Northwire Canada EditionWednesday, November 4, 2026
Northwire
⌕
Gold 4,053.20 +2.9% Silver 52.06 +4.6% Copper 6.37 −0.6% Oil 92.99 −3.2% Palladium 989.00 +5.9% BONE 0.035 +0.0% VOXR 6.41 +0.0% HMR 0.530 +0.0% EU 0.940 +0.0% AEC 4.17 +0.0% CCO 101.73 +0.0% NOBL 0.075 +0.0% FOXT 0.110 +0.0% PEMC 0.040 +0.0% CGD 1.10 +0.0% TGOL 0.125 +0.0% SAGA 0.370 +0.0% GPAC 0.150 +0.0% NRN 0.040 +0.0% SCOT 2.08 +0.0% SKEL 0.100 +0.0% Gold 4,053.20 +2.9% Silver 52.06 +4.6% Copper 6.37 −0.6% Oil 92.99 −3.2% Palladium 989.00 +5.9% BONE 0.035 +0.0% VOXR 6.41 +0.0% HMR 0.530 +0.0% EU 0.940 +0.0% AEC 4.17 +0.0% CCO 101.73 +0.0% NOBL 0.075 +0.0% FOXT 0.110 +0.0% PEMC 0.040 +0.0% CGD 1.10 +0.0% TGOL 0.125 +0.0% SAGA 0.370 +0.0% GPAC 0.150 +0.0% NRN 0.040 +0.0% SCOT 2.08 +0.0% SKEL 0.100 +0.0%

← Back to our analysis

Original News Release Routine +

Aya Gold & Silver Drill Results Confirm High-Grade Continuity at Boumadine; New Permits Secured

MONTREAL, Nov. 04, 2026 (GLOBE NEWSWIRE) -- Aya Gold & Silver Inc. (TSX: AYA; NASDAQ: AYA) (“Aya” or the “Company”) is pleased to announce that it has secured additional permits adjacent to the Boumadine mining license, and to report new high-grade drill results at the Boumadine Project (“Boumadine” or the “Project”) from its ongoing infill drill program in the Kingdom of Morocco. These results confirm strong high-grade continuity along the Boumadine Main Trend and support the potential for continued resource growth and scale. Highlights Boumadine Main Trend (5.4km) Multiple additional high-grade intercepts1: BOU-DD26-1076 intercepted 269 grams per tonne (“g/t”) silver equivalent (“AgEq”) over 11.9 metres (“m”) (1.56 g/t gold (“Au”), 28 g/t silver (“Ag”), 3.3% zinc (“Zn”), and 1.3% lead (“Pb”), including 635 g/t AgEq over 2.6m (3.94 g/t Au, 65 g/t Ag, 6.6% Zn, and 2.7% Pb). BOU-DD26-1072 intercepted 239 g/t AgEq over 17.0 m (1.69 g/t Au, 36 g/t Ag, 1.7% Zn, and 0.3% Pb, including 953 g/t AgEq over 1.7m (7.94 g/t Au, 118 g/t Ag, 3.6% Zn, and 0.3% Pb). BOU-DD26-1078 intercepted 331 g/t AgEq over 9.1m (1.96 g/t Au, 31 g/t Ag, 4.5% Zn and 1.5% Pb). BOU-DD26-1071 intercepted 621 g/t AgEq over 3.7m (5.53 g/t Au, 68 g/t Ag, 1.7% Zn and 0.1% Pb), including 862 g/t AgEq over 2.4m (7.98 g/t Au, 72 g/t Ag, 2.5% Zn, and 0.1% Pb). BOU-DD26-1034 intercepted 442 g/t AgEq over 4.7m (3.2 g/t Au, 77 g/t Ag, 2.9% Zn, and 0.4% Pb) including 645 g/t AgEq over 2.6m (4.61 g/t Au, 108g/t Ag, 4.8% Zn and 0.5% Pb). Exploration Update: 181,685 m of drilling completed at Boumadine year-to-date, ahead of schedule. Achieved 51% of the 2-year infill program of 360,000 m, to be carried out over 2026 and 2027. Secured three additional exploration permits that fill gaps surrounding the Boumadine mining license. The new area of the Project is now 357 km2. “These drill results confirm the continuity, width and grade of the Boumadine Main Trend, and every round of drilling reinforces the scale of this system,” said Benoit La Salle, President & CEO. “With two months still left in the year, we have already completed our 2026 infill drilling objective, with more than 181,000 m drilled and 16 rigs turning. At the same time, three newly granted exploration permits close the gaps around the mining license and expand the Project area to 357 km². We are aggressively advancing the 2026–2027 program ahead of the feasibility study next year.” Table 1 – Significant Intercepts from Boumadine Drill Exploration Program (Core Lengths) DDH No. From To Au Ag Length1 Cu Pb Zn Mo Ag Eq2 (m) (m) (g/t) (g/t) (m) (%) (%) (%) (g/t) (g/t) BOU-DD26-1033  16.0   21.0   0.03   127   5.0   0.0   0.0   0.0   1   131  BOU-DD26-1033  173.6   177.2   1.23   34   3.6   0.1   0.4   1.8   43   197  BOU-DD26-1034  229.2   233.9   3.20   77   4.7   0.1   0.4   2.9   74   442  Including  230.4   233.0   4.61   108   2.6   0.2   0.5   4.8   63   645  BOU-DD26-1035  293.2   301.4   0.47   23   8.2   0.1   1.0   2.1   4   134  BOU-DD26-1036  332.9   336.7   2.12   16   3.8   0.0   0.1   0.0   3   211  BOU-DD26-1038  291.8   298.5   2.25   19   6.7   0.0   0.2   0.8   4   245  Including  291.8   294.2   4.71   27   2.4   0.0   0.1   0.7   2   468  BOU-DD26-1040  112.0   118.0   1.08   19   6.0   0.0   0.2   1.7   7   157  BOU-DD26-1041  169.6   174.2   0.81   28   4.6   0.2   0.2   1.1   10   144  BOU-DD26-1042  435.3   439.2   1.83   19   3.9   0.0   0.0   0.1   4   187  BOU-DD26-1043  205.0   210.6   1.70   25   5.6   0.0   0.5   2.5   7   239  Including  206.3   208.4   3.14   43   2.1   0.1   0.9   4.0   10   429  BOU-DD26-1049  224.7   227.6   1.50   21   2.9   0.0   2.1   0.6   15   209  BOU-DD26-1049  224.7   235.2   0.95   17   10.5   0.0   1.2   1.0   9   148  BOU-DD26-1052  262.8   268.5   1.99   21   5.7   0.0   0.3   0.4   5   216  Including  264.9   267.0   3.80   31   2.1   0.1   0.3   0.3   6   388  BOU-DD26-1053  34.4   38.9   0.84   113   4.5   0.0   1.4   2.6   6   269  BOU-DD26-1055  299.0   301.2   4.39   37   2.2   0.1   0.2   0.3   6   450  BOU-DD26-1057  131.0   144.2   0.79   10   13.2   0.0   0.0   0.2   2   87  BOU-DD26-1060  500.5   503.3   2.25   29   2.8   0.0   0.2   5.0   1   342  BOU-DD26-1061  175.0   178.8   1.55   23   3.8   0.0   0.1   0.4   5   174  BOU-DD26-1065  267.1   269.9   2.69   30   2.8   0.2   0.1   0.1   3   290  BOU-DD26-1065  282.1   290.4   1.83   32   8.3   0.1   0.1   0.1   3   205  Including  284.0   286.7   3.31   71   2.7   0.1   0.1   0.1   3   382  BOU-DD26-1069  53.6   55.0   1.79   69   1.4   0.0   4.2   7.2   31   458  BOU-DD26-1071  362.4   366.1   5.53   68   3.7   0.3   0.1   1.7   2   621  Including  362.4   364.8   7.98   72   2.4   0.3   0.1   2.5   1   862  BOU-DD26-1072  94.6   111.6   1.69   36   17.0   0.1   0.3   1.7   12   239  Including  104.5   106.2   7.94   118   1.7   0.6   0.3   3.6   12   953  BOU-DD26-1074  52.0   59.3   0.64   28   7.3   0.0   1.8   2.7   21   176  BOU-DD26-1076  146.5   158.4   1.56   28   11.9   0.1   1.3   3.3   15   269  Including  147.1   149.7   3.94   65   2.6   0.4   2.7   6.6   19   635  BOU-DD26-1077  54.9   59.1   1.10   26   4.2   0.0   0.3   0.7   44   145  BOU-DD26-1078  154.9   164.0   1.96   31   9.1   0.1   1.5   4.5   33   331  BOU-DD26-1078  174.2   177.2   1.85   22   3.0   0.1   0.2   1.4   10   225  True width remains undetermined at this stage; all values are uncut. Ag equivalent is based on a silver price of US$30/oz with a process recovery of 96%, a gold price of US$2,800/oz with a process recovery of 96%, a zinc price of US$1.20/lb with a process recovery of 75%, a lead price of US$1.00/lb with a process recovery of 82%, and a copper price of US$4.60/lb with a process recovery of 75% resulting in the following ratios: 1g/t Au: 89.7g/t Ag; 1% Cu: 78.6 g/t Ag; 1% Pb: 18.7 g/t Ag; and 1% Zn: 20.4 g/t Ag Figure 1: Boumadine Mining Licence Surface Plan with Magnetic Data (Residual Total Field) and 2026 Drill Holes 2026 Exploration Results This year, 524 diamond drill holes (“DDH”), and 15 reverse circulation drill holes (“RC”) totaling 181,685m have been completed at Boumadine (Figure 1 and Appendix 2). Drilling was executed on strike along the Main Trend, Tizi and Imariren. All results have been received for drill holes up to BOU-DD26-1080 (Table 1, Figure 3, Figure 4 and Appendix 1). Today’s results, including BOU-DD26-1072 and BOU-DD26-1076, confirm the high-grade nature and continuity of the Boumadine Main Trend, which remains open in all directions. With the addition of 3 new exploration permits, Boumadine now covers 357 km2 of highly prospective ground (Figure 2). These new permits secure a gap that was left around Boumadine mining license. Mineralization within the Boumadine Main Trend measures up to 4m wide (locally reaching over a 10m width) and is N340-oriented massive sulphide lenses/veins sharply dipping eastward (> 70°). The massive sulphide veins (>80%) are mainly composed of pyrite, with variable proportions of sphalerite, galena, and chalcopyrite. Tizi and Imariren share the same characteristics except for their N000 orientation. Figure 2 – Location of New Permits at Boumadine Figure 3 – Surface Plan of Boumadine North Zone with New DDH Results Figure 4 – Surface Plan of Boumadine South Zone with New DDH Results Next Steps Our 2026 exploration objectives included 180,000 m of infill drilling (half of the two-year, 360,000 m program), as well as 20,000 m of regional drilling targeting prospective areas, including follow-up work on the Asirem structures. Significant potential exists to expand the Boumadine Main Trend (currently 5.4 km), the Tizi Zone (2.0 km) and the Imariren Zone (1.2 km), with all three trends open in all directions. Follow-up drilling is also planned on the 8 km Asirem trend for later this year. Most drilling will continue to focus on the Main Trend, Imariren and Tizi to extend known mineralization along strike and at depth, while infilling key areas to advance the Project toward a feasibility study. For the remainder of 2026, the Company will prioritize infill drilling to accelerate feasibility study work. In 2027, infill drilling will continue to be prioritized to support the feasibility study. Once completed, drilling efforts will include follow-up work at Asirem and greenfield exploration, testing geological hypotheses and targets generated over the past four years. Ongoing geological work will guide additional development priorities. Technical Information Aya has implemented a quality control program to comply with best practices in sampling and analysis of drill core and RC chips. For core drilling, all individual samples represent approximately one metre in length of core, which is halved. Half of the core is kept on site for reference, and its counterpart is sent for preparation and assaying to African Laboratory for Mining and Environment (“Afrilab”) in Marrakech, Morocco. For drilling using RC, all individual samples represent 1.0m in length and a representative portion is kept for every metre in some chip trays stored on site. A split samples representing 1/16th, ranging from 2 to 4 kilogram is sent for preparation and assaying to African Laboratory for Mining and Environment (“Afrilab”) in Marrakech, Morocco. All samples are analyzed for silver, copper, iron, lead, zinc, tin, and molybdenum using Aqua regia and finished by atomic absorption spectroscopy (“AAS”). Samples grading above 200 g/t Ag are reanalyzed using fire assaying. Gold is assayed by fire assaying. Standards of different grades and blanks were inserted every 20 samples in addition to the standards, blanks and pulp duplicate inserted by Afrilab. Qualified Person The scientific and technical information contained in this press release have been reviewed by David Lalonde, B. Sc, P. Geo, Executive Vice-President Exploration, Qualified Person, for accuracy and compliance with National Instrument 43-101. About Aya Gold & Silver Inc. Aya Gold & Silver is a Canadian precious metals mining company anchored in Morocco and active across the full mining value chain. The Company has established an exploration track record through a systematic, technology-led, data-driven approach and is focused on expanding its resource base and land package along the Anti-Atlas fault — one of Africa’s most geologically rich, underexplored and mining-friendly regions. Aya operates Zgounder, a rare, silver-only mine, producing silver doré from its new processing facility. Aya’s growth pipeline includes the Boumadine polymetallic project, where feasibility study work is underway, and which hosts a sizable mineralized footprint, and potential for further discovery. Led by a proven team of mining professionals, Aya is guided by a vision of responsible mining and is committed to delivering sustainable value for shareholders, employees and host communities. For additional information, please visit Aya’s website at www.ayagoldsilver.com. Or contact Benoit La Salle, FCPA, MBA President & CEO [email protected] Alex Ball EVP, Capital Markets [email protected]     Forward-Looking Statements This press release contains “forward-looking statements” or “forward-looking information” within the meaning of applicable securities laws and other statements that are not historical facts. Forward-looking statements are included to provide information about management’s current expectations, estimates and projections regarding the Company's future growth and business prospects (including the timing and development of deposits and the success of exploration activities) and other opportunities as of the date of this press release. All statements, other than statements of historical fact included in this press release, regarding the Company’s strategy, future operations, technical assessments, prospects, plans and objectives of management are forward-looking statements that involve risks and uncertainties. Wherever possible, words such as “aim”, “anticipate”, “assume”, “believe”, “estimate”, “expect”, “goal”, “intend”, “objective”, “plan”, “potential”, “strategy”, “target”, and similar expressions or statements that certain actions, events or results “may”, “could”, “would”, “might”, “will”, or are “likely” to be taken, occur or be achieved, have been used to identify such forward-looking information. Specific forward looking statements in this press release include, but are not limited to, statements and information with respect to the exploration and resource potential of the Boumadine project, including of the Boumadine Main Trend, Imariren and Tizi; the Company’s future drilling program, including as discussed under the section "Next Steps"; the expected scope, pace, placement, focus, and completion timing of drilling activities; the anticipated completion of a feasibility study for the Project in 2027; the expected impact of geological interpretations on mine planning, resource modelling, and operational priorities; and other assumptions and factors generally associated with the mining industry. Forward-looking information is based upon certain assumptions and other important factors that, if untrue, could cause the actual results, performance or achievements of the Company to be materially different from future results, performance or achievements expressed or implied by such information or statements. There can be no assurance that such information or statements will prove to be accurate. Key assumptions upon which the Company’s forward looking information is based include without limitation, the Company’s ability to timely receive any requisite approvals, permits or licences; the feasibility study as and when anticipated; the Company’s ability to import goods and machinery; the Company’s ability to engage and retain all necessary personnel in order to operate its business properly and without interruption; the accuracy and reliability of estimates, projections, forecasts, studies and assessments, including the mineral reserve and mineral resource estimates (including, but not limited to, ore tonnage and ore grade estimates); the Company’s ability to meet or achieve estimates, projections and forecasts; assumptions regarding development and exploration activities; the timing, extent, duration and economic viability of such explorations activities; process recovery; the price of commodities, including silver and gold; exchange rates; taxation levels; fuel and energy costs; future economic conditions; the Company’s ability to meet current and future obligations; the Company’s ability to obtain timely financing on reasonable terms when required; the current and future social, economic and political conditions and environment in which the Company operates; and other assumptions and factors generally associated with the mining industry. Readers are cautioned that the foregoing list is not exhaustive of all factors and assumptions which may have been used. Forward-looking statements are also subject to risks and uncertainties facing the Company’s business, any of which could have a material adverse effect on the Company’s business, financial condition, results of operations and growth prospects. Some of the risks the Company faces and the uncertainties that could cause actual results to differ materially from those expressed in the forward-looking statements include, among others: the inherent risks involved in exploration and development of mineral properties, including risks and hazards associated with the business of mineral exploration, development, and mining, including environmental hazards, potential unintended releases of contaminants, industrial accidents, unusual or unexpected geological or structural formations, pressures, cave-ins, and flooding; risks related to Aya’s operations in Morocco; the speculative nature of mineral exploration and development; inadequate or unreliable infrastructure (such as roads, bridges, power sources and water supplies); fluctuations in forward markets for silver and other commodities (such as natural gas, fuel, oil and electricity); availability of gas, fuel, and oil; restrictions on mining in the jurisdictions in which Aya operates; change in laws and regulations governing our operations, exploration, and development activities, including international laws and legal norms, such as those relating to Indigenous peoples and human rights; expectations with respect to any future pandemics on our operations, and assumptions related thereto; Aya’s ability to attract and retain qualified employees and contractors; Aya’s ability to obtain and renew necessary permits and licenses; Aya’s ability to obtain and maintain insurance; third party risks; disruptions to Aya’s business operations; Aya’s reliance on technology and information systems; interest and exchange rates risks; tax risks; unforeseen expenses; public health crises; climate change; weather disruptions; general economic conditions; commodity prices; gold and silver demand; force majeure; the inherent risks involved in exploration and development of mineral properties; and other risks described in the Company’s documents filed with Canadian and U.S. securities regulatory authorities. In addition, readers are directed to carefully review the detailed risk discussion in the Company’s Annual Information Form and Management’s Discussion & Analysis for the year ended December 31, 2025, filed on SEDAR+ and on EDGAR, which discussions are incorporated by reference in this press release, for a fuller understanding of the risks and uncertainties that affect the Company’s business and operations. Although the Company believes its expectations are based upon reasonable assumptions and has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. As such, these risks are not exhaustive; however, they should be considered carefully. If any of these risks or uncertainties materialize, actual results may vary materially from those anticipated in the forward-looking statements found herein. Due to the risks, uncertainties, and assumptions inherent in forward-looking statements, readers should not place undue reliance on forward-looking statements. Forward-looking statements contained herein are presented for the purpose of assisting investors in understanding the Company’s business plans, financial performance and condition and may not be appropriate for other purposes. The forward-looking statements contained herein are made only as of the date hereof. The Company disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except to the extent required by applicable law. The Company qualifies all of its forward-looking statements by these cautionary statements. Appendix 1 - Full Drill Results from Boumadine (core lengths) DDH No. From To Au Ag Length1 Cu Pb Zn Mo Ag Eq2 (m) (m) (g/t) (g/t) (m) (%) (%) (%) (g/t) (g/t) BOU-DD26-1029  58.0   59.0   0.61   0   1.0   0.0   0.0   0.0   5   56  BOU-DD26-1029  165.0   166.0   2.27   3   1.0   0.0   0.1   0.0   5   208  BOU-DD26-1030  0.0   404.0   0.00   0   404.0   0.0   0.0   0.0   0  NSR BOU-DD26-1031  89.0   89.8   0.03   187   0.8   0.1   3.5   1.3   11   289  BOU-DD26-1031  144.0   145.0   0.03   250   1.0   0.0   0.1   0.1   4   257  BOU-DD26-1031  163.0   164.0   0.03   100   1.0   0.0   0.0   0.0   1   104  BOU-DD26-1031  168.0   169.0   0.03   142   1.0   0.0   0.0   0.0   0   145  BOU-DD26-1032  91.5   94.0   1.82   25   2.5   0.1   0.1   0.5   18   210  BOU-DD26-1033  16.0   21.0   0.03   127   5.0   0.0   0.0   0.0   1   131  BOU-DD26-1033  133.7   134.2   1.22   24   0.5   0.0   0.1   0.1   1   138  BOU-DD26-1033  136.3   142.2   0.69   12   5.9   0.0   0.0   0.1   0   79  Including  136.3   137.7   1.24   12   1.4   0.0   0.1   0.1   0   127  BOU-DD26-1033  173.6   177.2   1.23   34   3.6   0.1   0.4   1.8   43   197  BOU-DD26-1034  217.9   218.4   0.35   22   0.5   0.1   0.9   2.0   7   120  BOU-DD26-1034  229.2   233.9   3.20   77   4.7   0.1   0.4   2.9   74   442  Including  230.4   233.0   4.61   108   2.6   0.2   0.5   4.8   63   645  BOU-DD26-1035  31.8   32.8   0.78   15   1.0   0.0   0.1   0.2   5   93  BOU-DD26-1035  36.1   37.0   0.68   18   0.9   0.0   1.2   0.8   5   118  BOU-DD26-1035  225.0   226.0   0.40   31   1.0   0.0   0.2   0.1   8   72  BOU-DD26-1035  268.0   269.0   0.57   12   1.0   0.0   0.2   0.4   7   78  BOU-DD26-1035  273.0   274.0   0.15   37   1.0   0.1   2.1   2.6   3   146  BOU-DD26-1035  273.0   275.0   0.43   35   2.0   0.1   1.9   2.5   5   164  BOU-DD26-1035  273.0   276.0   0.43   36   3.0   0.1   2.0   2.8   4   176  BOU-DD26-1035  278.0   279.0   0.33   31   1.0   0.1   1.5   6.7   6   234  BOU-DD26-1035  287.0   288.0   0.07   89   1.0   0.0   0.4   1.0   4   126  BOU-DD26-1035  293.2   301.4   0.47   23   8.2   0.1   1.0   2.1   4   134  BOU-DD26-1036  71.6   72.2   1.53   19   0.6   0.0   0.6   1.8   4   205  BOU-DD26-1036  332.9   336.7   2.12   16   3.8   0.0   0.1   0.0   3   211  BOU-DD26-1037  135.0   136.0   0.12   42   1.0   0.3   2.8   0.9   156   151  BOU-DD26-1037  178.5   179.0   0.66   72   0.5   0.3   0.3   0.6   17   176  BOU-DD26-1037  184.6   185.4   0.06   246   0.8   0.1   0.0   0.0   0   256  BOU-DD26-1037  218.9   219.5   0.69   23   0.6   0.1   0.9   2.8   7   163  BOU-DD26-1037  260.0   260.9   0.84   6   0.9   0.0   0.1   0.2   4   88  BOU-DD26-1038  3.6   4.5   0.03   57   0.9   0.0   0.0   0.1   1   63  BOU-DD26-1038  186.3   186.8   0.63   17   0.5   0.0   0.1   0.0   5   78  BOU-DD26-1038  256.2   260.3   0.59   6   4.1   0.0   0.0   0.2   5   64  BOU-DD26-1038  274.5   276.2   0.90   6   1.7   0.0   0.1   0.3   3   95  BOU-DD26-1038  283.4   284.3   0.48   12   0.9   0.0   0.5   0.9   5   84  BOU-DD26-1038  291.8   298.5   2.25   19   6.7   0.0   0.2   0.8   4   245  Including  291.8   294.2   4.71   27   2.4   0.0   0.1   0.7   2   468  BOU-DD26-1039  30.4   31.4   0.62   19   1.0   0.0   1.6   2.4   7   154  BOU-DD26-1039  91.9   92.9   2.12   25   1.0   0.0   0.4   0.3   8   231  BOU-DD26-1040  25.0   26.0   0.12   55   1.0   0.0   1.1   2.2   6   130  BOU-DD26-1040  28.0   28.9   0.19   36   0.9   0.0   1.1   2.7   5   130  BOU-DD26-1040  112.0   118.0   1.08   19   6.0   0.0   0.2   1.7   7   157  Including  114.9   117.0   2.11   25   2.1   0.0   0.1   0.5   8   230  BOU-DD26-1041  169.6   174.2   0.81   28   4.6   0.2   0.2   1.1   10   144  BOU-DD26-1042  94.0   95.0   0.03   87   1.0   0.0   0.2   0.2   5   96  BOU-DD26-1042  420.8   421.6   4.68   51   0.8   0.2   0.8   0.5   4   510  BOU-DD26-1042  432.4   432.9   2.44   23   0.5   0.2   0.1   0.2   5   262  BOU-DD26-1042  435.3   439.2   1.83   19   3.9   0.0   0.0   0.1   4   187  Including  435.3   436.7   3.75   35   1.4   0.0   0.0   0.0   5   374  BOU-DD26-1043  205.0   210.6   1.70   25   5.6   0.0   0.5   2.5   7   239  Including  206.3   208.4   3.14   43   2.1   0.1   0.9   4.0   10   429  BOU-DD26-1044  242.6   243.5   0.70   10   0.9   0.1   0.0   0.1   6   83  BOU-DD26-1044  268.2   269.3   3.01   30   1.1   0.1   0.1   0.9   7   326  BOU-DD26-1044  312.8   314.7   1.02   5   1.9   0.0   0.0   0.0   4   99  BOU-DD26-1044  317.8   318.7   0.61   0   0.9   0.0   0.0   0.1   4   58  BOU-DD26-1044  337.4   338.9   0.82   14   1.5   0.0   0.9   1.1   10   129  BOU-DD26-1045  319.1   320.1   0.03   56   1.0   0.0   0.0   0.0   5   59  BOU-DD26-1046  0.0   333.0   0.00   0   333.0   0.0   0.0   0.0   0  NSR BOU-DD26-1047  54.6   55.1   1.04   244   0.5   2.7   19.5   3.1   5   974  BOU-DD26-1047  66.8   67.6   0.39   17   0.8   0.0   0.7   1.2   3   91  BOU-DD26-1048  0.0   375.0   0.00   0   375.0   0.0   0.0   0.0   0  NSR BOU-DD26-1049  224.7   227.6   1.50   21   2.9   0.0   2.1   0.6   15   209  BOU-DD26-1049  224.7   235.2   0.95   17   10.5   0.0   1.2   1.0   9   148  BOU-DD26-1049  268.3   269.2   0.44   11   0.9   0.0   0.8   0.1   20   70  BOU-DD26-1049  318.3   320.6   0.18   112   2.3   0.0   1.4   0.1   1   158  BOU-DD26-1050  0.0   397.3   0.00   0   397.3   0.0   0.0   0.0   0  NSR BOU-DD26-1051  99.5   101.4   0.47   25   1.9   0.0   0.8   5.1   5   188  BOU-DD26-1051  103.4   104.4   0.70   11   1.0   0.0   0.3   1.4   3   109  BOU-DD26-1051  107.4   108.4   0.61   9   1.0   0.0   0.5   1.2   2   98  BOU-DD26-1051  112.2   113.2   0.03   70   1.0   0.0   0.0   0.1   1   74  BOU-DD26-1052  262.8   268.5   1.99   21   5.7   0.0   0.3   0.4   5   216  Including  264.9   267.0   3.80   31   2.1   0.1   0.3   0.3   6   388  BOU-DD26-1052  281.0   282.0   0.06   47   1.0   0.0   0.3   0.2   6   64  BOU-DD26-1052  356.7   357.6   0.50   9   0.9   0.0   0.3   1.5   0   92  BOU-DD26-1052  453.2   453.7   0.91   27   0.5   0.0   0.3   0.2   12   118  BOU-DD26-1052  458.0   458.6   0.79   11   0.6   0.0   0.1   0.1   3   86  BOU-DD26-1052  459.8   460.8   0.86   20   1.0   0.0   0.2   0.3   6   109  BOU-DD26-1053  29.8   30.8   0.08   89   1.0   0.0   0.3   0.7   5   118  BOU-DD26-1053  34.4   38.9   0.84   113   4.5   0.0   1.4   2.6   6   269  BOU-DD26-1053  299.0   299.5   1.29   23   0.5   0.1   0.2   0.4   1   155  BOU-DD26-1053  315.5   316.7   1.72   19   1.2   0.0   0.2   1.4   3   207  BOU-DD26-1053  329.3   330.0   3.99   29   0.7   0.0   0.0   0.1   0   391  BOU-DD26-1053  395.5   396.4   0.28   26   0.9   0.0   1.3   1.6   75   113  BOU-DD26-1053  397.5   398.0   1.20   29   0.5   0.1   0.9   2.1   169   204  BOU-DD26-1053  402.2   405.0   1.06   19   2.8   0.0   0.0   0.2   0   122  BOU-DD26-1053  454.0   455.0   0.84   6   1.0   0.0   0.2   0.5   0   96  BOU-DD26-1054  6.8   7.8   0.61   9   1.0   0.0   0.6   0.0   9   79  BOU-DD26-1054  53.0   54.0   0.29   27   1.0   0.0   1.2   1.7   9   112  BOU-DD26-1054  142.7   143.5   0.52   24   0.8   0.0   2.4   1.7   0   153  BOU-DD26-1054  152.4   153.0   0.41   21   0.6   0.0   0.4   0.4   0   75  BOU-DD26-1055  40.6   42.6   1.06   2   2.0   0.0   0.0   0.0   2   97  BOU-DD26-1055  44.6   45.6   0.56   5   1.0   0.0   0.0   0.1   6   57  BOU-DD26-1055  299.0   301.2   4.39   37   2.2   0.1   0.2   0.3   6   450  BOU-DD26-1055  400.0   401.0   0.13   61   1.0   0.1   0.1   0.0   10   85  BOU-DD26-1055  482.7   483.6   0.61   0   0.9   0.0   0.0   0.0   1   56  BOU-DD26-1055  485.4   486.0   0.93   22   0.6   0.0   0.2   0.1   1   114  BOU-DD26-1055  493.0   494.0   0.64   1   1.0   0.0   0.0   0.0   12   60  BOU-DD26-1055  505.2   505.8   0.42   18   0.6   0.1   1.4   2.1   5   128  BOU-DD26-1055  506.8   507.7   0.89   9   0.9   0.0   0.4   0.3   6   105  BOU-DD26-1056  61.7   62.6   3.83   177   0.9   0.2   0.3   1.4   4   569  BOU-DD26-1056  74.0   75.0   0.47   12   1.0   0.0   0.9   1.1   1   93  BOU-DD26-1056  202.3   203.2   0.56   9   0.9   0.0   0.6   0.6   2   83  BOU-DD26-1057  120.0   122.0   1.01   14   2.0   0.0   0.1   0.3   2   113  BOU-DD26-1057  131.0   144.2   0.79   10   13.2   0.0   0.0   0.2   2   87  Including  136.2   138.2   1.63   32   2.0   0.0   0.1   0.5   1   192  BOU-DD26-1058  303.0   304.0   0.03   58   1.0   0.0   0.0   0.0   0   61  BOU-DD26-1058  330.9   332.3   1.79   18   1.4   0.0   0.4   1.6   4   221  BOU-DD26-1059  196.0   201.0   0.61   0   5.0   0.0   0.0   0.0   4   57  BOU-DD26-1059  204.0   205.0   0.59   0   1.0   0.0   0.0   0.0   0   55  BOU-DD26-1060  172.2   173.1   1.18   2   0.9   0.0   0.0   0.2   1   113  BOU-DD26-1060  365.2   368.2   0.62   34   3.0   0.1   0.4   2.3   2   148  Including  365.2   365.7   1.14   49   0.5   0.1   0.7   4.2   3   259  BOU-DD26-1060  484.4   485.0   0.25   32   0.6   0.1   7.2   0.4   0   203  BOU-DD26-1060  498.6   499.2   0.53   19   0.6   0.0   0.2   0.6   3   84  BOU-DD26-1060  500.5   503.3   2.25   29   2.8   0.0   0.2   5.0   1   342  BOU-DD26-1061  19.0   22.0   0.06   99   3.0   0.5   0.0   0.1   1   143  BOU-DD26-1061  24.0   25.9   0.08   83   1.9   0.3   0.2   0.1   3   121  BOU-DD26-1061  143.5   144.0   0.32   51   0.5   0.1   1.8   6.8   2   258  BOU-DD26-1061  171.1   173.0   0.46   21   1.9   0.0   0.2   0.4   3   78  BOU-DD26-1061  175.0   178.8   1.55   23   3.8   0.0   0.1   0.4   5   174  BOU-DD26-1061  258.3   259.3   0.62   13   1.0   0.0   0.8   0.8   0   100  BOU-DD26-1063  94.8   95.5   0.48   85   0.7   0.0   3.7   2.2   8   244  BOU-DD26-1063  356.8   357.4   0.76   10   0.6   0.0   0.1   0.4   3   91  BOU-DD26-1063  360.7   361.8   2.68   45   1.1   0.0   0.1   2.5   3   340  BOU-DD26-1063  362.8   363.8   0.60   20   1.0   0.0   0.1   0.2   3   80  BOU-DD26-1063  366.8   367.8   2.54   5   1.0   0.0   0.0   0.0   4   236  BOU-DD26-1063  377.3   377.8   0.86   23   0.5   0.0   0.8   0.4   4   125  BOU-DD26-1064  198.5   200.7   1.68   22   2.2   0.0   0.1   0.1   13   176  BOU-DD26-1064  213.4   214.2   0.06   77   0.8   0.7   0.3   0.1   4   143  BOU-DD26-1064  250.0   251.0   0.08   48   1.0   0.3   0.1   0.1   2   81  BOU-DD26-1064  257.0   258.7   0.67   43   1.7   0.1   0.3   0.3   3   126  BOU-DD26-1064  293.0   294.0   4.44   2   1.0   0.0   0.2   0.2   2   409  BOU-DD26-1064  377.7   378.6   0.44   34   0.9   0.0   1.1   1.8   0   133  BOU-DD26-1064  381.4   382.4   0.38   31   1.0   0.0   0.3   0.6   3   83  BOU-DD26-1065  72.0   72.6   0.64   11   0.6   0.0   0.5   1.1   1   100  BOU-DD26-1065  246.0   249.7   1.43   15   3.7   0.0   0.1   0.6   6   161  BOU-DD26-1065  254.7   255.3   0.61   11   0.6   0.0   0.0   0.1   4   69  BOU-DD26-1065  258.4   259.8   0.81   21   1.4   0.0   0.0   0.0   3   98  BOU-DD26-1065  267.1   269.9   2.69   30   2.8   0.2   0.1   0.1   3   290  Including  267.1   268.1   4.66   39   1.0   0.5   0.0   0.1   3   495  BOU-DD26-1065  282.1   290.4   1.83   32   8.3   0.1   0.1   0.1   3   205  Including  284.0   286.7   3.31   71   2.7   0.1   0.1   0.1   3   382  BOU-DD26-1065  293.3   294.0   1.47   30   0.7   0.1   0.1   0.6   3   186  BOU-DD26-1065  314.6   315.5   3.84   13   0.9   0.0   0.1   0.1   5   362  BOU-DD26-1066  58.6   59.3   1.02   24   0.7   0.0   0.0   0.0   12   117  BOU-DD26-1066  62.5   63.1   0.72   17   0.6   0.1   0.1   0.0   9   94  BOU-DD26-1066  72.5   73.5   0.97   9   1.0   0.0   0.0   0.0   6   97  BOU-DD26-1066  75.0   76.0   0.81   3   1.0   0.0   0.1   0.0   3   78  BOU-DD26-1066  406.3   407.1   1.54   19   0.8   0.1   0.5   1.9   7   212  BOU-DD26-1067  0.0   404.0   0.00   0   404.0   0.0   0.0   0.0   0  NSR BOU-DD26-1068  63.0   64.0   0.62   6   1.0   0.0   0.0   0.1   6   67  BOU-DD26-1068  450.0   451.0   0.92   9   1.0   0.0   0.1   0.2   15   98  BOU-DD26-1069  39.9   42.2   0.65   33   2.3   0.0   1.2   1.8   22   152  BOU-DD26-1069  53.6   55.0   1.79   69   1.4   0.0   4.2   7.2   31   458  BOU-DD26-1069  62.6   63.5   0.14   41   0.9   0.0   0.1   0.5   10   67  BOU-DD26-1069  65.3   65.8   1.51   54   0.5   0.1   2.6   3.2   14   312  BOU-DD26-1070  505.0   506.0   0.65   7   1.0   0.0   0.0   0.1   3   68  BOU-DD26-1071  116.3   117.0   1.22   15   0.7   0.0   0.6   1.4   3   165  BOU-DD26-1071  303.0   306.8   0.82   11   3.8   0.0   0.3   0.7   5   108  BOU-DD26-1071  313.7   315.4   0.67   9   1.7   0.0   0.2   0.4   2   82  BOU-DD26-1071  332.0   333.0   0.62   7   1.0   0.0   0.0   0.1   2   66  BOU-DD26-1071  336.7   337.4   1.12   19   0.7   0.0   0.0   0.0   3   123  BOU-DD26-1071  362.4   366.1   5.53   68   3.7   0.3   0.1   1.7   2   621  Including  362.4   364.8   7.98   72   2.4   0.3   0.1   2.5   1   862  BOU-DD26-1071  367.3   367.8   0.92   11   0.5   0.1   0.0   2.1   4   147  BOU-DD26-1072  70.0   71.0   0.47   19   1.0   0.0   0.8   1.5   3   110  BOU-DD26-1072  81.0   82.0   0.47   16   1.0   0.0   0.8   1.5   8   105  BOU-DD26-1072  94.6   111.6   1.69   36   17.0   0.1   0.3   1.7   12   239  Including  104.5   106.2   7.94   118   1.7   0.6   0.3   3.6   12   953  BOU-DD26-1072  113.2   114.0   0.70   15   0.8   0.0   0.2   0.7   9   96  BOU-DD26-1072  118.9   119.4   0.27   51   0.5   0.0   0.9   3.3   65   160  BOU-DD26-1072  133.0   134.0   0.03   58   1.0   0.0   0.2   0.1   4   66  BOU-DD26-1072  147.0   148.0   0.56   6   1.0   0.0   0.2   0.0   19   62  BOU-DD26-1073  30.7   31.3   1.09   11   0.6   0.0   0.2   0.1   4   115  BOU-DD26-1073  32.7   34.7   2.15   28   2.0   0.0   0.1   0.1   5   228  BOU-DD26-1073  46.0   47.0   0.03   64   1.0   0.0   0.8   0.6   0   94  BOU-DD26-1073  76.0   77.0   0.45   13   1.0   0.0   0.1   0.0   2   56  BOU-DD26-1073  159.0   160.0   0.85   11   1.0   0.0   0.1   0.4   3   98  BOU-DD26-1073  276.1   277.1   0.79   11   1.0   0.0   0.6   1.2   4   118  BOU-DD26-1074  37.7   39.1   0.77   15   1.4   0.0   0.1   0.6   11   100  BOU-DD26-1074  52.0   59.3   0.64   28   7.3   0.0   1.8   2.7   21   176  Including  55.8   57.9   1.18   26   2.1   0.0   1.4   3.4   34   230  BOU-DD26-1074  61.0   62.0   0.50   22   1.0   0.0   0.8   2.7   26   141  BOU-DD26-1074  75.5   76.1   0.78   16   0.6   0.0   1.2   1.9   20   148  BOU-DD26-1074  89.8   91.0   4.00   38   1.2   0.1   1.1   2.3   59   472  BOU-DD26-1075  286.9   287.8   0.87   0   0.9   0.0   0.0   0.1   0   80  BOU-DD26-1076  140.0   141.0   0.03   62   1.0   0.0   2.6   1.6   25   147  BOU-DD26-1076  144.2   145.0   0.59   18   0.8   0.1   0.8   3.6   20   168  BOU-DD26-1076  146.5   158.4   1.56   28   11.9   0.1   1.3   3.3   15   269  Including  147.1   149.7   3.94   65   2.6   0.4   2.7   6.6   19   635  BOU-DD26-1077  39.1   41.5   1.40   44   2.4   0.1   0.4   0.5   8   192  BOU-DD26-1077  43.4   44.0   0.24   74   0.6   0.1   2.6   7.8   12   310  BOU-DD26-1077  50.0   51.0   0.81   32   1.0   0.0   0.5   0.6   60   129  BOU-DD26-1077  54.9   59.1   1.10   26   4.2   0.0   0.3   0.7   44   145  BOU-DD26-1077  61.0   62.0   0.45   13   1.0   0.0   0.1   0.4   48   65  BOU-DD26-1078  154.9   164.0   1.96   31   9.1   0.1   1.5   4.5   33   331  BOU-DD26-1078  166.0   167.0   0.67   9   1.0   0.0   0.7   0.0   16   83  BOU-DD26-1078  168.0   169.0   0.60   8   1.0   0.0   0.3   0.0   9   69  BOU-DD26-1078  170.0   172.0   0.62   11   2.0   0.0   0.6   0.2   11   83  BOU-DD26-1078  174.2   177.2   1.85   22   3.0   0.1   0.2   1.4   10   225  BOU-DD26-1079  42.5   43.4   0.46   16   0.9   0.0   0.4   0.8   5   82  BOU-DD26-1079  46.1   47.9   0.31   57   1.8   0.0   0.3   0.2   31   98  BOU-DD26-1079  114.0   115.4   0.37   23   1.4   0.0   1.3   1.0   13   101  BOU-DD26-1079  141.2   142.1   0.41   38   0.9   0.1   0.1   0.5   10   94  BOU-DD26-1080  252.6   258.1   0.77   13   5.5   0.0   0.4   0.5   6   103  Including  252.6   254.2   1.20   12   1.6   0.1   0.1   1.0   8   147  True width remains undetermined at this stage; all values are uncut. Ag equivalent is based on a silver price of US$30/oz with a process recovery of 96%, a gold price of US$2,800/oz with a process recovery of 96%, a zinc price of US$1.20/lb with a process recovery of 75%, a lead price of US$1.00/lb with a process recovery of 82%, and a copper price of US$4.60/lb with a process recovery of 75% resulting in the following ratios: 1g/t Au: 89.7g/t Ag; 1% Cu: 78.6 g/t Ag; 1% Pb: 18.7 g/t Ag; and 1% Zn: 20.4 g/t Ag. Appendix 2 – New Drillhole Coordinates of 2026 Boumadine Exploration Program (completed holes) Hole No. Easting Northing Elevation Azimuth Dip Length (m) BOU-DD26-1131  316580   3477493   1219   248   -50  174  BOU-DD26-1132  317131   3476252   1216   250   -50  418  BOU-DD26-1133  315776   3477353   1287   271   -49  453  BOU-DD26-1134  315818   3477362   1285   270   -50  405  BOU-DD26-1135  315348   3477264   1270   270   -50  148  BOU-DD26-1136  315315   3477262   1277   270   -50  105  BOU-DD26-1137  316620   3477507   1217   250   -50  201  BOU-DD26-1138  315750   3476900   1267   270   -50  449  BOU-DD26-1139  315387   3477263   1267   270   -50  180  BOU-DD26-1140  316071   3476904   1248   270   -50  401  BOU-DD26-1141  316655   3477522   1207   247   -49  267  BOU-DD26-1142  316695   3477538   1209   250   -50  306  BOU-DD26-1143  315488   3477261   1218   270   -50  306  BOU-DD26-1144  315485   3477259   1271   270   -50  297  BOU-DD26-1145  315538   3477261   1290   270   -50  327  BOU-DD26-1146  316735   3477551   1209   248   -50  345  BOU-DD26-1147  316775   3477565   1208   250   -50  351  BOU-DD26-1148  315582   3477258   1292   269   -50  420  BOU-DD26-1149  315622   3477258   1285   269   -50  201  BOU-DD26-1150  315659   3477263   1280   270   -50  267  BOU-DD26-1151  316820   3477581   1214   250   -50  426  BOU-DD26-1152  315697   3477257   1275   270   -50  250  BOU-DD26-1153  315743   3477259   1278   270   -50  300  BOU-DD26-1154  316862   3477596   1213   248   -51  459  BOU-DD26-1155  315793   3477263   1290   270   -50  351  BOU-DD26-1156  315375   3477161   1267   270   -50  153  BOU-DD26-1157  315418   3477163   1264   270   -50  153  BOU-DD26-1158  316558   3477438   1217   249   -50  114  BOU-DD26-1159  316899   3477610   1206   250   -50  510  BOU-DD26-1160  316391   3476900   1232   270   -52  404  BOU-DD26-1161  317492   3476414   1208   250   -50  350  BOU-DD26-1162  315527   3477157   1288   270   -50  321  BOU-DD26-1163  316713   3476896   1231   270   -49  401  BOU-DD26-1164  316628   3477455   1214   249   -50  204  BOU-DD26-1165  315377   3477054   1265   270   -50  126  BOU-DD26-1166  315569   3477158   1287   269   -50  351  BOU-DD26-1167  315410   3477055   1255   270   -50  154  BOU-DD26-1168  316699   3477483   1207   249   -51  324  BOU-DD26-1169  315476   3477055   1279   270   -50  207  BOU-DD26-1170  315523   3477054   1287   270   -50  261  BOU-DD26-1171  315412   3476953   1255   270   -50  150  BOU-DD26-1172  316778   3477508   1209   250   -50  330  BOU-DD26-1173  315563   3477054   1284   270   -50  303  BOU-DD26-1174  316864   3477545   1216   249   -50  435  BOU-DD26-1176  315597   3477053   1275   270   -50  357  BOU-DD26-1177  315459   3476953   1264   270   -50  207  BOU-DD26-1178  317580   3476448   1201   250   -50  452  BOU-DD26-1179  315512   3476953   1275   270   -50  228  BOU-DD26-1180  316590   3477392   1216   249   -51  231  BOU-DD26-1181  315553   3476956   1272   270   -50  258  BOU-DD26-1182  316635   3477404   1220   250   -50  258  BOU-DD26-1183  315424   3476860   1259   270   -50  108  BOU-DD26-1184  316674   3477423   1220   250   -50  318  BOU-DD26-1185  317434   3476436   1210   250   -50  254  BOU-DD26-1186  315601   3476956   1275   270   -50  306  BOU-DD26-1187  315466   3476859   1260   270   -50  156  BOU-DD26-1188  316712   3477433   1216   250   -50  354  BOU-DD26-1189  316746   3477448   1208   249   -50  405  BOU-DD26-1190  315511   3476864   1258   270   -50  204  BOU-DD26-1191  317506   3476465   1206   250   -51  303  BOU-DD26-1192  315561   3476862   1266   270   -50  252  BOU-DD26-1193  316792   3477465   1211   250   -50  453  BOU-DD26-1194  315604   3476861   1269   269   -50  306  BOU-DD26-1195  316794   3477411   1218   249   -50  414  BOU-DD26-1196  315407   3476759   1251   270   -50  105  BOU-DD26-1197  317398   3476485   1208   250   -50  251  BOU-DD26-1199  315443   3476757   1241   270   -50  105  BOU-DD26-1200  315485   3476759   1241   270   -50  159  BOU-DD26-1201  317440   3476502   1207   250   -50  275  BOU-DD26-1203  317526   3476533   1207   250   -50  380  BOU-DD26-1204  316917   3477459   1219   250   -50  465  BOU-DD26-1205  317108   3476832   1213   250   -50  255  BOU-DD26-1207  317160   3476849   1214   250   -50  327  BOU-DD26-1208  316950   3477468   1211   249   -49  501  BOU-DD26-1210  317069   3476872   1218   250   -50  252  BOU-DD26-1214  317167   3476961   1209   250   -50  375  BOU-DD26-1215  317551   3476599   1208   250   -50  380  BOU-DD26-1217  315460   3476808   1244   270   -50  111  BOU-DD26-1220  317250   3476991   1206   250   -50  480  BOU-DD26-1222  315425   3476901   1264   270   -50  111  BOU-RC26-070  317533   3477699   1193   270   -50  95  BOU-RC26-071  317625   3477697   1201   270   -50  10  BOU-RC26-072  317627   3477701   1201   270   -50  150  BOU-RC26-073  317716   3477700   1205   270   -50  150  BOU-RC26-074  317863   3477696   1189   270   -50  150  BOU-RC26-075  317954   3477693   1187   270   -50  150  Photos accompanying this announcement are available at https://www.globenewswire.com/NewsRoom/AttachmentNg/aca39656-9abb-48ff-ab72-0aae2c38f125 https://www.globenewswire.com/NewsRoom/AttachmentNg/00ddcf38-fe00-4a6a-9cc8-75f8a07c223b https://www.globenewswire.com/NewsRoom/AttachmentNg/e2e506ce-b308-4032-b7a5-30145c1fc560 https://www.globenewswire.com/NewsRoom/AttachmentNg/df0bc63e-713d-4df5-baa1-4d8c27f70d08  Figure 1 Boumadine Mining Licence Surface Plan with Magnetic Data (Residual Total Field) and 2026 Drill Holes Figure 2 Location of New Permits at Boumadine Figure 3 Surface Plan of Boumadine North Zone with New DDH Results Figure 4 Surface Plan of Boumadine South Zone with New DDH Results © 2026 Canjex Publishing Ltd. All rights reserved.
View at source ↗