- Tidewater Renewables completed a seven‑day planned outage at its renewable diesel and hydrogen complex in Prince George, BC, reinstalling a rebuilt component.
- Utilization has returned to full capacity of 3,000 barrels per day after the outage, up from an interim average of ~2,250 bbl/d during temporary repairs.
- The outage follows a short unplanned shutdown (Oct 15‑29, 2025) caused by an equipment anomaly that was temporarily repaired pending component rebuild.
Key Details
- Planned Outage Duration: 7 days (Dec 6 – Dec 12, 2025).
- Complex Affected: Renewable Diesel & Renewable Hydrogen Complex (“HDRD Complex”) in Prince George, BC.
- Component Work: Faulty component removed, rebuilt off‑site, and safely reinstalled during the outage.
- Utilization Pre‑Outage: Approx. 2,250 barrels per day (Nov 1 – Dec 5, 2025) with temporary repair in place.
- Post‑Outage Utilization: Returned to full design capacity of 3,000 barrels per day as of Dec 12, 2025.
- Previous Unplanned Outage: Oct 15 – Oct 29, 2025 due to equipment anomaly; temporary repair allowed limited production.