Northwire Canada EditionWednesday, August 5, 2026
Northwire
NTR 93.88 −0.3% ERO 42.71 +4.6% EDR 12.55 +7.1% IFOS 2.23 −0.5% URE 1.80 −2.2% ARTG 37.67 +7.3% AAUC 27.50 +4.3% IMR 0.145 +3.6% EQX 14.50 +7.4% OGC 37.67 +6.8% TFPM 43.89 +4.4% SGD 15.42 +5.4% BKM 2.55 +3.2% OR 45.20 +4.4% CDE 24.46 +7.2% EFR 17.43 −3.8% NTR 93.88 −0.3% ERO 42.71 +4.6% EDR 12.55 +7.1% IFOS 2.23 −0.5% URE 1.80 −2.2% ARTG 37.67 +7.3% AAUC 27.50 +4.3% IMR 0.145 +3.6% EQX 14.50 +7.4% OGC 37.67 +6.8% TFPM 43.89 +4.4% SGD 15.42 +5.4% BKM 2.55 +3.2% OR 45.20 +4.4% CDE 24.46 +7.2% EFR 17.43 −3.8%
Drill Results

SOMA GOLD ANNOUNCES THE COMMENCEMENT OF DRILLING ON PSYCHE 2 COPPER ANOMALY

Soma Pivots to Tech-Driven Expansion as Exploration Rigs Turn on New Copper-Gold Anomaly

Executive Summary

The most recent news release (December 23, 2025) announces the commencement of Phase 1 drilling at the Psyche 2 copper-gold anomaly within the Machuca Project in Antioquia, Colombia. This follows the receipt of necessary permits. The program includes 4 to 5 diamond drill holes totaling approximately 2,000 meters. The target is a 4.5km soil anomaly coincident with a magnetic high. This drilling is designed to determine the style and tenor of mineralization and the type of host rock in the core of the magnetic anomaly.

Material Impact
  • Operational Impact: The news is an early-stage exploration update. While it represents the "turning of the bit" on a potentially large anomaly (4.5km strike), there are no assays yet. The primary material impact is the removal of the permitting bottleneck that had delayed this project.
  • Strategic Impact: This signals Soma’s shift toward expanding its commodity base (Copper-Gold) and moving beyond its immediate production footprint at El Bagre.
  • Contextual Importance: This news must be weighed against the December 19, 2025, announcement regarding a definitive agreement for a US$2.2M sensor-based sorting facility. That facility is arguably more material in the short term, as it targets a 62.5% upgrade in gold grade and a 55% mass rejection, which could effectively double throughput capacity without expanding the mill.
  • Financial Impact: Q3 2025 results were severely dampened by a 57-day labor strike (22 lost production days in Q3), resulting in a production loss of 5,000 ounces for the year. The current drilling and the ore-sorting project represent the company's attempt to regain momentum and hit 2026 production targets.
SOMA · Price
Company Overview

Soma Gold Corp. operates the El Bagre Gold Mining Complex in Antioquia, Colombia. - Flagship Project: The Cordero Mine, which feeds the El Bagre mill. - Secondary Assets: El Limon Mill (recently rehabilitated) and the Machuca Project (exploration). - Strategy: Utilizing internally generated cash flow and strategic financing to expand mill capacity via technology (ore sorting) and increase mine life through aggressive brownfield exploration.

Read the original news release →

More from Soma Gold Corp.