Northwire Canada EditionSaturday, August 22, 2026
Northwire
RCK 0.720 +2.9% SGML 16.03 +8.1% BKM 2.80 +0.0% CGNT 1.25 +2.5% TTS 2.10 −17.6% SVRS 0.500 +0.0% FMM 0.050 +0.0% GSPR 0.105 −4.5% MKO 14.50 +0.2% EVER 0.510 −1.9% HSTR 2.32 +0.0% MERG 0.880 +4.8% THM 1.20 −0.8% MON 0.660 +3.1% ELEF 0.145 +7.4% FAIR 0.065 +8.3% RCK 0.720 +2.9% SGML 16.03 +8.1% BKM 2.80 +0.0% CGNT 1.25 +2.5% TTS 2.10 −17.6% SVRS 0.500 +0.0% FMM 0.050 +0.0% GSPR 0.105 −4.5% MKO 14.50 +0.2% EVER 0.510 −1.9% HSTR 2.32 +0.0% MERG 0.880 +4.8% THM 1.20 −0.8% MON 0.660 +3.1% ELEF 0.145 +7.4% FAIR 0.065 +8.3%
Technical Study

Lucara files NI 43-101 report for Karowe

LUC · Price

Executive Summary

  • Lucara Diamond Corp. has filed an updated technical report for the Karowe underground project, prepared in accordance with National Instrument 43-101.
  • The report is titled "Karowe Diamond Mine 2025 Feasibility Study Technical Report" with an effective date of September 30, 2025.
  • The study was prepared by JDS Energy & Mining Inc. and is available on SEDAR+ and the company's website.

Key Details

  • Report Title: Karowe Diamond Mine 2025 Feasibility Study Technical Report
  • Effective Date: September 30, 2025
  • Prepared By: JDS Energy & Mining Inc.
  • Regulatory Standard: National Instrument 43-101 (Standards of Disclosure for Mineral Projects)
  • Project Location: Karowe diamond mine, Botswana
  • Availability: Filed under the company's profile on SEDAR+ and on the company's website
Read the original news release →

More from Lucara Diamond Corp.