Purepoint Commences 2026 Drilling Program At Dorado Following Nova Uranium Discovery
Purepoint Uranium Begins 2026 Drilling After High-Grade Nova Discovery Fuels 700% Run

The most recent news release (2026-01-26) announces the commencement of a focused winter drill program at the Dorado Project, a 50/50 joint venture with IsoEnergy Ltd. The program, comprising up to 10 holes and 4,300 metres, is designed to expand the high-grade Nova Uranium Discovery made in mid-2025. This marks the first phase of a broader 2026 program, which includes a later summer drilling campaign and an airborne geophysical survey. The release reiterates a historical intercept from the 2025 discovery (2.1m of 1.6% U3O8, including 0.4m of 8.1% U3O8) and quotes the CEO expressing confidence in the discovery's growth potential.
This news is a routine operational update that confirms the company is executing on a previously announced and approved plan. The expanded 2026 Dorado program (7,450m total) was formally approved and announced on 2025-12-04, which itself was a Material - Positive event. The current release simply marks the start of that planned work. While the commencement of drilling is a necessary step and maintains operational momentum, it does not in itself deliver new value-drivers (i.e., assay results). The market had already priced in the expectation of this winter program following the highly successful 2025 Nova discovery and subsequent financing. Therefore, the impact is neutral to slightly positive as it confirms timeline execution but lacks new material information.
Purepoint Uranium is a Canadian exploration company focused on advancing a pipeline of uranium projects in the Athabasca Basin, Saskatchewan. Its strategy leverages joint ventures with major partners (IsoEnergy, Cameco, Foran Mining) to fund exploration while retaining 100% ownership of its key Tabbernor project.
Flagship Project: Dorado JV (50% with IsoEnergy Ltd.) - Location: Southeastern Athabasca Basin. - Key Asset: The high-grade "Nova" basement-hosted uranium discovery made in 2025 at the Q48 target. - Discovery Highlights: Intercepts include 2.1m of 1.6% U3O8 (including 0.4m of 8.1% U3O8) and peak radioactivity of 110,800 cps. Mineralization is hosted in a steeply dipping structure open along strike and at depth. - Context: The project is along the northeastern extension of the Larocque trend, adjacent to IsoEnergy's high-grade Hurricane deposit. The shallow unconformity (30-300m depth) allows for cost-effective drilling. - Status: Actively drilling (Winter 2026 program underway).