Northwire Canada EditionThursday, August 13, 2026
Northwire
BNZ 0.060 −7.7% NOU 2.03 +1.5% OOR 0.055 +10.0% MOON 6.97 −5.7% LOD 0.370 +0.0% CYG 0.150 +0.0% PHNM 0.395 +1.3% AWE 0.150 +30.4% FTZ 0.420 +0.0% PLY 0.055 +0.0% AZS 0.710 +0.0% RARE 9.05 +0.0% FOXT 0.160 −5.9% UCU 2.94 +0.7% BEM 0.090 +0.0% MANU 0.275 +25.0% BNZ 0.060 −7.7% NOU 2.03 +1.5% OOR 0.055 +10.0% MOON 6.97 −5.7% LOD 0.370 +0.0% CYG 0.150 +0.0% PHNM 0.395 +1.3% AWE 0.150 +30.4% FTZ 0.420 +0.0% PLY 0.055 +0.0% AZS 0.710 +0.0% RARE 9.05 +0.0% FOXT 0.160 −5.9% UCU 2.94 +0.7% BEM 0.090 +0.0% MANU 0.275 +25.0%
Drill Results

F4 outlines three conductive trends at Wales Lake West

FFU · Price

Executive Summary

  • F4 Uranium Corp. completed a 1,031 km airborne VTEM‑Plus survey over the Wales Lake West property and identified three new conductive trends for follow‑up exploration.
  • The property lies within 20–28 km of major regional uranium deposits (Paladin’s Triple R and Nexgen Energy’s Arrow), enhancing its prospective value.
  • Company plans to ground‑truth the targets with EM surveys and drill testing, building on prior summer drilling that intersected graphitic structures.

Key Details

  • Survey Scope: 1,031 km of airborne VTEM‑Plus data collected over Wales Lake West (part of the 40,113‑ha Wales Lake project).
  • New Findings: Three previously unidentified conductive trends detected; deeper interpretation is ongoing.
  • Geographic Context: Property located ~20 km SW of Paladin’s Triple R deposit and ~28 km SW of Nexgen Energy’s Arrow deposit; situated near existing conductive corridors (Dirkson, Saloon trend).
  • Exploration Plan:
  • Continue interpretation of VTEM data.
  • Conduct ground EM surveys on identified conductors.
  • Drill test promising targets, replicating the summer program that intersected graphitic structures (see Aug 5 2025 release).
  • Project Status: 100 % owned, permitted and drill‑ready; only two historic drill holes to date, indicating a largely underexplored target base.
  • Access: Property traversed by Provincial Highway 955.
  • Qualified Person: Sam Hartmann, President & COO (qualified person) reviewed and approved all technical information per NI 43‑101.

Notable Quotes

“Now, with complete airborne VTEM coverage over the entire project, we can continue our exploration process: selecting areas of enhanced conductivity in favourable areas, ground truthing them with ground EM [electromagnetics] and then drill testing.” – Sam Hartmann, President & COO, F4 Uranium Corp.

Read the original news release →

More from F4 Uranium Corp.