Northwire Canada EditionSaturday, November 14, 2026
Northwire
⌕
Gold 3,886.30 +0.0% Silver 49.12 −1.9% Copper 6.09 −1.7% Oil 88.56 −0.2% Palladium 1,007.60 +1.6% PPTA 25.29 −0.6% AIR 0.050 −9.1% PMX 0.055 +0.0% CCMC 0.340 +0.0% PPM 0.095 +0.0% BMR 0.165 +0.0% S 0.175 +0.0% STGO 1.37 −2.8% GRDM 0.180 +0.0% CRI 0.015 +0.0% CN 0.120 +0.0% BTT 0.100 −13.0% AUXX 5.07 −2.9% CLV 0.120 + VUL 0.360 −5.3% LUNR 15.66 −3.1% Gold 3,886.30 +0.0% Silver 49.12 −1.9% Copper 6.09 −1.7% Oil 88.56 −0.2% Palladium 1,007.60 +1.6% PPTA 25.29 −0.6% AIR 0.050 −9.1% PMX 0.055 +0.0% CCMC 0.340 +0.0% PPM 0.095 +0.0% BMR 0.165 +0.0% S 0.175 +0.0% STGO 1.37 −2.8% GRDM 0.180 +0.0% CRI 0.015 +0.0% CN 0.120 +0.0% BTT 0.100 −13.0% AUXX 5.07 −2.9% CLV 0.120 + VUL 0.360 −5.3% LUNR 15.66 −3.1%
Production / Operations

West Red Lake Gold takes delivery of three scoops in Q4

WRLG · Price

Executive Summary

  • West Red Lake Gold Mines provided a mid-Q4 update on the ramp-up activities at its Madsen mine, highlighting a 24% month-over-month increase in mined ore production in October.
  • The company is targeting full-scale commercial production early in 2026, with daily tonnage tracking toward commercial levels for Q1.
  • Significant progress was made in equipment delivery and site management, including the arrival of rolling stock, a new maintenance shop, and key leadership hires to strengthen operational oversight.

Key Details

  • Production Metrics: Mined ore production increased by 24% in October compared to September. This increase is attributed to enhanced ore trucking capacity after eliminating the need to transport waste rock to surface, which freed up significant trucking capacity.
  • Production Targets: The mine is on track to reach commercial production levels early in Q1 2026.
  • Equipment and Infrastructure:
    • Delivery of three 4-yard scoops was completed in the first half of Q4.
    • The final 42-tonne haul truck is expected in the coming weeks.
    • Components for a new maintenance shop arrived on site to enhance mobile fleet maintenance capabilities.
  • Management Changes:
    • Sean McCormack joined as Mine General Manager in Q2, previously serving as GM of the Kiena mine at Wesdome Mines and Holt complex at Kirkland Lake Gold.
    • Bright Asamoah joined as Chief Engineer, bringing 13 years of experience from Newmont Gold (including roles at Ahafo, Porcupine, Hoyle Pond, and Borden mines).
    • James Armstrong joined as Mill Manager, with 30 years of experience, previously serving as Mill Manager at Nyrstar’s Middle Tennessee mines.
    • William Curry joined as Senior Operations Manager, previously GM of Talisker Resources' Bralorne mine and VP at Sinomine Resources’ Tanco mine.
  • Strategic Focus: The ramp-up phase has moved from bulk sampling into full ramp-up, with a focus on getting the shaft operational and completing the final equipment list.

Notable Quotes

  • "We have worked diligently through the stages and challenges of mine ramp-up, always focused on getting the Madsen mine into full-scale operations early in 2026, and we are now in sight of that goal," said Shane Williams, president and chief executive officer.
  • "The complexity of mining means it takes strong, experienced leadership to perform in the moment while simultaneously setting up to maximize medium- and long-term opportunities," said Hayley Halsall-Whitney, vice-president, operations.
Read the original news release →

More from West Red Lake Gold Mines Ltd.