Northwire Canada EditionSunday, August 2, 2026
Northwire
S 0.140 +0.0% BNKR 4.40 −2.2% QRO 0.045 +0.0% VCT 0.075 +36.4% PPP 1.15 +0.9% LMG 0.390 +0.0% GRDM 0.140 +0.0% ABRA 13.58 −4.1% WHY 0.295 +1.7% HHH 3.94 −0.2% COS 0.060 +0.0% NOB 0.065 −23.5% MEK 0.055 +0.0% TGOL 0.105 −4.5% FCI 0.400 −7.0% SGQ 0.350 +0.0% S 0.140 +0.0% BNKR 4.40 −2.2% QRO 0.045 +0.0% VCT 0.075 +36.4% PPP 1.15 +0.9% LMG 0.390 +0.0% GRDM 0.140 +0.0% ABRA 13.58 −4.1% WHY 0.295 +1.7% HHH 3.94 −0.2% COS 0.060 +0.0% NOB 0.065 −23.5% MEK 0.055 +0.0% TGOL 0.105 −4.5% FCI 0.400 −7.0% SGQ 0.350 +0.0%
Drill Results

Sankamap Advances Toward Inaugural Drilling at Kuma Property in the Solomon Islands

SCU · Price

Executive Summary

  • Sankamap Metals Inc. announced the preparation and mobilization for its inaugural drill program at the 4,500‑ha Kuma property in the Solomon Islands, with drilling slated to start in February 2026.
  • Field activities have completed initial drill pad construction, camp set‑up, and rock sampling (44 samples shipped for analysis) to refine target selection.
  • Historical surface sampling on Kuma has returned high‑grade values up to 13.5 g/t Au and 11.7 % Cu, underscoring the property's strong exploration potential.

Key Details

  • Property Overview: Kuma property (4,500 ha) located ~37 km SE of Honiara; situated on a trend that hosts Lihir (71 Moz Au) and Panguna (19.3 Moz Au + 5.3 Mt Cu).
  • Field Mobilization:
  • Drill pad construction completed.
  • Camp construction underway, expected completion in coming weeks.
  • Field crew mobilized for rock sampling and prospecting.
  • Sampling Program:
  • 44 surface rock samples collected (Nov 2025) and shipped to ALS Global (Brisbane) for geochemical analysis and hyperspectral characterization.
  • Sampling aimed at refining geological models, targeting alteration, Cu‑Au anomalies, and geophysical responses.
  • Historical High‑Grade Results:
  • Boulder/soil grab samples up to 13.5 g/t Au and 11.7 % Cu reported from Kuma.
  • Drilling Timeline: Program expected to commence in February 2026 once drill rig arrives on Guadalcanal.
  • Quality Assurance: Samples processed under ISO/IEC 17025‑compliant procedures at ALS Global; fire assay (50 g) for Au and multi‑acid digestion for 34 elements performed.
  • Strategic Context: Kuma lies ~15 km south of the operating Goldridge Mine (8.4 Moz Au), providing established in‑country support and infrastructure.

Notable Quotes

  • “We are excited to launch our inaugural drill program at Kuma… drilling on track to begin in February 2026.”John Florek, CEO
  • “Historical sampling has returned values of up to 13.5 g/t Au and 11.7 % Cu, underscoring the exceptional exploration potential.”John Florek, CEO
Read the original news release →

More from Sankamap Metals Inc.