Northwire Canada EditionWednesday, July 29, 2026
Northwire
ZAC 0.060 +0.0% ELE 21.18 −1.7% GHRT 0.750 +0.0% AEM 203.13 +0.1% JTWO 0.135 +0.0% EDR 10.63 −2.8% VMXX 0.750 +5.6% K 32.71 −1.5% AGI 40.13 −1.4% VGZ 2.40 +0.8% CAN 0.055 +0.0% NVO 0.055 +0.0% ARIS 19.57 −4.2% IVN 10.59 −0.8% MCI 0.165 +0.0% MTS 0.130 +0.0% ZAC 0.060 +0.0% ELE 21.18 −1.7% GHRT 0.750 +0.0% AEM 203.13 +0.1% JTWO 0.135 +0.0% EDR 10.63 −2.8% VMXX 0.750 +5.6% K 32.71 −1.5% AGI 40.13 −1.4% VGZ 2.40 +0.8% CAN 0.055 +0.0% NVO 0.055 +0.0% ARIS 19.57 −4.2% IVN 10.59 −0.8% MCI 0.165 +0.0% MTS 0.130 +0.0%
M&A / Property

Xali Gold nears closing of Pico Machay deal

XGC · Price

Executive Summary

  • Xali Gold Corp. announces that the TSX Venture Exchange (TSX-V) has approved the amended technical report for the acquisition of the Pico Machay gold deposit in Peru.
  • The closing of the Pico Machay acquisition and the first tranche of a previously announced non-brokered private placement are expected to occur simultaneously by the end of the week, subject to final TSX-V acceptance.
  • The amended technical report, prepared by DKT Geosolutions Inc., incorporates minor modifications to comply with TSX-V comments, including updates to section headings, reduced disclosure on adjacent properties, and clarification of the phased work program.

Key Details

  • Transaction Status: The TSX-V has addressed all outstanding technical and legal aspects regarding the acquisition of the Pico Machay gold deposit.
  • Closing Timeline: Both the Pico Machay acquisition and Tranche 1 of the non-brokered private placement are expected to close by the end of the week (relative to the release date).
  • Technical Report Approval: An amended National Instrument 43-101 compliant technical report was filed on SEDAR+ with an effective date of Nov. 18, 2025, and dated Dec. 16, 2025.
  • Technical Report Amendments:
    • Updated section headings (e.g., "Executive Summary" changed to "Summary").
    • Reduced disclosure regarding adjacent properties.
    • Deleted historical mineral resource estimates from the main estimates section, retaining them only in the summary and history sections.
    • Clarified Section 18.0 recommendations: Phase 2 work is not contingent on Phase 1 results, as it is supported by existing historical data.
  • Technical Report Author: David Thomas, PGeo, of DKT Geosolutions Inc.
  • Project Details (Pico Machay):
    • Located in the Huancavelica province, Peru, within the Southern Peru epithermal gold-silver belt.
    • Advanced exploration-stage project with near-term production opportunity.
    • Previous engineering studies (2005–2009) by Aquiline targeted an open pit heap-leach operation with low cost and low strip ratio.
    • Previous studies were based on a long-term gold price of $700/ounce; Xali Gold cites excellent upside potential due to untested exploration targets.
  • Company Profile: Xali Gold is a gold and silver exploration company focused on projects in the Americas, including the El Oro project in Mexico.

Notable Quotes

  • "The company understands that all outstanding technical and legal aspects have been addressed to the satisfaction of the TSX-V."
  • "Xali Gold believes there is excellent upside potential."
Read the original news release →

More from Xali Gold Corp.