M&A / Property
Azimut, SOQUEM to sell 75% of Galinee to Li-FT

LIFT · Price
Executive Summary
- Azimut Exploration Inc. and SOQUEM Inc. have signed a non-binding letter of intent (LOI) to restructure their 50/50 joint venture on the Galinee property by selling a combined 75% interest to Li-FT Power Ltd.
- The transaction consolidates the Galinee and Adina lithium districts, aligning with Azimut’s strategy to focus on flagship assets while retaining equity exposure and royalties in emerging lithium projects.
- Li-FT is simultaneously acquiring Winsome Resources Ltd. (owner of the adjacent Adina property) to complete the district consolidation.
Key Details
- Transaction Structure: Li-FT Power Ltd. will acquire a 50% interest in the Galinee property from Azimut and a 25% interest from SOQUEM.
- Consideration: Li-FT will issue 2 million shares to Azimut and 1 million shares to SOQUEM as consideration for the acquired interests.
- Retained Interests:
- Azimut retains a 1.4% NSR (Net Smelter Return) royalty on the Galinee property.
- SOQUEM retains a 25% undivided interest in the property via a new joint venture with Li-FT.
- Deferred Payment: Azimut is entitled to a $1.5 million deferred payment, payable in cash or shares (subject to definitive agreement conditions), at the earlier of:
- Completion of a preliminary economic study on the property; or
- 18 months from the date of the LOI.
- Strategic Context: The deal consolidates the Galinee-Adina lithium district in the James Bay region of Quebec, removing boundary constraints for Li-FT. This is disclosed in conjunction with Li-FT’s Dec. 15, 2025 announcement of its proposed acquisition of Winsome Resources Ltd.
- Property Details (Galinee):
- Located in the Eeyou Istchee James Bay region of Quebec.
- 649 claims covering 335 square kilometres.
- Located ~50 km north-northwest of the Renard diamond mine and ~60 km south of the Trans-Taiga Road.
- Operated by Azimut.
- Drilling Results (Galinee): Wide core drilling intervals of high-grade mineralization intercepted in the northern part of the property, including:
- 1.62% Li2O over 158.0 metres.
- 2.48% Li2O over 72.7 metres.
- 2.68% Li2O over 54.6 metres.
- Regulatory/Conditions: The LOI is non-binding. Closing is subject to customary conditions, including approval from the TSX-V and execution of definitive agreements.
Notable Quotes
- Dr. Jean-Marc Lulin (President and CEO, Azimut): "The consolidation of this district would allow Li-FT to advance a strengthened property package unconstrained by the Galinee-Adina boundary. The proposed transaction aligns with Azimut's objective to focus on its flagship assets while maintaining exposure to emerging lithium districts through equity ownerships and retained royalties."
More from Li-FT Power Ltd.
Jul 17, 2026 · 03:05