Northwire Canada EditionSaturday, August 1, 2026
Northwire
S 0.140 +0.0% BNKR 4.40 −2.2% QRO 0.045 +0.0% VCT 0.075 +36.4% PPP 1.15 +0.9% LMG 0.390 +0.0% GRDM 0.140 +0.0% ABRA 13.58 −4.1% WHY 0.295 +1.7% HHH 3.94 −0.2% COS 0.060 +0.0% NOB 0.065 −23.5% MEK 0.055 +0.0% TGOL 0.105 −4.5% FCI 0.400 −7.0% SGQ 0.350 +0.0% S 0.140 +0.0% BNKR 4.40 −2.2% QRO 0.045 +0.0% VCT 0.075 +36.4% PPP 1.15 +0.9% LMG 0.390 +0.0% GRDM 0.140 +0.0% ABRA 13.58 −4.1% WHY 0.295 +1.7% HHH 3.94 −0.2% COS 0.060 +0.0% NOB 0.065 −23.5% MEK 0.055 +0.0% TGOL 0.105 −4.5% FCI 0.400 −7.0% SGQ 0.350 +0.0%
Drill Results

Military Metals Drills 23.5 Meters of 3.3 g/t Gold Including 4.0 Meters of 10.52 g/t Gold and 1.9 Meters of 2.53% Antimony at Flagship Trojarova Project, Europe

MILI · Price

Executive Summary

  • Military Metals Corp. released analytical results from hole 25‑TVA‑003 of its 2025 definition drilling program at the Trojárová Antimony‑Gold Project in Slovakia.
  • The drill intercept includes a notable gold zone: 23.5 m @ 3.3 g/t Au (true width 20.2 m) and a higher‑grade sub‑interval of 4.0 m @ 10.52 g/t Au (true width 3.4 m).
  • An antimony intercept of 1.9 m @ 2.53 % Sb (true width 1.6 m) was also intersected, reinforcing the project's historic resource potential.

Key Details

  • Hole 25‑TVA‑003 results:
  • 23.5 m of 3.3 g/t Au over a true width of 20.2 m (148.9 – 172.4 m).
  • Within that, 4.0 m of 10.52 g/t Au over a true width of 3.4 m (157.9 – 161.9 m).
  • 1.9 m of 2.53 % Sb over a true width of 1.6 m (169.9 – 171.8 m).

  • Additional assay highlights from the same hole:

  • Multiple sub‑intervals with Au grades ≥ 1 g/t, e.g., 3.74 g/t Au over 1 m at 151.9 – 152.9 m; 4.5 g/t Au over 1 m at 152.9 – 153.9 m; 10.52 g/t Au over 3.0 m (157.9 – 160.9 m).

  • Core handling & QA/QC:

  • PQ and HQ sized core, split halves retained in‑core box and sent to ALS Laboratories (Romania) for analysis.
  • Analyses performed using ME_ICP41a (multi‑element) and Au‑AA25 fire assay methods; systematic insertion of CRMs, blanks (1 in 10), and duplicates (1 in 30).

  • Logistics:

  • Logging and sampling of all drill core from the 2025 program are complete; samples have been shipped to ALS Laboratories.
  • Additional results for remaining holes pending release.

  • Drillhole collar data (selected):

  • 25‑TVA‑001: Easting 662,696 m, Northing 5,358,601 m, Elev 640 m, Length 292.2 m, Dip –65°, Azimuth 220°.
  • 25‑TVA‑003 (focus hole): Easting 662,551 m, Northing 5,358,701 m, Elev 634 m, Length 200.2 m, Dip –65°, Azimuth 225°.

  • Historical context:

  • Historical resource (1992) estimated 2.46 Mt @ 2.47 % Sb and 0.635 g/t Au (cut‑off 1 % Sb), equating to ~60,000 t in‑situ antimony.
  • Company plans to deliver a current mineral resource estimate by end of Q1 2026, using the new drilling data as input.

  • Management comment:

  • CEO Scott Eldridge highlighted “higher than anticipated gold grades” and emphasized the project’s strategic importance for EU critical‑minerals supply.

Notable Quotes

“We are thrilled with the second tranche of assays… higher than anticipated gold grades within the Trojárová Deposit… these results strengthen the project's potential importance to, and alignment with, the EU's objective of building a dependable, home‑grown supply of essential raw materials.” – Scott Eldridge, CEO


All technical information reviewed and approved by David Murray, P.Geo., VP‑Exploration (qualified person per NI 43‑101).

Read the original news release →

More from Military Metals Corp.