Northwire Canada EditionSaturday, August 1, 2026
Northwire
S 0.140 +0.0% BNKR 4.40 −2.2% QRO 0.045 +0.0% VCT 0.075 +36.4% PPP 1.15 +0.9% LMG 0.390 +0.0% GRDM 0.140 +0.0% ABRA 13.58 −4.1% WHY 0.295 +1.7% HHH 3.94 −0.2% COS 0.060 +0.0% NOB 0.065 −23.5% MEK 0.055 +0.0% TGOL 0.105 −4.5% FCI 0.400 −7.0% SGQ 0.350 +0.0% S 0.140 +0.0% BNKR 4.40 −2.2% QRO 0.045 +0.0% VCT 0.075 +36.4% PPP 1.15 +0.9% LMG 0.390 +0.0% GRDM 0.140 +0.0% ABRA 13.58 −4.1% WHY 0.295 +1.7% HHH 3.94 −0.2% COS 0.060 +0.0% NOB 0.065 −23.5% MEK 0.055 +0.0% TGOL 0.105 −4.5% FCI 0.400 −7.0% SGQ 0.350 +0.0%
Drill Results

Peloton Announces Successful Maiden Drilling Results at the North Elko Lithium Project, Nevada

PMC · Price

Executive Summary

  • Peloton Minerals announced maiden lithium‑focused drilling at its 100% owned North Elko Lithium Project (NELP) in Nevada, intersecting lithium mineralization in all four holes.
  • The best downhole interval returned 155 ft averaging 618 ppm Li with a peak of 1,150 ppm Li; cesium and rubidium were also strongly anomalous across the program.
  • Results confirm a thick, laterally extensive lithium‑bearing claystone package over a 7 km × 3.5 km area, de‑risking the geological model and supporting plans for a resource‑oriented exploration phase.

Key Details

  • Drilling Program: Four vertical holes, max depth 500 ft (152 m), cased to 20 ft; sampling on 5‑ft intervals from 20–25 ft to total depth.
  • Lithium Intercepts:
  • Best interval – 155 ft averaging 618 ppm Li, with individual 5‑ft samples up to 1,150 ppm Li.
  • Lithium mineralization began at the 20‑to‑25‑ft interval in each hole; 89% of 352 samples were anomalous to strongly anomalous.
  • Critical Metals: Cesium (average 77 ppm) and rubidium (average 121 ppm) strongly anomalous in all holes; rare earths such as cerium also elevated.
  • Geological Confirmation: Thick claystone package beneath surface anomalies validates basin‑scale model; similar lithology to adjacent Surge Battery Metals’ Nevada North lithium resource.
  • Program Objectives Met:
  • Confirmed lithium‑bearing claystones to ≥500 ft over a 7 km × 3.5 km area.
  • Demonstrated presence of critical metals (Cs, Rb) alongside Li.
  • Provided initial stratigraphic orientation data for future drilling.
  • Next Steps:
  • Additional step‑out and tighter‑spacing drilling targeting higher‑grade zones.
  • Deeper drilling beyond 500 ft where feasible.
  • Detailed stratigraphic/structural modeling to locate potential high‑grade panels.
  • Expanded mineralogical & metallurgical testing on Li, Cs/Rb, zeolites, and silica sands.
  • Integrated geophysical, geochemical, and geological datasets for refined targeting across the 37 km² claim block.
  • QA/QC: Certified reference standards, blanks, and duplicates inserted in ~17.5% of samples; all chip samples shipped to ALS Minerals (Elko, NV) on 23 Nov 2025 by Senior Geologist Dr. Richard C. Capps.
  • Qualified Person: Dr. Richard C. Capps, PhD, senior geologist and director, NI 43‑101 qualified.

Notable Quotes

  • “These results provide first‑pass confirmation that the NELP basin hosts a significant lithium and critical mineral bearing volcano‑sedimentary system, warranting further systematic exploration drilling and technical evaluation.” – Edward (Ted) Ellwood, President & CEO.
Read the original news release →

More from Peloton Minerals Corporation