Northwire Canada EditionWednesday, August 5, 2026
Northwire
LTH 0.470 −7.8% APN 0.020 +0.0% ARTG 35.10 +4.3% STND 0.075 −11.8% AAZ 0.040 +14.3% LIFT 3.33 +0.6% LIB 0.810 +1.2% PEMC 0.050 +11.1% ELE 23.49 +7.5% AMCO 0.210 +2.4% TGOL 0.115 +9.5% SSRM 37.45 +4.5% SALT 1.51 +9.4% MON 0.650 +12.1% AZS 0.610 +28.4% NIO 0.140 +7.7% LTH 0.470 −7.8% APN 0.020 +0.0% ARTG 35.10 +4.3% STND 0.075 −11.8% AAZ 0.040 +14.3% LIFT 3.33 +0.6% LIB 0.810 +1.2% PEMC 0.050 +11.1% ELE 23.49 +7.5% AMCO 0.210 +2.4% TGOL 0.115 +9.5% SSRM 37.45 +4.5% SALT 1.51 +9.4% MON 0.650 +12.1% AZS 0.610 +28.4% NIO 0.140 +7.7%
Drill Results

Pinnacle Interprets Multiple New Targets from LiDAR Survey at El Potrero

LiDAR Survey Unearths Dozens of New Targets at El Potrero as Pinnacle Eyes District-Scale Potential

Executive Summary

The news release dated January 6, 2026, details the results of an airborne LiDAR survey conducted over the El Potrero gold-silver project in Durango, Mexico. Key findings include: - Confirmation of a 1,600-meter known strike length for the Dos de Mayo vein system. - Identification of 64 adits, 6 shafts, and 51 prospecting pits across the property. - Discovery of new structures with artisanal workings, particularly in the northern "El Potrero" block. - Evidence of a buried hydrothermal system in the "Maria Fernanda 2" (MF2) block. - Management’s observation that exploration to date has only addressed approximately 10% of the property’s total area.

Material Impact

The impact of this news is Routine - Positive. While LiDAR data is a powerful exploration tool for "seeing through" vegetation and identifying historical workings, it does not provide grade or width data which are the ultimate drivers of valuation. - Scale Validation: The confirmation of 121 historical workings across the property suggests a much larger footprint than previously modeled, supporting the management’s "district-scale" narrative. - Target Generation: This provides a clear roadmap for the expanded geological team to prioritize surface sampling and future drill targets beyond the immediate mine areas. - De-risking: Identifying "flexures and fault offsets" via LiDAR allows for more precise drill collar placement, potentially reducing "wasted" drill meters in the upcoming program. - Context: This news follows the December 18, 2025, closing of a C$1.06M financing tranche, indicating the company has the immediate funds to begin following up on these targets.

PINN · Price
Company Overview

Pinnacle Silver and Gold Corp. is focused on the El Potrero Project in Durango, Mexico. - Project: El Potrero is a low-sulphidation epithermal gold-silver system. - Infrastructure: The project includes a 100 tpd processing plant (currently requiring refurbishment) and existing underground mine workings (Pinos Cuates, Dos de Mayo, and La Dura). - Strategy: The company is utilizing a staged earn-in approach to minimize dilution, aiming to reach production to fund further exploration.

Read the original news release →

More from Pinnacle Silver and Gold Corp.