Northwire Canada EditionSaturday, July 25, 2026
Northwire
B 0.150 +0.0% IFOS 2.28 −2.6% IMM 0.060 +0.0% ROCK 3.38 −1.7% NVX 0.250 −7.4% HAR 0.050 +0.0% YGT 0.175 +0.0% GEN 0.070 −nan% CRB 0.040 +14.3% MSA 7.07 +2.2% AEM 204.81 +0.7% OPW 0.105 +5.0% GRL 0.275 −1.8% AIS 0.150 +0.0% CUU 0.580 −1.7% SOMA 0.720 +5.9% B 0.150 +0.0% IFOS 2.28 −2.6% IMM 0.060 +0.0% ROCK 3.38 −1.7% NVX 0.250 −7.4% HAR 0.050 +0.0% YGT 0.175 +0.0% GEN 0.070 −nan% CRB 0.040 +14.3% MSA 7.07 +2.2% AEM 204.81 +0.7% OPW 0.105 +5.0% GRL 0.275 −1.8% AIS 0.150 +0.0% CUU 0.580 −1.7% SOMA 0.720 +5.9%
Drill Results Neutral

Imperial Provides Update on Mount Polley 2025 Production and Exploration

III · Price

Executive Summary

  • 2025 Mount Polley production delivered 30.715 M lb Cu (above the 25‑27 M lb target) and 37,555 oz Au (within the 35‑40 k oz target).
  • Production volumes were flat year‑over‑year in ore milled but copper grades and recoveries fell, resulting in a 14% decline in Cu pounds and a 4% decline in Au ounces versus 2024.
  • Extensive 2025 Phase 2 drilling at Mount Polley returned multiple near‑surface and deep intercepts of significant copper–gold mineralization, supporting the 2026 production outlook of 19‑21 M lb Cu and 40‑44 k oz Au.

Key Details

  • 2025 Production – Mount Polley
  • Ore milled: 6,714,195 t (flat vs. 2024)
  • Copper produced: 30.715 M lb (down 14% YoY)
  • Gold produced: 37,555 oz (down 4% YoY)
  • Q4 mill feed sourced ~50 % from Phase 5 & low‑grade stockpiles; lower grades and Cu recovery (75.5 %) drove reduced output.
  • 2026 Production Target
  • Copper: 19‑21 M lb
  • Gold: 40‑44 k oz
  • Majority of mill feed to come from Phase 5 pushback, supplemented by low‑grade stockpiles.

  • Exploration – Phase 2 (C2 Zone)

  • Hole C2‑25‑123: 82.5 m @ 0.45 % Cu & 0.88 g/t Au (30 m depth); includes 47.5 m @ 0.56 % Cu & 1.22 g/t Au (57.5 m depth).
  • Hole C2‑25‑142: 44 m @ 0.42 % Cu & 0.39 g/t Au (6 m depth) plus 140 m @ 0.19 % Cu & 0.30 g/t Au (250 m depth).
  • Hole C2‑25‑138: 77.5 m @ 0.49 % Cu & 0.82 g/t Au; includes 45 m @ 0.72 % Cu & 1.10 g/t Au.

  • Deep C2 Zone Intercepts

  • Hole C2‑25‑126: 20 m @ 0.29 % Cu & 0.44 g/t Au (292.5‑312.5 m).
  • Hole C2‑25‑138 (deep interval): 45 m @ 0.72 % Cu & 1.10 g/t Au (277.5‑322.5 m).
  • Hole C2‑25‑140: 7.5 m @ 0.40 % Cu & 1.29 g/t Au (222.5‑230 m); 5 m @ 0.49 % Cu & 1.01 g/t Au (255‑260 m).

  • Bell Pit Extension Drilling

  • Hole BD‑25‑36: 55 m @ 0.33 % Cu & 0.41 g/t Au; includes 17.5 m @ 0.69 % Cu & 0.75 g/t Au.
  • Hole BD‑25‑37: 235 m @ 0.22 % Cu & 0.27 g/t Au (62.5‑297.5 m); includes 45 m @ 0.35 % Cu & 0.51 g/t Au (250‑295 m).

  • Future Drilling

  • Next diamond‑drilling phase scheduled to commence February 2026, focusing on follow‑up of successful Bell Pit results.

  • Qualified Persons

  • Steve Robertson, VP Corporate Development – production disclosures.
  • Jim Miller‑Tait, VP Exploration – exploration results.

Notable Quotes

  • “The 2025 production exceeded our copper target and met gold expectations, underscoring the resilience of Mount Polley’s operation despite lower grades,” – Imperial Metals President Brian Kynoch.

Materiality Assessment: Material – Positive (the release provides substantive operational and exploration data that materially informs investors about current performance and future outlook).

Read the original news release →

More from Imperial Metals Corporation