Northwire Canada EditionSaturday, August 1, 2026
Northwire
S 0.140 +0.0% BNKR 4.40 −2.2% QRO 0.045 +0.0% VCT 0.075 +36.4% PPP 1.15 +0.9% LMG 0.390 +0.0% GRDM 0.140 +0.0% ABRA 13.58 −4.1% WHY 0.295 +1.7% HHH 3.94 −0.2% COS 0.060 +0.0% NOB 0.065 −23.5% MEK 0.055 +0.0% TGOL 0.105 −4.5% FCI 0.400 −7.0% SGQ 0.350 +0.0% S 0.140 +0.0% BNKR 4.40 −2.2% QRO 0.045 +0.0% VCT 0.075 +36.4% PPP 1.15 +0.9% LMG 0.390 +0.0% GRDM 0.140 +0.0% ABRA 13.58 −4.1% WHY 0.295 +1.7% HHH 3.94 −0.2% COS 0.060 +0.0% NOB 0.065 −23.5% MEK 0.055 +0.0% TGOL 0.105 −4.5% FCI 0.400 −7.0% SGQ 0.350 +0.0%
Drill Results

Sranan Gold Continues to Intercept High-Grade Gold at Tapanahony, Suriname as 2026 Drilling Program Commences

SRAN · Price

Executive Summary

  • Sranan Gold reports a high‑grade gold intercept of 10.88 g/t Au over 1 m at the Randy’s Pit Target, confirming continuity of mineralization along the 4.5 km Poeketi Shear Zone (PSZ).
  • The 2025 drill program completed 4,198 m of drilling; final assays show multiple zones with grades up to 10.88 g/t Au, and the target remains open both laterally and at depth.
  • The 2026 drilling campaign is being expanded by an additional 2,500 m (to a minimum total of 7,500 m) with plans to start drilling the Poeketi Target in Q2 2026.

Key Details

  • High‑grade intercept: 10.88 g/t Au over 1 m (within a 10 m interval averaging 1.36 g/t Au).
  • Other notable intercepts (cut‑off 0.3 g/t Au):
  • Hole 25RADD‑018: 3.19 g/t Au over 4 m; 6.77 g/t Au over 1 m; 10.88 g/t Au over 1 m.
  • Hole 25RADD‑019: 4.36 g/t Au over 2 m; 6.77 g/t Au over 1 m.
  • Drill depths: 150–182 m (holes 25RADD‑017, ‑018, ‑019).
  • Geographic coordinates provided for each hole (UTM Easting/Northing, elevation, azimuth, dip).
  • Program status: 2025 program completed; 2026 program expanded by 2,500 m to reach at least 7,500 m total.
  • Future work: Planning to commence drilling at the Poeketi Target in Q2 2026; continued sampling, mapping, and trenching along the PSZ.
  • QA/QC: Samples assayed by Filab (Paramaribo); >2 g/t Au samples re‑assayed with 50‑gram gravimetric method; standard QA/QC procedures applied.
  • Qualified Person: Dr. Dennis J. LaPoint, Ph.D., P.Geo., EVP Exploration & Business Development (not independent per NI 43‑101).

Notable Quotes

“Since mid‑2025, we have quickly advanced the Tapanahony Project … to completing 4,198 m of diamond drilling at the Randy’s Pit Target that outlines high‑grade gold mineralization.” – Oscar Louzada, CEO

“The Randy’s Pit drilling continues to deliver significant high‑grade gold results and strengthen our confidence that the PSZ hosts a robust and potentially large gold system.” – Dennis LaPoint, EVP Exploration & Business Development

Read the original news release →

More from Sranan Gold Corp.