define a mineral resource and move toward project development.

Notable Quotes

“These results show strong grades over significant widths… They will support the definition of a Mineral Resource—an important step toward bringing the mine online.” – Ali Haji, CEO


All boilerplate, safe‑harbor language, and social media links have been omitted for brevity.

Read the original news release →

More from American Tungsten Corp