AVX 0.005 −nan% AII 19.91 −1.0% GWM 0.480 +0.0% GEN 0.065 +0.0% NIO 0.135 −3.6% III 7.22 −2.8% NCAU 0.295 −3.3% NEV 0.040 +0.0% ITR 3.00 −1.6% ALDE 2.79 −0.7% TECK 84.18 +4.4% FVI 11.83 −2.2% SUM 1.31 −1.5% RSMX 0.115 +4.5% STW 0.105 +5.0% PAT 0.250 +0.0% AVX 0.005 −nan% AII 19.91 −1.0% GWM 0.480 +0.0% GEN 0.065 +0.0% NIO 0.135 −3.6% III 7.22 −2.8% NCAU 0.295 −3.3% NEV 0.040 +0.0% ITR 3.00 −1.6% ALDE 2.79 −0.7% TECK 84.18 +4.4% FVI 11.83 −2.2% SUM 1.31 −1.5% RSMX 0.115 +4.5% STW 0.105 +5.0% PAT 0.250 +0.0%
Production / Operations

Aya Gold produces 1.37 million oz Ag at Zgounder in Q4

AYA · Price

Executive Summary

  • Aya Gold & Silver reported record Q4 and full-year 2025 silver production at its Zgounder mine in Morocco, driven by significant improvements in mill throughput, head grades, and recovery rates.
  • The company initiated commercialization of a historical pyrite stockpile at Boumadine, adding 172,129 oz of silver equivalent to its 2025 output.
  • Management confirmed the completion of mine ramp-ups, unveiled a new mine plan optimized for current silver prices, and outlined a strategic focus on operational discipline and continuous optimization for 2026.

Key Details

  • Q4 2025 Silver Production: 1.37 million ounces (up 2% from Q3 2025)
  • December 2025 Production: Record 545,491 ounces at a mill feed grade of 147 g/t Ag
  • Q4 Mill Throughput: Averaged 3,796 tpd, a 14% improvement over Q3 and 41% above nameplate capacity
  • December Mill Rate: Record 4,107 tpd
  • Q4 Head Grade: Average 134 g/t Ag
  • Recovery & Availability: Sustained silver recovery averaged 91.2%; mill availability maintained at 99.0%
  • Q4 Mining Rates: Underground at 1,387 tpd (161 g/t Ag); Open pit at 2,800 tpd (115 g/t Ag); Total mining rate 4,187 tpd (130 g/t Ag)
  • December Mining Rate: Record 4,652 tpd
  • Open-Pit Operations: Reached 2,800 tpd at a strip ratio of 13; total material movement rate of 38,814 tpd (approaching long-term target of 45,000 tpd)
  • Stockpiled Ore: Over 194,000 tonnes available to support continued high throughput
  • Process Optimizations: Implemented blast movement control and bench-by-bench modeling in H2 2025; enhanced blending, circuit optimization, and increased tailings pumping capacity to sustain higher milling rates
  • Boumadine Pyrite Stockpile (2025): 13,498 tonnes reclaimed and crushed at 192 g/t Ag and 2.87 g/t Au
  • Boumadine Production (2025): 1,245 oz Au and 83,480 oz Ag, totaling 172,129 oz AgEq
  • Full Year 2025 Corporate Production: Zgounder produced 4,829,151 oz Ag; Boumadine contributed 172,129 oz AgEq; Total corporate AgEq production reached 5,001,280 oz
  • Strategic Planning: Published a new mine plan aligned with the current silver price environment to maximize cash flow; 2025 ramp-up phase complete

Notable Quotes

  • "Zgounder delivered another strong quarter, with solid Q4 production, recoveries, mining rate and throughput... We also published a new mine plan aligned with the current silver price environment, positioning Zgounder to maximize cash flow. With the 2025 ramp-up complete, our focus now shifts to disciplined execution, continuous optimization, and consistent delivery into 2026 and beyond." — Benoit La Salle, President and Chief Executive Officer
Read the original news release →