Northwire Canada EditionSaturday, August 1, 2026
Northwire
S 0.140 +0.0% BNKR 4.40 −2.2% QRO 0.045 +0.0% VCT 0.075 +36.4% PPP 1.15 +0.9% LMG 0.390 +0.0% GRDM 0.140 +0.0% ABRA 13.58 −4.1% WHY 0.295 +1.7% HHH 3.94 −0.2% COS 0.060 +0.0% NOB 0.065 −23.5% MEK 0.055 +0.0% TGOL 0.105 −4.5% FCI 0.400 −7.0% SGQ 0.350 +0.0% S 0.140 +0.0% BNKR 4.40 −2.2% QRO 0.045 +0.0% VCT 0.075 +36.4% PPP 1.15 +0.9% LMG 0.390 +0.0% GRDM 0.140 +0.0% ABRA 13.58 −4.1% WHY 0.295 +1.7% HHH 3.94 −0.2% COS 0.060 +0.0% NOB 0.065 −23.5% MEK 0.055 +0.0% TGOL 0.105 −4.5% FCI 0.400 −7.0% SGQ 0.350 +0.0%
Drill Results

Formation Metals adds second drill rig to N2

FOMO · Price

Executive Summary

  • Formation Metals mobilized a second drill rig to accelerate its fully‑financed Phase 1 (14,000 m) drilling program at the N2 gold project.
  • The company now has $12.1 M of working capital and zero debt; 2025/26 exploration budget is ~$8.1 M (including Quebec tax credits).
  • To date 16 holes (4,743 m) have been completed, with notable shallow, wide mineralization intercepts (e.g., 208.8 m from 28.6 m depth at N2‑25‑008).

Key Details

  • Second rig deployment: Enables systematic testing of priority targets across the A and RJ zones over >8 km of strike, speeding delivery of a maiden resource estimate expected in Q3 after ~70,000 m total drilling.
  • Working capital & financing: $12.1 M cash on hand; exploration budget for 2025/26 set at ~$8.1 M (incl. provincial tax credits). No debt.
  • Historic resource context: Global historic resource ≈871,000 oz Au (18 Mt @ 1.4 g/t) plus a high‑grade component of ~61,000 oz Au (243 kt @ 7.82 g/t) in the RJ zone.
  • Phase 1 objectives:
  • Infill shallow gaps to boost near‑surface confidence.
  • Test downdip extensions and strike step‑outs beyond historic limits.
  • Collect core for metallurgical testing.
  • Drilling results to date (16 holes, 4,743 m):
  • N2‑25‑008 – 208.8 m of target mineralization starting at 28.6 m depth; multiple >40 m intervals, up to 70 m continuous.
  • N2‑25‑011 – 166.8 m of target mineralization beginning at 60 m depth; several >20 m intervals, up to 70.6 m continuous.
  • 9/13 holes intersected target mineralization within the first 25 m; 10 holes each had ≥80 m cumulative intercepts.
  • Historical analogues (high‑grade examples):
  • A zone – 1.48 g/t Au over 13.7 m, 2.02 g/t Au over 15 m.
  • RJ zone – 48.4 g/t Au over 0.5 m, 24.5 g/t Au over 0.9 m, 16.5 g/t Au over 3.6 m, etc.
  • Project scale: 87 claims covering ~4,400 ha in the Abitibi greenstone belt; six primary zones all open at depth and along strike.
  • Exploration upside: >3.1 km of untested strike in A zone; >4.75 km in RJ zone; historic drilling limited to shallow depths (~350 m).
  • Base‑metal potential: Recent revaluation shows Cu 200–4,750 ppm and Zn 203–6,700 ppm in historic gold‑bearing holes, indicating possible copper‑zinc by‑product.
  • Infrastructure: Located ~25 km south of Matagami, QC; year‑round road access; proximity to processing facilities (Casa Berardi mill, other Abitibi mills).

Notable Quotes

“Momentum continues to build at N2… accelerating phase 1 with a second rig was an easy decision… we look forward to sharing updates as we progress with our winter campaign.” – Deepak Varshney, CEO, Formation Metals Inc.

Read the original news release →

More from Formation Metals Inc