Northwire Canada EditionSunday, July 12, 2026
Northwire
GLDN 0.055 +0.0% BRON 0.040 +0.0% BTO 5.43 −0.7% ESK 0.365 −2.7% AUMN 0.275 +0.0% GGX 0.040 +0.0% S 0.155 +29.2% NNX 0.035 +0.0% ABX 51.90 −0.6% TTS 2.40 −4.0% FCI 0.400 −9.1% GR 0.075 +0.0% AII 23.38 +12.4% TUNG 1.72 +1.8% LGO 1.01 −2.9% EMM 0.080 +0.0% GLDN 0.055 +0.0% BRON 0.040 +0.0% BTO 5.43 −0.7% ESK 0.365 −2.7% AUMN 0.275 +0.0% GGX 0.040 +0.0% S 0.155 +29.2% NNX 0.035 +0.0% ABX 51.90 −0.6% TTS 2.40 −4.0% FCI 0.400 −9.1% GR 0.075 +0.0% AII 23.38 +12.4% TUNG 1.72 +1.8% LGO 1.01 −2.9% EMM 0.080 +0.0%
Production / Operations

Reeflex Solutions Inc. Awarded $3.4 Million Contract to Supply Fully Customized Mast-Style Coiled Tubing Rig to Iron Horse Energy Services

TCW · Price

Executive Summary

  • Reeflex Solutions’ subsidiary Coil Solutions Inc. (via Ranglar Manufacturing) secured a $3.4 million contract to design and build a custom mast‑style coiled tubing rig for Iron Horse Energy Services.
  • The rig will be engineered for larger‑diameter tubing, extended‑reach wells, high pull loads, cold‑weather performance, and enhanced operator safety.
  • Engineering and fabrication start immediately with delivery targeted for Q3 2026.

Key Details

  • Contract Value: $3.4 million (award date: Dec 4 2025).
  • Customer: Iron Horse Energy Services – a wholly‑owned subsidiary of Trican Well Service Ltd. (TSX: TCW).
  • Scope: Design and manufacture of a fully customized mast‑style coiled tubing rig.
  • Technical Highlights:
  • Handles larger‑diameter tubing and extended‑reach wells.
  • Capable of high pull loads.
  • Enhanced cold‑weather performance.
  • Improved operator safety features.
  • Project Timeline: Engineering & fabrication begin immediately; delivery expected in Q3 2026.
  • Management Commentary: President & CEO John Babic highlighted the award as evidence of CSI’s growing engineering reputation and commitment to high‑performance equipment for a leading service provider.

Notable Quotes

“This contract award reflects the growing recognition of CSI’s engineering capabilities and our commitment to delivering high‑performance coiled tubing equipment,” – John Babic, President & CEO, Reeflex Solutions Inc.


Materiality Assessment: Material – Positive (significant new revenue contract with a strategic industry customer).

Read the original news release →

More from TRICAN WELL SERVICE LTD.