Northwire Canada EditionSunday, November 29, 2026
Northwire
⌕
Gold 3,668.50 +3.8% Silver 43.70 +9.1% Copper 5.52 +3.4% Oil 83.33 −0.4% Palladium 879.00 +5.5% MUN 0.285 +11.8% RNCH 0.030 +0.0% GSKR 2.30 +8.0% ADY 0.370 +5.7% TSK 0.640 +1.6% BAY 0.055 +22.2% CGNT 0.670 −2.9% INFI 0.190 +0.0% GSS 0.045 +50.0% HAY 0.040 +0.0% WRLG 0.430 +1.2% MPVD 0.015 + GGO 0.980 +5.4% NAU 0.530 +6.0% COCO 0.260 +8.3% TBLL 0.045 +12.5% Gold 3,668.50 +3.8% Silver 43.70 +9.1% Copper 5.52 +3.4% Oil 83.33 −0.4% Palladium 879.00 +5.5% MUN 0.285 +11.8% RNCH 0.030 +0.0% GSKR 2.30 +8.0% ADY 0.370 +5.7% TSK 0.640 +1.6% BAY 0.055 +22.2% CGNT 0.670 −2.9% INFI 0.190 +0.0% GSS 0.045 +50.0% HAY 0.040 +0.0% WRLG 0.430 +1.2% MPVD 0.015 + GGO 0.980 +5.4% NAU 0.530 +6.0% COCO 0.260 +8.3% TBLL 0.045 +12.5%
Drill Results Material +

Ivanhoe Electric Discovers Breccia- and Carbonate-Hosted Copper-Gold-Silver Mineralization at Its Gleeson Project in Southeastern Arizona

Ivanhoe Electric’s first Gleeson holes intersected 2.0m at 0.6% CuEq in a new Arizona copper-gold system.

Executive Summary

Ivanhoe Electric Inc. has released the initial drill results from its Gleeson copper-gold-silver project, located on private land in Arizona approximately 28 miles north of the historic Bisbee district. The company identified two mineralized domains situated below low-angle faulting: an upper breccia domain beginning at approximately 600 meters depth and a deeper intrusive, skarn, and carbonate-replacement domain starting at roughly 1,000 meters depth.

The reported intervals include: - CGD26-TR-003: 123.60 m from 601.70 m at 0.91% Cu, 0.44 g/t Au and 5.27 g/t Ag, including 71.03 m from 640.32 m at 1.38% Cu, 0.52 g/t Au and 6.73 g/t Ag. - CGD26-TR-008: 381.66 m from 587.85 m at 0.34% Cu, 0.29 g/t Au and 1.07 g/t Ag, including 16.20 m at 1.04% Cu, 0.27 g/t Au and 1.38 g/t Ag, and 41.51 m at 0.38% Cu, 1.23 g/t Au and 1.78 g/t Ag. - CGD25-TR-001: 385.34 m from 1,058.58 m at 0.33% Cu, 0.22 g/t Au and 6.29 g/t Ag, including 19.15 m at 1.16% Cu, 0.38 g/t Au and 16.82 g/t Ag, and 44.54 m at 0.69% Cu, 0.82 g/t Au and 17.77 g/t Ag. - CGD26-TR-006: 275.83 m from 558.39 m at 0.26% Cu, 0.17 g/t Au and 1.81 g/t Ag, including 43.51 m at 0.41% Cu, 0.42 g/t Au and 3.54 g/t Ag. - CGD26-TR-002: 20.61 m at 0.76% Cu, 0.52 g/t Au and 5.78 g/t Ag, and 11.49 m at 1.17% Cu, 0.40 g/t Au and 14.62 g/t Ag. - CGD26-TR-003 also reports a 2.99 m geological-context interval from 1,441.81 m at 0.16% Cu, 3.93 g/t Au and 105.83 g/t Ag, plus zinc and lead not included in CuEq.

Assay status remains partial, with complete results available for seven holes, partial assays for two, and four holes pending. Ivanhoe Electric plans to complete 16,000 meters of drilling by the end of 2026 using two active rigs. All reported intervals represent downhole lengths, and true widths are currently unknown.

Material Impact

Ivanhoe Electric Inc. (IE) has announced a new discovery at a project previously excluded from the company’s public net asset value narrative, adding a second Arizona copper-gold system to its portfolio centered on the Santa Cruz copper project. The release does not alter Santa Cruz reserves, the 2026 Preliminary Feasibility Study, the EXIM financing process, or near-term cash flow. Consequently, the materiality of the announcement relates to perceived scale and exploration optionality rather than current production or reserves.

The stock closed at US$8.55 on 2026-11-18, at the low end of the provided 52-week range and significantly below the US$27.15 high recorded in January 2026. There is no prior Gleeson assay result embedded in the share price, and the market has not re-rated on this target.

The results include two large mineralized domains, a 123.6 m high-grade copper-gold interval, and a 381.66 m bulk envelope. A second deeper carbonate-replacement target is also present, with assays pending. The discovery is not yet a resource, mine plan, or reserve, and true widths and metallurgy remain unknown.

IE · Price
Company Overview

Ivanhoe Electric Inc. is a US-domiciled minerals exploration and development company focused on copper and critical metals. Its flagship advanced asset is the Santa Cruz copper project in Arizona. The company also controls the Gleeson copper-gold project, the Hog Heaven project, and other US exploration assets. Ivanhoe Electric holds joint ventures or alliances with Maaden in Saudi Arabia, BHP in the United States, and SQM in Chile. Additionally, the company owns 94.3% of Computational Geosciences Inc. and utilizes the Typhoon geophysical system.

The Santa Cruz project’s 2026 Preliminary Feasibility Study (PFS) outlined probable reserves of 140.1 Mt at 1.08% Cu, containing 1.519 Mt Cu. The study projected a 24-year mine life, with approximately 75,000 t/y of copper production over the first 15 years. Initial capital was estimated at US$1.43B, with C1 cash costs of US$1.47/lb and AISC of US$2.28/lb. First copper cathode production was targeted for 2029. At a copper price of US$4.75/lb, the after-tax NPV8% was US$1.5B with an IRR of 19%; at US$6.79/lb copper, the NPV8% was US$3.5B and the IRR was 30%.

According to Q3 2026 filings, the company held cash of US$214.8M, total debt of US$35.9M, total equity of US$501.4M, and a book value of about US$3.14 per share. Ivanhoe Electric also maintains a US$200M undrawn bridge facility. A US$1.1B US EXIM preliminary project letter is not a binding financing commitment, with final Board consideration expected in spring 2027.

The Gleeson project is located entirely on private land, comprising about 19,606 acres of mineral rights and 2,033 acres of private surface rights. It is an early-stage exploration asset. There is no resource estimate, reserve, metallurgy, or economic study for Gleeson in the provided materials.

Read the original news release →

More from Ivanhoe Electric Inc.