Northwire Canada EditionThursday, July 30, 2026
Northwire
TECK 86.37 +6.8% BIG 0.700 +18.6% PTU 0.320 −3.0% GZD 0.080 −11.1% AFM 1.47 +2.8% VCT 0.065 +8.3% BEM 0.065 +0.0% NMI 0.195 +0.0% VLD 0.540 +0.0% BOL 0.080 +6.7% EDCU 0.430 −2.3% SYH 0.375 +1.4% TECT 2.07 +1.0% NAU 1.49 −0.7% VTEN 0.750 +0.0% DLTA 0.155 +3.3% TECK 86.37 +6.8% BIG 0.700 +18.6% PTU 0.320 −3.0% GZD 0.080 −11.1% AFM 1.47 +2.8% VCT 0.065 +8.3% BEM 0.065 +0.0% NMI 0.195 +0.0% VLD 0.540 +0.0% BOL 0.080 +6.7% EDCU 0.430 −2.3% SYH 0.375 +1.4% TECT 2.07 +1.0% NAU 1.49 −0.7% VTEN 0.750 +0.0% DLTA 0.155 +3.3%
Drill Results

INTEGRA ANNOUNCES RESULTS FROM NEAR-MINE OXIDE GOLD DRILLING AT FLORIDA CANYON; GROWTH POTENTIAL CONFIRMED AND DRILL PROGRAM EXPANDED

ITR · Price

Executive Summary

  • Integra announced initial results from its 2025 growth drilling program at the Florida Canyon Mine, confirming extensive near‑surface oxide gold mineralization in historic dump material and inter‑pit zones.
  • High‑grade intercepts (e.g., 4.53 g/t Au over 1.5 m; 0.47 g/t Au over 39.6 m) and ~70% of North Dump holes exceed the current cut‑off grade, supporting a material expansion of resources and reserves.
  • Based on early success, the drill program has been expanded by ~6,000 m to a total of ~16,000 m; results will feed a mineral resource & reserve update and a revised life‑of‑mine plan slated for H1 2026.

Key Details

  • Program Scope: Increased from ~10,000 m to ~16,000 m (RC and sonic drilling); ~5,700 m completed at release date.
  • North Dump – Oxide Gold Intercepts
  • FCM25‑0569: 0.28 g/t Au over 68.6 m
  • FCM25‑0570: 0.36 g/t Au over 71.6 m
  • FCM25‑0575: 0.37 g/t Au over 47.2 m (incl. 4.53 g/t Au over 1.5 m)
  • ~70% of intercepts > 0.11 g/t cut‑off.
  • Inter‑Pit (In‑Situ) Zones – Oxide Gold Intercepts
  • FCM25‑0588: 0.47 g/t Au over 39.6 m (North Pit)
  • FCM25‑0591: 0.27 g/t Au over 114.3 m (Central/Radio Tower Saddle)
  • FCM25‑0600: 0.25 g/t Au over 73.2 m (Central/Radio Tower Saddle)
  • ~40% of Radio Tower Pit holes > 0.14 g/t; ~35% of other Inter‑Pit holes > 0.11 g/t.
  • Metallurgical Testing: Bottle‑roll leach tests underway; early indications show favorable heap‑leach characteristics for oxide material.
  • Future Work: Volume and grade estimation for North & South Dumps in progress; additional drilling to continue through summer/fall 2025.
  • Impact Timeline: Results will underpin a mineral resource & reserve update and a revised life‑of‑mine plan expected in the first half of 2026.

Notable Quotes

“Broad, consistent oxide gold‑mineralized intercepts confirm excellent grade continuity… The success of initial drilling has led us to increase the scope of the program by ~6,000 m.” – George Salamis, President, CEO & Director


Materiality: Material – Positive (the disclosed drill results materially enhance the outlook for resource growth and mine life at Integra’s flagship asset.)

Read the original news release →

More from Integra Resources Corp.